Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
266 Audubon Rd
at��5 �60.� PL ]84•$$' — — — I -n I ZE I f T? ©f o �I I rry= r p n if E/ tf ['1 D F r } T Z �60.� PL ]84•$$' — — — I -n I ZE I f T? ©f o �I I rry= a s IL liN GGG g OH g�y3�nn >c En -'Hoi as 6714 �z��ece �q�yqye� �a I IUN b Z �O " j j r if E/ I F 2 } F i > a �i A lb g n r a s IL liN GGG g OH g�y3�nn >c En -'Hoi as 6714 �z��ece �q�yqye� �a I IUN b Z �O " j j 3,5 OAOyp � 11� A r{ e l r if E/ I F 2 > a 3,5 OAOyp � 11� A r{ e l �'� >�p�Q� ^Oa� � �•�� Y r :ii � r�� G Z `tri MM1945.1- M2 C-- IMP :K ��' �g :�1Z�a� ���� � T��i^ 2 y 2nd t 7 :g' app dA � s �111111 li °wwd 6 R a 5;ipj r $�O Sg °St Fns- r sayA 3-+� a styy7I agFs> >� ��}}yttt o aps���g a� oI'�� s NOTES: FIRST 2 FEET OUT OF D BOX TO BE LEVEL. ENDS OF DISTRIBUTION LINES TO BE CAPPED. BOTTOM OF TRENCHES OR BED TO BE LEVEL, ALL STONE MUST BE DOUBLE WASHED. SEWER PIPE FROM HOUSE TO SEPTIC TANK MUST HAVE A SLOPE OF 0.02 AND MUST BE 4 INCA CAST IRON OR SOLID WALL PVC. SCHEDULE 40, PIPE BETWEEN SEPTIC TANK AND DISTRIBUTION BOX IS TO BE 4" SOLID WALL PVC SDR 35 SEPTIC TANK AND DISTRIBUTION BOX MUST BE SET LEVEL AND TRUE TO GRADE ON A STABLE BASE OF STONE 6" THICK WHICH HAS BEEN MECHANICALLY COMPACTED. REBAR STEEL RODS SIB DIAMETER MUST BE DRIVEN INTO THE SOIL AT THE BEGINNING AND END OF EACH DISTRIBUTION LINE, 2 DIAGONAL CORNERS OF THE DISTRIBUTION BOX. THE PURPOSE OF THE REBAR IS TO ASSIST IN LOCATING THE COMPONENTS OF THE SAS IN THE FUTURE. ISM GALLON 2 COMPARTMENT (CONNECTICUT STYLE) SEPTIC TANK MUST HAVE 3 ACCESS MANHOLES WITH A MINIMUM DIAMETER OF 20" AND BE NO MORE THAN 12" BELOW GRADE. ONE MANHOLE OVER INLET BAFFLE, OUTLET BAFFLE THE THIRD MANHOLE MUST BE LOCATED OVER THE CONCRETE DIVIDER BETWEEN THE FIRST COMPARTMENT AND THE SECOND COMPARTMENT. MIIEN THIS COVER IS REMOVED EASY ACCESS TO BOTH COMPARTMENTS MUST BE AVAILABLE FOR PUMPING. LF- ADEQUATE ROOM To INSERT A CONVENTIONAL PUMP ROSE AND FOR VISUAL. INSPECTION NOT USE ANY TANK WITH AN OPENING TOO SMALL TO PERMIX THE HOSE TO BE INSE TED. CHECK Aijil SUPPLIER IF THE TOP OF THE SEPTIC TANK IS MORE THAN 12" BELOW GRADE, CHIMNEYS MUST BE PROVIDED. THE TOP OF ALL SEPTIC SYSTEM COMPONENTS SHALL BE NO MORE THAN 36" BELOW FINISHED GRADE. IF THE TOP OF THE SEPTIC TANK IS MORE THAN 12" BELOW GRADE THE SEPTIC TANK MUST HAVE 3 ACCESS MANHOLES WITH A MINIMUM DIAME'T'ER OF 20" AND BE FLUSH WITH GRADE. ONE MANHOLE OVER EACH BAFFLE AND ONE OVER THE CENTER- INLET ENTERINLET AND OUTLET TEES SHALL BE CAST IRON, SCHEDULE 40 PVC OR CAST IN PLACE CONCRETE AND BE ON THE CENTER LINE OF THE SEPTIC TANK CROSS SECTIONAL FLOW BAFFLES SHALL NOT BE USED AS SUBSTITUTES PER 15.227(1). INLET AND OUTLET TEES MUST BE LOCATED AT CENTER OF TANK, EVEN IF ENTRY IS THROUGH THE SIDE OF THE TANK SEPTIC TANK OUTLET TEE MUST BE EQUIPPED WITH GAS BAFFLE WHICH SHALL BE CONSTRUCTED FROM SCHEDULE 40 PVC 4" DIAMETER PIPE GLUED JOINTS. GAS BAFFLE SHALL BE INSTALLED SO THAT BOTTOM IS 14" BELOW LIQUID LINE FOR A 48" DEEP TANK 19" FOR A 60" DEEP TANK A 90 DEGREE ELBOW IS TO BE GLUED IN PLACE POINTING TOWARD THE CENTER OF THE SEPTIC TANK. A TEE MAY BE SUBSTITUTED ICOR THE ELBOW. DO NOT USE ANY SEPTIC TANK THAT HAS A HOLE IN THE BOTTOM OR IN THE SID$. DISTRIBUTION BOX MUST HAVE A MINIMUM INSIDE DIMENSION OF 12^ WITH A b" SUMP. ALL DISTRIBUTION LINES MI1ST HAVE ADJUSTABLE FLOW LEVELERS TO PROVIDE FOR EQUAL DISTRIBUTION OF LEACHATE A MINIMUM OF 9" OF COVE EXCLUDING TOP SOIL r f US C PL C E D AS BACKFILL OVER THE NL DISTRIBUTION LINES SHALT, BE SCHEDULE 40 IF NO VEHICULAR TRAFFIC IS ANTICIPATED SDR 35 MAY BE USED, ALL SEPTIC TANKS, PUMP CQAMBERS AND DISTRIBUTION BOXES MUST BE WATERTIGHT. A MINIMUM 15' HORIZONTAL .SEPARATION DISTANCE MUST BE PROVIDED DILTWEEN THE TOP OF THE PEA STUN E AND THE ADJACENT DOWNITILL SLOPE. FOR DETAIL REGARDING SLOLPE AND RETURN TO GRADE SEE "CROSS SECTION OF LEACHING TRENCHES (BED)" DETAIL. EXCAVATOR MUST PROVIDE, A SWALE 5 FEET WIDE AROUND SAS TO PREVENT SURFACE WATER RUNOFF FROM DRAINING ON TO NEIGHBORING PROPERTY. IF LEDGE IS ENCOUNTERED HIGHER THAN ANTICIPATED OR HIGHER THAN OBSERVED DURING THE EVALUATION OF DEEP OBSERVATION HOLES (FERC TEST), FILL MUST BE ADDED TO RAISE THE BOTTOM OF THE LEACHING SYSTEM AT LEAST 4 FEET ABOVE THE HIGHEST ELEVATION OF LEDGE FOUND. ANY PART OF THE SEPTIC SYSTEM THAT WILL BE SUBJECT TO VEHICULAR TRAFFIC MUST HAVE AN H 20 WHEEL LOAD RATING. NO WELLS OBSERVED WITHIN 150' OF PROPOSED LEACHING SYSTEM OTHER THAN SHOWN. PROPERTY OWNER IS RESPONSIBLE FOR COMPLIANCE WITH ALL Lr-`CAL ZONING REGULATIONS, CONSERVATION COMMISSION REGULATINGS AND MASSACHUSETTS IVETLA ND PROTECTION ACT.. THE NEW SAS IS T.V THE SAMX GENERAL LOCATION AS THE EXISTING SAS. EXISTING SEPTIC TAN:: MU31' BE REMOVED AND DEBRIS DISPOSED OF IN A MANNER ACCEPTABLE TO THE BOARD 0, gA %J, y IL ALL DEBRIS ENCOLINTykAED "ROM EXISTING SEPTIC SYSTEM MUST BEOISPOSED OF IN A MANNER ACCEPTABLE TO CHE BOARD OF HEALTH. BECAUSE OF SMEARING IN TIIE "C" HORIZON INSTALLATION OF THE LEACHING SYSTEM CANNOT TAKE PLACE DURING THE WET SEASON WHEN THE EXCAVATION CAN BE SMEARED. THE STONE CANNOT TIE PUT INTO THE TRENCHES OR INTO THE BETS UNTIL THE SIDE WALLS AND THE BOTTOM HAVE BFFIN RAKED AND ROUGHENED UP. PROPERTY LINES MUST BE ESi ABLISIIED BY A REGISTERED LAND SURVEYOR IN ORDER TO MAINTAIN PROPER SETBAC L NO DRIVEWAY, PARKING AREA OR OTHER IMPERVIOUS SURFACE SMALL BE LOCATED ABOVE THE LEACHING SYSTEM EXCEPT WHERE UNAVOIDABLE IPI SUCH CASES VENTING MUST BE PRESENT. ANY WORK DONE BY THE PRNPERTY OWNER LESS THAN 100' FROM A WETLAND WILL REQUIRE THAT HE FILE A NOTICE OF INTENT WITH THE LOCAL CONSERVATION COMMISSION. NO SEPTIC SYSTRM ADDITrvSS MAY BE PLACED IN A SEPTIC TANK, NO PART OF A LEACHING SYSTEM MAY BE LOCATED LESS THAN 100 FEET FROM ANY WELL OR EDGE OF A WETLAND OR LESS THAN 10 FEET FROM ANY PROPER'L'Y LINE. PROPERTY OWNER IS RESPONSIBLE FOR FINISH GRADING AND SEEDING. EXCAVATOR IS RESPONSIBLE FOR BACKFILLING AND ROUGH GRADING UNLESS OTHERWISE NEGOTIATED WITH PROPERTY OWNER. THIS SEPTIC SYSTEM DESIGN IS NOT INTENDED TO BE A SITE PLAN. EXCAVATOR MUST CALL DIG SAFE FOR CLEARANCE BEFORE STARTING WORK TEL: 18" 3447233. DO NOT SCALE DRAWING. THE DESIGN ENGINEER MUST INSPECT ALL COMPONENTS OF THE SUBSURFACE ABSORPTION SYSTEM PRIOR TO BACKFILLING. 15.021(3) TEL: 413 467-7228 PLEASE ALLOW 24 - 48 HOURS NOTICE `;-,YAS=D S TONT -i "i i.EAIN STOMA. THE MASSACHUSETTS DEP HAS ESTABLISHED A TEST TO DETERMINE THE CLEANLINESS OF "WASHED STONE" USED IN THE LEACHING SYSTEM. MARK A S GALLON WHITE PLASTIC BUCKET AT THE 1 GALLON HEIGHT AND THE 4 GALLON HEIGHT. PLACE STONE FROM THE PILE OR TRUCK IN THE BUCKET UP TO THE 1 GALLON MARK. MAKE SURE THAT STONE COMES FROM SEVERAL DIFFERENT PLACES IN THE TRUCK OR PILE. FILL THE BUCKET TO THE 4 GALLON MARK WITH CLEAN WATER, AGITATE THE STONE - WATER MIXTURE TO SUSPEND ANY FINE PARTICLES. WAIT 60 SECONDS. AFTER 60 SECONDS IF THE OUTLINES OF THE INDIVIDUAL PIECES OF STONE ARE CLEARLY VISIBLE THE STONE CAN BE ASSUMED TO BE REASONABLY FREE OF FINES. IF THE INDIVIDUAL STONE PIECES CANNOT BE CLEARLY SEEN THE STONE IS PROBABLY TOO "DIRTY" AND SHOULD NOT BE USED IN A TITLE S SOH, ABSORPTION SYSTEM. IF SUCH STONE IS USED THE SYSTEM WILL BE REJECTED.