Loading...
32C-328 (2) 32C- 32- '— oo / Massachusetts Electric Company&Nantucket Electric Company(d/b/a National Grid) M.D.P.U. 1248 Certificate of Completion for Simplified Process Interconnections Installation Information: ❑ Check if owner-installed Interconnecting Customer:Jo Lane Contact Person: Mailing Address:6 Service Center Road City: Northampton State: MA Zip Code:01060 Telephone(Daytime): 413-296-2702 (Evening): Facsimile Number: E-Mail Address: to@jolanders.com Address of Facility(if different from above): Electrical Contractor's Name(if appropriate): Valley Solar Mailing Address: PO BOX 60627 City: Florence State: MA Zip Code: 01062 Telephone(Daytime): 413-584-8844 (Evening): Facsimile Number: E-Mail Address: Info@valleysolar.solar .3 erv,A.A .-4 /Zs1zoz2 License number: Date of approval to install Facility granted by National Grid: 7/27/2021 Application ID number:00370816 Inspection: The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County): Signed(Lo Electri Wiring Inspector, or attach signed electrical inspection): Name(printed): 6ct rn� LU Date: / (fc• ak\ License#: 4/o (,(1,( As a condition of interconnection you are required to send/e-mail a copy of this form along with a copy of the signed electrical permit to National Grid: National Grid Attn: Distributed Generation 40 Sylvan Rd Waltham,MA 02451 E-mail: distributed.generation@a,nationalgrid.com Massachusetts:http://www.nationalgridus.co slectric/home/energyeff/distributed generation.asl Nantucket:http://www.nationalgridus.co ntuckkhome/energyeff/distributed_generation.asp Page 1 of I