Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
36-113 (10)
BP-2021-2340 207 BROOKSIDE CIR COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 36-113-001 CITY OF NORTHAMPTON Permit: Solar Build PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2021-2340 PERMISSIONIS HEREBY GRANTED TO: Project# SOLAR Contractor: License: PIONEER VALLEY Est. Cost: 45900 PHOTOVOLTAICS 111266 Const.Class: Exp.Date:03/14/2023 SERGIY, AMANDA KATHRYN &HEATHER GAIL Use Group: Owner: RICHARD Lot Size (sgSt.) Zoning: WSP Applicant: PIONEER VALLEY PHOTOVOLTAICS Applicant Address Phone: Insurance: 311 WELLS ST - SUITE B (413)772-8788 375928710101 GREENFIELD, MA 01301 ISSUED ON:12/29/2021 TO PERFORM THE FOLLOWING WORK: 36 ROOF MOUNT SOLAR PANELS LG380 POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insul<�tion: Final: Smoke: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: 71/2 t5r`t,PRIV4--• Fees Paid: $75.00 212 Main Street, Phone(413) 587-1240,Fax:(413)587-1272 Office of the Building Commissioner VE OTC2 202/ The Commonwealth of Massachusettis Board of Building Regulations and Stands OR r urr n,;\,rr trrcP Ij'CIPALITY Massachusetts State Building Code, 780 CMIT ;;��,r,ToM1 r, Ecrro,�s USE a o, F--� Building Permit Application To Construct,Repair,Renovate Or DemoTi`stra-� --..BQyised Mar 2011 One-or Two-Family Dwelling This Section_ Official Use Only Building Permit Number:g P-?/» 23 410 Date Applied: ?5,051601\k.,/. T1. Building (Print Print Name) Signature g nature 'T to SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 207 Brookside Cir Northampton MA 01062 3 V // 3 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private❑ Zone: Outside Flood Zone? Municipal 0 On site disposal system 0 Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Heather Richard and Amanda Sergiy Northampton MA 01062 Name(Print) City,State,ZIP 207 Brookside Cir (413)768-7443 heathergrichard@gmail.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition 0 Demolition 0 Accessory Bldg.0 Number of Units Other l l Specify:Solar PV Brief Description of Proposed Work2:(36.0)LG 380 NeON 2 White solar panels on roof,inverter in basement SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) 1.Building $ 1. Building Permit Fee: $75 Indicate how fee is determined: 2.Electrical $ ❑Standard City/Town Application Fee ❑Total Project Cost (Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ 1i Suppression) Total All Fees Check No.)'1 VCheck Amount: / Cash Amount: 6.Total Project Cost: $45900 0 Paid in Full 0 Outstanding Balance Due: SQUq 4 R� alFANdi PV Squared Solar I www.pvsquared coop 214411:7," Phone:413-772-8788 I Fax:413-772-8668 311 Wells St.,Ste. B I Greenfield,MA 01301 S�,Ai Sp�P MA Elec. Lic.A13764 I MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Maya Fulford Installation Manager SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-111266 03/14/2023 Daniel Gomez-Gonzalez License Number Expiration Date Name of CSL Holder List CSL Type(see below) U 43 Hatfield Street No.and Street Type Description _ Unrestricted(Buildings up to 35,000 cu.ft.) Northampton MA 01060 _ R Restricted l&2 Family Dwelling City/Town,State,ZIP M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 413-772-8788 BUILDINGPERMITS@PVSQUARED.000P I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 140077 9/15/2021 PIONEER VALLEY PHOTOVOLTAICS COOP HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 311 WELLS STREET BUILDINGPERMITS@PVSOUARED.000P No.and Street Email address GREENFIELD MA 01301 413-772-8788 City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes El No 0 SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Pioneer Valley Photovoltaics Coopertive to act on my behalf,in all matters relative to work authorized by this building permit application. SEE ATTACHMENT (A) SEE ATTACHMENT(A) Print Owner's Name(Electronic Signature) Date SECTION 7b: OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. 1/5/2021 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" Conirnonwealth 0t Massachusetts Division of Professional l icensure Board of Building Regulations and Standards Cionstr-uCt'6111 t' rvisor C S-1 11266 4 Eocspires: O3114i2023 40 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET r' NORTHAM PTO_N MA 01060 :i Commissioner La °. cm . Office of Consumer Affairs and Business Regulation 1000 Washington Street - Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration Type Supplement Card RegistralWn 140077 PIONEER VALLEY PHOTOVOLTAICS COCrPCRATtlrr INC. Esoirntron• 09/15r2023 D/BIA PV SQUARED SOLAR 311 WELLS ST SU11E 1 _ GREENFIFI n,MA 01301 Update Address and Return Card. !A Al Q ''AAA V..1/ /cn,(GusCerskan taa A+Inry4,U t ka).►RujarLQW n NOME IMPROVLML NT CONTRACTOR Registration valid for ind,vidual use only TYPE:Supplement Cold before the expiration date. If found return to: Registrylen Ettplr tlon Office of Consumer Affairs illness Regulation 140077 09/16/2023 1000 Washington Street ulte 71 PIONEER VA1-LEY PHOTOVOI TAICS COOPERATIVE.IN: Boston MA 02118 11 BlA PV SQUARED SOI AR Viiet MAYA FULFORD • 311 WELLS S1 SU1TE B f�(.wrfll GREENFIELD,MA 01301 Undersecretary •ot valid without signature AC o® CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD YYYV) ili.......--i 12/22/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Kathy Parker NAME: Webber&Grinnell PHONE (413)586-0111 FAX (413)586-6481 (A/C,No,Est): (A/C,No): 8 North King Street E-MAIL kparker@webberandgrinnell.corn ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURERA: Ohio Casualty/Liberty 24074 INSURED INSURER B. Ohio Security/Liberty 24082 Pioneer Valley PhotoVoltaics Cooperative,Inc. INSURER C: Continental Indemnity/AUW Attn:Kim Pinkham INSURER D: 311 Wells Street,Suite B INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: CL20122214681 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTRINSR DDL-SUBR POLICY EFF POLICY EXP IA SD WVD (MM DD/YYYY) (MM/DD/YYYY) LIMITS TYPE OF INSURANCE POLICY NUMBER X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE RED CLAIMS-MADE X OCCUR PREMISESO(Ea occurrence) $ 300,000 MED EXP(Any one person) $ 15,000 A BKS57072282 01/01/2021 01/01/2022 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: _GENERAL AGGREGATE $ 2,000,000 POLICY PRO 2,000,000 JECT LOC PRODUCTS-COMP/OP AGG $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) ANY AUTO BODILY INJURY(Per person) $ B OWNED N/ SCHEDULED BAS57072282 01/01/2021 01/01/2022 BODILY INJURY(Per accident) $ AUTOS ONLY /� AUTOS X HIRED N/ NON-OWNED PROPERTY DAMAGE $ _ AUTOS ONLY /� AUTOS ONLY (Per accident) Underinsured motorist $ 300,000 UMBRELLA LIAB vV"'�"'V� 5,000,000 X _ OCCUR EACH OCCURRENCE $ A EXCESS LIAB CLAIMS-MADE US057072282 01/01/2021 01/01/2022 AGGREGATE $ 5,000,000 DED X RETENTION $ 10,000 $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY STATUTE ER YIN 1 000 000 C ANY PROPRIETOR/PARTNER/EXECUTIVE N NIA 375928710101 01/01/2021 01/01/2022 E.L.EACH ACCIDENT $ , , OFFICER/MEMBER EXCLUDED? (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ Business Pers Property $1,820,700 Commercial Property A B KS 57072282 01/01/2021 01/01/2022 Installation $25,000 Transportation $75,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) Worker's compensation includes MA and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Proof of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE 1.1.4,,--D ,--y, 1 Ao , , ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts ► 1 Department of Industrial Accidents = ,e[= 1 Congress Street, Suite 100 —'0l_ Boston,MA 02114-2017 www.mass.gov/dia iss Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WiTH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/organization/individual): Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): 1.0 I am a employer with 48 employees(full and/or part-time).' 7. El New construction 2.1=1 I am a sole proprietor or partnership and have no employees working for me in 8. El Remodeling any capacity.[No workers'comp.insurance required.] 3.0 I am a homeowner doing all work myself.[No workers'comp.insurance required.]f 9. El Demolition 4.0 I am a homeowner and will be hiring contractors to conduct all work on my property. i will 10 ❑Building addition ensure that all contractors either have workers'compensation insurance or arc sole 11.0 Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.0 I am a general contractor and I have hired the sub-contractors listed on the attached sheet. ]3.❑Roof repairs These sub-contractors have employees and have workers'comp.insurance.: 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.E Other Solar PV 152,§1(4),and we have no employees.[No workers'comp.insurance required.] "Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Continental Indemnity/AUW Policy#or Self-ins. Lic.#:37-592871-01-01 Expiration Date:01/01/2022 Job Site Address:207 Brookside Cir City/State/Zip:Northampton MA 01062 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cer r t e,ai s 'nd penalties of perjury that the information provided above is true and correct. Si natu /�"' :�:OP12/8/2021 .�� �� Date: Phone#:413-7 -8748 or mow Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: • -. LG N br2 ' • 0 LG380N1 C-A6 . ` • •380W The LG NeON°2 is LG's best selling solar module and one of the 1____ most powerful and versatile modules on the market today.The cells - - - are designed to appear all-black at a distance,and the performance - - - - _ warranty guarantees 90.6%of labeled power output at 25 years. - - _ s •.. . 25 . . , YEAR �*** SA' . .,, . . . . . • mm w�arMM1b I n . rv000CT•PERFORMANCE•LABOR WARRANTY . • Features Enhanced Performance Warranty 25-Year Limited Product Warranty 25 z LG NeON°2 has an enhanced The NeON°2 is covered by a 25-year limited performance warranty.After 25 - product warranty.In addition,up to$450 of years,LG NeON°2 is guaranteed at labor costs will be covered in the rare case that least 90.6%of initial performance. a module needs to be repaired or replaced. Solid Performance on Hot Days + Roof Aesthetics • "•` LG NeON°2 performs well on hot days LG NeON°2 has been designed with due to its low temperature coefficient. aesthetics in mind using thinner wires that appear all black at a distance. When you go solar, ask for the brand you can trust: LG Solar About LG Electronics USA, nc. • ® �� LG Electronics is a global-leader in electronic.products in the clean energy markets by offering solar PV panels and energy storage systems.The company first embarked on a solar energy source research program in 1985,supported by LG Group's vast experience in the semi-conductor,LCD,chemistry and materials industries.In 2010,LG Solar successfully released its first MonoX°series to the market,which is now available in 32 countries.The NeON*(previous MonoX°NeON),NeON.2,NeON"2 BiFacial won the"Intersolar Life s Good AWARD"in 2013,201S and 2016,which demonstrates LG's leadership and innovation in the solar industry. • LG NeON®2 . USA , LG380N1 C-A6 • General Data Electrical Properties(STC*) Cell Properties(Material/Type) Monocrystalline/N-type Model - 1G3BON14A6 ' Cell Maker " _ LG Maximum Power(Pmax) - (W] 380 Cell Configuration - - ' ' . . 60 Cells(6 x 10) MPP Voltage(Vmpp) . ' [V] 35.7 Module Dimensions(L x W x H) . .. ' ' 1,740mm x 1,042mm x 40mm MPP Current(Impp) - [A]- 10.65 Weight -- 186 kg - - - -=--------.. ------- open Circuit Voltage(Voc,t 5%) [V] 41.9 Glass(Material) _. . :. Tempered Glass with AR Coating_--__,___-.. Short Circuit Current(Ist,t 5%) [A] 11.39 Backsheet(Color) - • . .. White - - __------________--•...-_----- . White Module Efficiency [%]. 21.0 Frame(Material) - Anodized Aluminium • Bifaciality Coefficient of Power [%] 10 Junction Box(Protection Degree) IP 68 with 3 --- - ---- ---....-Bypass Diodes Power Tolerance [%] 0-+3 Cables(Length) 1,100mm x 2EA °STC(Standard Test Condition):Irradiance 1000 W/m',cell temperature 25•C,AM 1.5 Connector(Type/Maker) - - MC 4/MC Operating Conditions Certifications and Warranty Operating Temperature [°C] -40-+85 IEC 61215-1/-1-1/2:2016,IEC 61730-1/2:2016, Maximum System Voltage (V] 1,000 UL 61730.1:2017,UL 61730-2;2017 Maximum Series Fuse Rating [A] 20 Certifications' ISO 9001,ISO 14001,ISO 50001 ---- --- • - - - - ------ Mechanical Test Load'(Front) [Pa/PA 5,400 OHSAS 18001 - ---- - Mechanical TestLoad'(Rer) [Pa/psf] 4,000 Salt Mist Corrosion Test __ ___ v IEC 61701:2012 Severity 6 °Based on IEC 61215-2:2016(Test Load-Design Load x Safety Factor(1.5)) Ammonia Corrosion Test IEC 62716:2013 Mechanical Test Loads 6,000Pa/5,400Pa based on IEC 61215:2005 Module Fire Performance Type 1(UL 61730) , . - Fire Rating Class C(UL 790,ULC/ORD C 1703). Pacltaging Configuration Solar Module Product Warranty 25 Year Limited -Number of Modules per Pallet [EA] 25 Solar Module Output Warranty - Linear Warranty --- ---- -- - -_--__ -_--- -_-- -- Number of Modules per 40'Container [EA] 650 •Improved:1"year 98 5%,from 2-24th year 0.33%/year down,90.6%at year 2S --- Number of Modules per 53'Container: [EA] 850 Temperature Characteristics Packaging Box Dimensions(Lx W x H)_ [mm] I 1,790 x 1,120 x 1,213 Packaging Box Dimensions(L x W x H) (in] 70.5 x 44.1 x 47.8 NMOT. [•C] 42 t 3 -- --- _ _ -. _. Packaging Box Gross Weight [kg] I 500 Pmax [%PC] -0.34 -- -- - _ _ • Packaging Box Gross Weight [lb] 1,102 Voc '[%PC] -0.26 Isc (%1°C] 0.03 •NMOT(Nominal Module Operating Temperature):Irradiance 800 W/m',Ambient temperature 20°C, Dimensions(mm/inch) Wind speed 1 m/s,Spectrum AM 1.5 10420/41.0(Size of Short Side) a. Electrical Properties(NMOT) 1002.0/39.4(Distance between Grounding 8 Mounting Holes) Model - - LG380N1C-A6 40.0/1.57 Maximum Power(Pmax) 750/6.9 [WJ 285 141-111.r -0.-i MPP Voltage(Vmpp) . . [V] 33.5 -. ------ 16.e.ox3.o/o3xo.t I A - Drain Holt: MPP Current(Impp) - •[A]. 8.49 -_.. 8-04.3/0.2 (-) (.) -' Grounding Holes Junction Box Open Circuit Voltage(Voc) - [V]- 39.4 8-8.5a 12.0/03 x0.5 Short Circuit Current Du) . - [A] 9.16 Mounting Holes I-V Curves 1100/43.3 Cable Length is 'A 120 1000W 2 I 1 16.0 400W 8 4.0- 200W • .14 ni 7,i !.,'i :', 0.0 25.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 c • 0 • Verge[V] ♦ - • LG Electronics USA,Inc. Product specifications are subject to change without notice ® LG Solar000 Business Division LG380N1 C-A6 AUS.pdf 2000 Business Drive l$380 Lincolnshire,IL 60069 Life's Good www.lg-solarcom 65 2021 LG Electronics USA,Inc.All rights reserved. New England Construction Engineering, PLC 436 Campbell Street (NECE) Structural Construction Solutions White River Junction, VT 05001 Jonathan Rugg, P.E. 603-903-9798 j.rugg@NewEnglandConstructionEngineering.com November 10, 2021 Ms. Simone Audette Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street, Suite B Greenfield, MA 01301 Re: Richard Residence, Northampton, MA NECE Project No. 21-001 T116 Dear Ms. Audette, At your request New England Construction Engineering, PLC (NECE) has reviewed the information that you provided on the roof and supporting structure of the Richard residence, at 207 Brookside Circle, in Northampton, MA. The purpose of the review was to provide an opinion regarding the roofs' capacity to support rooftop mounted Photovoltaic (PV) panels. The information that you provided is attached to this letter for reference. You are proposing to mount PV panels on the house roof house roof. Your proposed array will be mounted on the original main house roof and in intersecting addition. The house is a single- story ranch with gable roof. The roof pitch is 18°.The main roof is supported by site build wood roof fink trusses. The truss members are 2x4, and the top chord appears to be a high grade of Douglas Fir. The member connections were made with plywood gussets. Part of the main house roof has been framed over for a roof extension. Cladding and finishes conceal the roof extension framing, and the intersecting addition roof framing. Contract documents from the 2001 construction indicate that the rafters are 2x8. The roof has a plywood deck and asphalt shingles. The photographs that you provided suggest that house, and the roof is performing well.There are no signs of distress or large deflections. For this reason, and because the spans are reasonable, I see no reason to destroy finishes to observe and confirm framing. Conclusion: Based on my review and analysis, I conclude that, the roof will properly support your proposed PV array. I base this opinion on the following. The PV panels will be installed parallel to the roof, eliminating additional wind load. The ground snow load (Pg) for Northampton is 40 psf. The minimum flat roof load (Pf) is 35psf. Based on information that you provided on similar projects the proposed PV panels weigh approximately 2.3psf. In summary, in my opinion, the roof will support your proposed PV panels. New England Construction Engineering, PLC PV Squared— Richard Residence Jonathan Rugg, P.E. Northampton, MA Page 2 of 2 Thank you for the opportunity to assist with this project. Please contact me if NECE can be of further assistance. "p�ZNOFM4ss Sincerely, 41 JONATHAN A s rn o RUGG /, " No. 51982 0y %athanRu , P . i7 New England Construction Engineering, PLC. r � � 1 10/2921� ;:,:. S ;::.7.DESIGN INPUTS-SATELLITE IMAGERY 8.FIELD MEASUREMENTS ' �: � x i. „,..,...„ a .,.„, „, 6„ Ei E. METER/MAIN SERVICE DISCONNECT - EXTERIOR I- ! aO1J0a1NOJ 83149iS30 INVERTER - EXTERIOR — PV AC DISCONNECT - EXTERIOR ROOF CONSTRUCTION ++ • ROOF TYPE = ASPHALT SHINGLE NI FUSED PV AC DISCONNECT - INTERIOR (BASEMENT)- . PV ARRAY = 702 SQUARE FEET MAIN SERVICE PANEL - INTERIOR (BASEMENT) • TYPICAL ATTACHMENT SPAN =48" w ct O • MAX ATTACHMENT SPAN = 68" Z U 0 • MAX CANTILEVER = 27.2" W w Q g • ATTACHMENTS SHALL BE STAGGERED SO 0 z 1 THE LOAD IS DISTRIBUTED EVENLY TO W (I) Z RAFTERS UNDERNEATH THE ARRAY CC O 0 0 D- A LG380NIC-A6 CLAMP ZONES a Et CO a • DIMENSIONS = 67.75' X 40- =U N. _ pI--- • PORTRAIT CLAMP ZONE: 8.2"TO 23.8" cT cV Ct TRUSSES, 24" O.C. • LANDSCAPE CLAMP ZONE: 4"TO 9.8" O ATTACHMENTS 0 RAIL — - H w Hiyaw _ ARRAY INFORMATION STRING CONFIGURATION "" "" ` ARRAY ARRAY 2 ARRAY a STRING SIZE DOES NOT VARY MOD QTY 26 6 4 STRINGS QTY > I— -- TILT 18° 8° 18`' STRING I 12 Q � Q STRING 2 12 1 AZIMUTH 236° 236° 146` STRING 3 12 Q > n J / 17'-221, 13'-9" 0 V 0 W NI►-` 1 l!7 / 34'-52" i I-3211 2'-5" 111 w PIW 41111111--/-- iViF--. V. 10'-4" 1'-112" SYSTEM DETAILS:13.688W DC ! .'^6 • 36 LG LG3B0NIC-A6.380W MODULES 1� • I SOLAREDGE SEI0000N-US INVERTER "/ RICHARD RESIDENCE DIMENSIONS • CONTACT MATTVAEDCO >usW�[D(OW s�i4741» s • MATT992-7262RED.000P 207 BROOKSIDE CIR • (L13)492-1252 DESIGNER:BRIELLE POLASEE NORTHAMPTON MA 01062 3 SO nomSOLAR e SOLAR 410IV;0041.PERM,PALMOE (///r • • 41:41111111111 , Z] --i C _ c�n 1 • • • rn D 3 cn — rn r Z N --i • • • • • Cil O • \N. • • • • --• • W -PI. • • • al • i� - - ►--L kO %.,l = • — • • 1 NN • • • • • • • • • -- --♦ • 17 -31" / SYSTEM DETAILS:13.68rtW DC o ,'�^a STRING • 16 lG IC-66,380W MODULES g • 1 SOLAREDSE REDGE SEI0000M-US INVERTER ��s DIAGRAM CONTACT MATTVALUERE • MAT RICHARD RESIDENCE € „ .,,ago EC, 81e • (413 99t-]t52'VMVSOUARED.000P 207 BROOKSIDE CIR NOT TO SCALE SOLAR P\s/- 1I 2 DESIGNER:BRIELLE POLASER NORTHAMPTON MA 01062 namosr,e SOLAR iaory owi PrarniT PAC., xww.xu+,sre:a of<iiloi, Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder setup o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work,earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking, sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures -See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List, ordering o Daily check-in o Customer interaction and training activities