Loading...
9 Birch Laner w 0 E�aaaaa n n2 v 'Up •6YR4yi'l; "• g �R9 6hg`d r �d _ AZA 2 t� �'•n � � o yy Me: r w 0 i I j I r �d _ 2 t� �'•n � � o a r a al H i m � nu.n �SrO: b �� 4•'r c V i I lr+ I M1Tb q � o r w 0 i I j I �I o a r a al H i C` nu.n `;I }'V c V i I lr+ I � I M1Tb q 6 iI 1I l �• E A. I �I o �1111 a C` nu.n `;I }'V c lr+ Fn9 M1Tb q ----------, -------------- SCHEDULE 940 PVC 4" DIA. TITLE V �SFST+ — TANK 1500 GAL ROTONDO -9T--1500 OR EQUAL SITLE6V GALLEY ROTONOO G 444 MODIFIETITLE VD TO 21f HGT. SECT.12 INSPECTION I ENO1NCG+t n..y - SECT.2.8 -•--- -- CONTRACTOR 48 NRS. BEFORE CONSTRUC- TION IS TO BEGIN. FILL FILL VOLUME' IS APPROX. Z,SO CU.YDS• SECT82_ TO CONFORM TO SECT.2.17 IN ITS IFICATION THAT }1LL TOPSOIL AND IMPERVIOUS MATERIAL BELOW WITHIN 10' OR 25' OF TSB LEACHING FACILITY MUST BE REMOVED. IFICATION THIN ALL TREES,BRUSH, AND STUMPS WITHIN THE FILL TO BE PT -MOVED - SEPTIC TANK DESIGN •• .. ": "' 11 * O GAL DAILY FLOW SEPTIC TANK SIZE .. "' /.5'00 loll„ PERCOLATION RATE FROM TEST • • • 2MiN/INCH LEACHING GALLERIES OR CHAMBERS WIDTH OF CONCRETE BOX FEET BOX FEET '.:: S2 LENGTH OF CONCRETE " ' DEPTH OF WATER FEET STONE ALL AROUND FT Z THICK OF GARAAGE'GRINDER USED "' 328 TOTAL BOTTOM AREA SQ FT ••••• " /Q6 TOTAL SIDE AREA SO FT ••••• • • ' ' • ' 27Z TOTAL GALLONS TO BOTTOM • " " 1 z TOTAL GALLONS TO SIDE • :::: TOTAL GALLONS SUPPLIED TITTLE 5 •••••• b&D TOTAL GALLONS PER o FT D TOTAL GOT & REA SFEET •'• 2 DEPTH OF WATER INABOX A/07-5: NO 5V6DR,4/AIS WITHIN '/00 OF LEACHING G/gLGEr- A Z L WORK TO BE DONE //J ACCORDANCE WITH TITLE.Y SAV)T.4k1sEweR, MAr 20, /977. I -- I'_ jib -m 7777�ii I -- I'_ jib 7777�ii i 9 r klfl E�, lII „m iPn z n z nl fAFi �j C s c I -- I'_ 7777�ii i � - a z n z nl fAFi �j C s c N :e y��p paw �hr�6 fr'�� a N aa� g! lnl C� A y E a 2 , Alir b O don I -- I'_ a I 4+' L-' PRESSURE DOSING LEACH BED (RAISED) DETAIL X—SECTION (NOT TO SCALE) 34- 61a• aa• D•O ad• _ �. o..wwlwo.na orona•..cwlrnL rm,..a�+o•r .'P`"•...a,.io........r..a..�rrw.�r.r.o-wr.A I r.au muaLco- nru.orummmnwrtm.v.u,n n�.ms I 1j I I ) ,w ) RE -PLUMP INTERIOR D TO COMMON BUILDING ABANDON EXISTING SEP77C TANK REMOVE COVER PUMP OUT CONTENTS FILL W/ CONTROL DENSITY FILL IFLOWARLE FILL) woww I,9+ z TYPICAL PUMP CHAMBER DETAIL (NOT TO SCALE)�DpJVF nfP [@HYOiLE°r.L.Pn 31r .[W:[ w'1�: CB CP `\ - LO[.11GN PCP LY•LP) Cr. `L 9 ILER FIFO Tom? _ { r 7' IAN _ SL -R1 LLT+-+_ .ILH .-TrR _,�P. S•II }rx LL. Ci+_ _. 1 + C7.. .EEP -CLE'• B AIN PUR DISC. CVE.:v E + ':L 10 9L0:✓ c WI CS I P, P SN�.LL BE iIQ.-CLO. SCvI.CE I"E. 1 -I -e' SO.:A..;il;, . I:::r Qr Y. HP 2ih. I - ,0, P RVIn MBRE4 UW"3 CILA(E EQUIP. 413-773-3683, QI EROeL 2 CCWRCLLER�d - SM -'_L '.I LLJCE " CIF. ;It PVI° -7. -R[. -- -�I' !iS`I. %i' D. Sw11C-- r0. S'w1'C- C_ -r SEC --E ; - ':IEE 3 .LL ELCC1 Z[31.WF S-«__ S- It uC=.r.. >E-'_C:'CR wC E,. "C [-- cm.Du11 • nL:A. SI. -LL DC °O.t— 3' S[ --IC CI+CLII Tv^' Pr - i PRESSURE DOSING SYSTEM PROFILE (NOT TO SCALE) 2.000 GALLON D I TAN SBM-. Im 7W IN OP ' 2.000 GALLON SEP71 CTs WJ OUTL Er FX TER &.RISI TO GRADE OVER INET:)'& r—saP�rsara,NN OOSINO CHAMBER PRESSURE DOSING LEACH BED (RAISED) 1 (SEE ml6ritfglE91 MMl foal G•LLORS ESF.E aEtAai "� ` rovFx6oReA"'w�'uP3 rsFFAP-•�U Fu'rrse�DCAeoEnlaN. LL WALL ALwNlrnu�N J.T WALL Alrt°ALaF.n1 lL+VE!a•L seoP£roas Fr,Fr 9UTLE1'BLY£�� OWEfl APE � ra5'uT£ 3 J .y 6, 6• MIN.INV. ELEV. = 01.8 5 - _orrnFr ELEV. -07.9 'L rNET FLIER DIF�iF 1'D4M'TCVA—' / �� `j ELEV .1. NOTES: I. INV. AT LEACHING BED IS BASED ON SOIL EVALUATION" MAX NIGH GROUNDWATER ELEVATION 2 CONTRACTOR SMALL CONFIRM LOCATION & ELEVA nOI#QF BUILDING SEWE.RATCONNECTION POINT PRIOR TO SETTING SEPTIC TANK&PUMP a"SER DEEP OBS. HOLE NO. 1 (TP -1 DEPTH HORIT- TCIf7U9C COLOR U07LES OTHER .r � . Tau xpleaAEUIm Loon wAuwv 1 -r s. � wpm I i o°vII'mj Laos aawLUP — I e I c r Low+aN,a I Lmw � rnwea LaaaE rwux.w.. p."r GS 10WYLN0 rLMM LmnE. fAM116Y I Irs+ra7 , rorAx eooaE awruw `r1iAl10' .rm r IBEDI OCf > 11$" KILL o 6 _ NE:.R _ _ _ _ _ _ G PCPs: NOTES: F T. CONTRACTOR SHALL PROTECTEXISTINa TREES & SH2VP5 ALL DEEP-ROOTED TREES & SHRUBS KTFHIN 20 -FT 01 CEAC 2. CONTRACTOR SHALL LOAM d SEED ALL DISTURBED JIZAS MULCH UNTIL GRASSES ARE WELL ESTABLISHED TO. -FY! O. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO ITIIART 1. CONTRACTOR SHALL CONFIRM LOCA7701Y6 Ef.EVATIp.lpa L PRIOR TO SETTING SEPTIC TANK & PUMP CHAMBFR i DEEP GBS. HOLE NO. 2 '(TP -2) DCPTH HORIZ-7EyTYT E COLOR MOTTLES 07NER r � ------------ 4N°rLaw I1oI°+o I nvre oe � LaosE oruww ar i e. 1 .mow. �'w.•eossenrm LmsreL•r[nwI ' v cr sun Irs+ra7 , rorAx eooaE awruw `r1iAl10' .rm r [alvr4ro LoosL aunuw+ I BED OCK > 104" ELEV. AT GRADE (RELATIVE SITE B.rd.): 92T ELEV, AT GRADE (RELATIVE SITE OEM.): IMLs OBSERVED DEPTH 70 GROUNDWATER: NONE oBsFRVEB OBSERVED DEPTH TO GROUNDWATER; NONE 095ERVO ESTIMATED SEASONAL HIGH GROUNDWATER DEPTH: 6RwrsEs ESTIMATED SEASONAL HIGH GROUNDWATER DEPTH: -INCHES C a bf fi NOTES: SI resrxo r n.a MaIr4P4.grR„,� D' a,anelE9Dy�. eeaL�.RP 91An � ,roN.r.�n,. I A/ J iI 131 1 4 1 Z 4' Du CONNECTION TO BUILDING SEWER {SCHJOPVCJ �I �.,4� : TANK VSER T d oITTLET asKD ism[ 2" ODL DELIVERY PIPELINE 3' DIA. MANIFOLD (SEE DETAILS) (PRESSURE SEWED PERCTESTNO, 1 —98 — EXISTING CONTOURS ] 1 PROPOSED CONTOUR 0 APPROX. LOCATION OF WELL 717101 1UBS IN YARD r0 THE EXTENT FEASIBLE LEACHING FAC14MES SHALL BE REMOVED. RFAS. SEEDED AREAS SHALL BE MAINTAINED WIN'REVERT SOIL EROSION. ;TAR7ING WORK ON SEP77C SYSTEM. _ N OF BUILDING SEWER AT CONNECTION POINT 0 EAGHP7ELD � ( O 1' J 'foflWl m /NF BELONGING TO HELEN GLEASON 9 BIRCH LANE $ PROPOSED uEAR1NdLOCATION PLAN APPROX. SCALE: 1" = 200' D)AOPER FOR.INVERT ryN"HOLES) SFT O.C. LATERALS (NYP) AT 5 -FT O. C. W1 P ABED BY NEWMAN ENVIRONMENTAL ENCIN. JULY 2001. BA5FD ON SITE TOPO. SURVEY; OR STAGGERED AS SHOWN 'FNATPLAN OF LOT 019A'DRAWN BYAT GLEASON, HAMP. CO. REGISTRY OF DEW- SSK-13S PG -47, MASSGrS ORTHOPHOTO 0110513114.112 -METER RESOLUTION REPLACE EXISTING SOILS TO ELEV.-MY - WICLEAN SAND FILL TOEXTENTS S7MWN {GENERAL NOTES AREA - 60'r 32' 1-- MAINT.VN BREAKOUT ELEV.•92T' MORE THAN T$ FT FROM LEACH FIELD DOWN GRADIENT SLOPES SHALL NAVE A GRADE OF 3 HOR11_: 1 VERY., OR FLATTER 1,500 GALLON PUMP CHAMBER W/ 4' CONN FROM SEPTIC TANK (SEE DETAIL$) SITE PLAN SCALE: V =30' ❑ TP -1 DEEP iOBS.HOLE (TEST PIT) NO. 1 O PT -1 PERCTESTNO, 1 —98 — EXISTING CONTOURS _95— PROPOSED CONTOUR 0 APPROX. LOCATION OF WELL 717101 ROCK -WALL - - -- - APPROX. LOCATION OF PROP. LINE - — `-' STREAM(WETLANDS BOUNDARY DESIGN CALCULATIONS: OESIGNFLOWRAM, 110GPDX8aDRM=660GPD—EXISTINGFACILTTYREPAIR! NOT DESIGNED TO ACCOMMODATE GARBAGE DISPOSAL •B(ISTINIG GARBAGE DISPOSAL TO BE T DESIGNPERCRATE =4MPI; THUS, EFFLUENT LOADING RATE IS 0,60GPD/SF (CLASSIISCILS) LEACHINGFIELD: LEACHING AREA REQUIRED; 6WOPT4O50GPOISE)=T,10OSF USE LEACH FIELD: 50' LONG BY 27 WQDE, 6.5'DEEP LEACHING AREA. 50'x27=1,100SF —OK RESERVEARCA NOTPROVIDED—OOSTINCFACILrrYREPAIR ESTIM. SEASONAL HIGH WATER TABLE (FSHWU = 07.3' NEAR M I SET BOTTOM OF LEACH FIELD (STONE) AT ELEV. = 91-T EXCAVATE p(ISTIVG SOLS TO ELEV. - 09.3' SEPTIC TANK NEW 2.000 GALLON SEPTIC TAN)( PROVIDES a N DAYS RETENTION 77ME AT DESIGNFLOW DOSINGSYSTEM: MON. 1.500 GALLON TANK EMERGENCY =950 GAL;W'ORIONG VOL =790GAL; MISCELL=J50 GAL PUMP. DISCH, • 44 GPM AT 28+7 TDR; CYCLE TIME - 290 GAU44 GPM - B & MINUTES —O.K PIPING. DELIVERY - 20' DIA.; MANIFOLD - 3* DA.; LATERALS =1.25' DwL SPADING: LA TERALS PLACED 64-7 0 C.., PERFOR IN LATERALS AT 54-70 C. ANTlfLOrAr10N: 1,50) GALLON TANK= f 0.S'x 5.67`15 3Yx SZ4 LSSICF =19,WO LBS BUOYANCY fSURCH.) TANK= fZODO LDS, ADD CONCR. PAD: 10 5' X 6 X V x 125 LBSfCF - 7,900 LBS; SVM=19,900 LBS- O K ESHWT MAYEXCEEO TOP OF TANK- I -FT THICKANTW1,07ATION CONCR PAD IS REQUIRED. BREAKOUT GST.=T5';BREAKOUTELEV. • 921'- PROVIDEADDI.RLLAS SNOWN 6 SW/ALE$ r0 DIYERTRUNOFF I. MAINTAIN A MINIMUM 100 FT. SETBACK BETWEEN WELLS AND LEACHING AREA; MAINTAIN A MINIMUM SOFT SETBACK BETWEEN WELLS AND SEPTIC TANK 2 THE 1EACHWO AREA SHALL BE MORE THAN 20 -FF FROM THE FOUNDATION. SEPTIC TANK SHALL BE MORE THAN 10 -PT FROM THE FOUNOAT7O.N. 3 MIN SLOPE OF BUILI7)NC SEWER SHALL BE 115' PER FT, WD AT CONTINUOUS G174bE I PROPERTYLINFSAS SHOWN ARE ONLY ESTIMATES. FIELD VERIFY DISTANCE TO PROPERTYLfNES PRIOR TO CCIVSTRUC7ION d OBEYALL LOCAL ZONING QROMWYCES. 5 SYSTEMNOT DESIGNED TOACCPMMODATE GARBAGE OMPOSAL 4 AVORI ORWMI OVER LEACHING AREA, EXCEPT FOR SITE cut4miLT. .1 - t,ONSTRUCTION NOTES I. SYSTEM COMPONENTS: SOIL ABSORP. SYSTEM = RAISED BED wrPRESSURE DOSING LEACH FIELD: 50' LOAC, 22' WIDE 6 0.5' DEPTH BELOW PIPE; LATERALS 1,25' DLL SCHED. 40 PVC WJ 11PPERF. @ 6+7 QC. MANIFOLD; 3'DOL SCHE0.40 PVC, RATE 150 PSL MIN DELIVERY POPE: Z'OU. SCHED.40 PVC, R4TE0 150 P5) MIN ONE PUMP DOSING SYSTEM (SEE DETAILS) -PUMP c MVERS WHRH5 ONE f,5W GALLON PUMP CHAMAER ONE 2,000 GALLON SEPTIC TANK GRAVITY FLOW PIPING: 4'DIA SCH. 40 PVC, MIN. S=1/9"PER Fr PRESSURE FITTfNGS SCH.40 PVC OR BRASS, RATED 150 PSI MIN SEPTIC TANK OUTLET FILTER. ZABEL Ad SOJA. OR EQUAL 2 SEPTIC TANK 6 PUMP CHAMBER SHALL BE WATERTIGHT SET LEVEL ON BASE CONSISTING OF NATIVE GROUND W/ A MIN 01NCH STONE BASE fGF 314 'STONE), EQUfPPED WITH A 20' DIA WATERTOGHTMANHOLE d ACCESS PORTS TO WSPECTINLET 9 DO= PIPES; RECTANGULAR W/A MIN WIDTH TO LENGTH RATIO OF 1 TO f.5 d MIN 4 -FT LIQUID DEPTH BELOW OUTLET,; DESIGNED FOR HEAVY OVTYLOADING; 6 MEETING THE REQUIREMENTS OF 31(1 CMR 15225. INLET d OUTLET TEES SHALL BE SCHEO 40 PVC OR PRECAST CONC. EXTENDING 6 -ABOVE FLOW UNE, W1A MIN. AIRSPACE OF 3' BELOW TANK COVER. OUTLET TEE SHALL EXTEND A MIN. 14, 19, OR 24 INCHES BELOWFLOW UNE FOR TANKS W/UOUID LEVELS OF 4, 5, G 5 FT, RESP. .,ALL CONSTRUCTION SHALL BE W ACCORDANCE W/ TITLE 5, MASS, STATE ENVIR CODE -1 SEWAGE DISPOSAL SYSTEM REPAIR AT 9 BIRCH LANE, NORTHAMPTON, MA FOR HELEN GLEASON FIELD: 713101 GJN/MSN OWNER: ORWC: 7!7/01 GJN HELEN GLEASON Uo NORM JACOUES CALC: 717101 GJN JACQUES REAL ESTATE 384 MAIN STREET CHWD: 717101 GJN EASTHAMPTON, MA 01027 REY: TEL: 413-527-3333 DWG. NO. Z0f07-1 SHEET: 1 OF 1 EWMAN EIWIRGNMENTAL ENGINEERING 0. BOX 396. 21 GUARD ROAD, WORTHINGTON, TLA 01095 :L: 413-238-5383 FAX; 413-238-4276 T' 4 1 3 1 2 I 1 em I"��nhoy MN�� ✓!fin N s W D 0 � I O r I f 1Cj1 gIV W I ' rrl I I r I 4 'rl s er II r i I I I c 1 u fit I1 I I f r 7 r m r f I 1 II I I Y r I l - I I I I 1 li I I N I I n E I IDR! EWAIV r G I I 1 11 V II II 1 l� v I II i I I n I I V 1 I I Y 1 I I sg-E II I I I II Y I� Y I w 1 14 lw li l 1 I ! 1 I 1 Z5 I � N O I i 0 b FN I � >o 'r hE•� o �' I a u c� P r bg F ePo a }. `` o SPECIFICAT 0f:+ �. tlW,rw SamM —x,45 PSI. o b U.r� ... �idm-s.n.e "Im.uw.nmam a.wlw.m '%�,' g ITEM SPECIFICATIO21 REFERENCE plPg EDULE tl40 PVC A" DIA, TITLE V 1 PERCOLATION RATE FROM TEST - 1500 GAL ROTONDO ST 1500 OR EOUTITLE V SEPTIC TANK WIDTH OF CONCRETE BOX FEET -••• LENGTH OF CONCRETE BOX FEET '••" SE GALLEY ROTONDO G 444 MODSFIEO TO AGT. THICK OF STONE ALL AROUND FT -.-. LEACH GARBAGE GRINDER USED SECTEI2 INSPECTION - ENGINEER SHALL BE NOTIPIED HY TITLE V SECT.2.8 /Q�p CONTRACTOR 48 HRS. BEFORE CONSTRUC- ;?7? - ]zTOTAL TOTAL GALLONS TO SIDE•••••• TION IS TO BEGIN. TOTAL GALLONS SUPPLIED -•-•• FILL FILL VOLUME IS APPROX. 250 GO.YDB. TZTLE V SECT.2^1T TOTAL BUT & BIDE AREA SO FT •-- TO CONFORI4 TO SECT.2.1 IN ITS DEPTH OF WATER IN BOX FEET ••• Z ENTIRETY. SPECIFICATION C THAT ALL TOPSOIL AND IMPERVIOUS MATERIAL BELOW AND WITHIN 10' OR 25' OF THE LEACHING PACILITY, MUST BE REMOVED. SPECIFICATION THAT ALL TRE^S.BRUSH, AND STUMPS WITHIN THE FILL AREA TO BE REMOVED. SEPTIC TANK DESIGN ....'..... .4qO GAL DAILY FLOW. SEPTIC TANK SIZE '- "' /600 GAL_ PERCOLATION RATE FROM TEST - 2MM.1INaH LEACHING GALLERIES OR CHAMBERS WIDTH OF CONCRETE BOX FEET -••• LENGTH OF CONCRETE BOX FEET '••" 37 DEPTH OF WATER FEET ••'-•••. 2 THICK OF STONE ALL AROUND FT -.-. 2 GARBAGE GRINDER USED _ - TOTAL BOTTOM AREA SO FT -• - -- ••- 3Z$ TOTAL SIDE AREA SO FT •- /Q�p TOTAL GALLONS TO BOTTOM ••-•••• ;?7? - ]zTOTAL TOTAL GALLONS TO SIDE•••••• •• 392 TOTAL GALLONS SUPPLIED -•-•• 6(q TOTAL GALLONSPER TITTLE 5 •••••• 660 TOTAL BUT & BIDE AREA SO FT •-- 1114 DEPTH OF WATER IN BOX FEET ••• Z Wf"Am No SV 8DR,4/NS WITH IN /OO' OF L E/icHING GALL Ey- AL L WORK To BE DaNB //J AccoRQANcE WITH TITLEY SANITARySEWER, MAY .ZGI� /977