Loading...
ETL-RockyHillGreenway-amendment1-WF8-16-19-contract (2) CONTRACT NUMBER: _________ CITY OF NORTHAMPTON, MASSACHUSETTS First Amendment to Contract: Rocky Hill Greenway Multiuse Trail THIS AGREEMENT, executed this __________ day of August 2019 by and between the City of Northampton, a Massachusetts municipal corporation, acting through its Office of Planning and Sustainability with a mailing address of Wayne Feiden, Director of Planning and Sustainability, 210 Main Street, Room 11, Northampton, MA 01060, hereinafter called "Owner" and E.T. & L. Corp., with a mailing address of 873 Great Road, Stow, MA 0177590 Route 6A, Sandwich, MA 02563, party of the second part hereinafter called "Vendor". THE OWNER shall pay the Vendor for the performance of this contract amendment an amount not to exceed $11,025.31 in accordance with the attached proposal from E.T. & L. Corp. The amendment includes the stormwater permit required by the Department of Public Works stormwater permit that was issued after the initial request for bids. All other terms of the original contract and first amendment remain in effect. Pursuant to M.G.L. Chapter 62C, Section 49A, I certify under the penalties of perjury that we have,  to  my  best knowledge and belief, complied with the law of the Commonwealth relating to taxes,  reporting  of  employees  and contractors,  and  withholding  and  remitting  child  support.  I  further  authorize the City of Northampton to deduct from the amounts due under this contract, any overdue  taxes, real or personal, or any other fees due to the City of Northampton  from the  Vendor  which  become due and payable by the Vendor or its officers, directors or agents during the term of this  contract or until the final amounts due under this contract are paid in full.    The Vendor, to the best of its knowledge, certifies that a) neither it nor any of its subcontractors have  been subject to a federal or state criminal or civil judgment, administrative citation, final administrative  determination, order or debarment resulting from a violation of G.L. c. 149, c. 151, or the Fair Labor  Standards Act within three (3) years prior to the date of the Contract, or b) that if it or any of its  subcontractors have been subject to a federal or state criminal or civil judgment, administrative citation,  final administrative determination, order or debarment resulting from a violation of G.L. c. 149, c. 151, or  the Fair Labor Standards Act within three (3) years prior to the date of the Contract, the Vendor has  provided copies of any such judgment, citation, determination or order to the City prior to the date of the  Contract.  The Vendor certifies that while the Contract is in effect, it will report any instance of the above  to the City within five (5) days of Contractor's receipt IN WITNESS WHEREOF the Vendor caused these presents to be signed in triplicate and approved by David Narkewicz its Mayor and the said Owner has caused these presents to be signed in quadruplicate and its official seal to be hereto affixed by its officer or agent thereunto duly authorized (by the attached corporate resolution). This instrument shall take effect as a sealed instrument. ET & L Corp (Vendor): _______________________________________it's AUTHORIZED SIGNATURE ___________________________DATE________________ TITLE CITY OF NORTHAMPTON (Owner) ______________________Date ____________ Wayne Feiden, FAICP, Director of Planning & Sustainability _______________________Date ___________ Joyce Karpinski, City Auditor, approved as to appropriation. _______________________Date_____________ Joe Cook, Chief Procurement Officer, as to MGL c. 30B compliance _______________________Date ____________ Mayor David Narkewicz $11,025.31XXXXXX Rocky Hill Bike Trail E.T.& L. Corp. Northampton, MA Stow, MA Contract No. 13-20 E.T. & L. Corp. Project No. 19-03 EXTRA WORK - STORM CHAMBERS - REV 2 MAN-HOUR SUMMARY LABOR LABOR FOREMAN 12 HR $35.95 $431.40 12 $431.40 LABORER 24 HR $31.50 $756.00 24 $756.00 LOCAL 98 OPERATOR 24 HR $35.05 $841.20 24 $841.20 EQUIPMENT CAT 330 EXCAVATOR 12 HR $126.97 $1,523.64 CAT IT28 LOADER 12 HR $48.06 $576.72 TRIAXLE - RENTAL 12 HR $95.00 $1,140.00 DOUBLE DRUM WALK BEHIND COMPACTOR 12 HR $18.79 $225.48 LABOR FOREMAN'S PICK UP TRUCK 12 HR $24.23 $290.76 MATERIALS 360X15 NONWOVEN FABRIC 8 OZ 120 SY $1.00 $120.00 4" PERFORATED CORRUGATED PLASTIC PIPE 60 LF $1.05 $63.00 6" PVC PIPE 40 LF $2.30 $92.00 6" PVC 90 DEGREE BEND 3 EA $20.25 $60.75 6" PVC POP UP DRAIN 3 EA $23.05 $69.15 2"-4" CRUSHED STONE 10 TN $15.84 $158.40 1"-2" CRUSHED STONE 30 TN $15.84 $475.20 CULTEC CONTRACTOR 100RHD STORM UNITS 3 EA $138.50 $415.50 TOTAL HOURS TOTAL LABOR AND EQUIPMENT $7,239.20 12 24 24 $2,028.60 LABOR FRINGES AND BENEFITS LABOR FOREMAN 12 HR $23.37 $280.44 LABORER 24 HR $21.83 $523.92 OPERATOR 24 HR $29.80 $715.20 $1,519.56 PAYROLL TAXES AND INSURANCE 36.16% OF DIRECT LABOR COST $2,028.60 0.3616 $733.54 SUBTOTAL $9,492.30 15% PROFIT $1,423.85 SUBTOTAL $10,916.15 1% BOND PREMIUM 109.16 TOTAL COST OF WORK $11,025.31 LABOR FOREMAN LABORER OPERATOR TOTALDESCRIPTIONQUANTITYUNITUNIT PRICE TOTAL 8/15/2019 Extra Work #1- Storm Chambers Rev 2 Page 1