Loading...
34-016 (8) SM-2021-0072 176TURKEY HILLRD COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 34-016-001 CITY OF NORTHAMPTON Permit: Sheet Metal PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# SM-2021-0072 PERMISSION IS HEREBY GRANTED TO: Project# Js-2021-001431 Contractor: License: WESTERN MASS HEATING Est. Cost: 180000 COOLING &PLUMBING INC. Const.Class: Exp.Date: ASHMAN, HARVEY A & LINDA DOUCETTE- Use Group: Owner: ASHMAN Lot Size(sq.ft.) WESTERN MASS HEATING COOLING &PLUMBING Zoning: RR Applicant: INC Applicant Address Phone: Insurance: 4-K SOUTH MAIN ST (413)268-7777 HAYDENVILLE, MA 01039 ISSUED ON:Il/22/2021 TO PERFORM THE FOLLOWING WORK: H VAC POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: I 2 Qs-, Fees Paid: $25.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner Commonwealth of Massachusetts Sheet Metal Permit Date: 10-27-2021 RECEIVES Permit# S" / Ocr-Z-07 Estimated Job Cost: $ 180,000 O V 1 5 2021 'ermit Fee: $ 25 Plans Submitted: YES N I P .ns ' eviewed: YES NO DEPT.OF BUILDING INSPECTIONS Business License# 853 NORTHAMPTON. _i.. , _•.ense# Unrestricted Master:25518 Business Information: Property Owner/Job Location Information: Name: Western Mass Heating Cooling&Plumbing, Inc. Name: Harvey Ashman Street: 4 South Main Street,Suite K Street: 176 Turkey Hill Road City/Town: Haydenville,MA 01039 City/Town: Northampton Telephone: 413-268-7777 Telephone: 413-549-0803 Photo I.D. required/Copy of Photo I.D. attached: YES NO 51afr Initial J-1 / M-1-unrestricted license J-2/M-2-restricted to dwellings 3-stories or less and commercial up to 10,000 sq. ft. /2-stories or less Residential: 1-2 family X Multi-family Condo/Townhouses Other Commercial: Office Retail Industrial Educational Institutional Other Square Footage: under 10,000 sq. ft. X over 10,000 sq. ft. Number of Stories: 2 Sheet metal work to be completed: New Work: X Renovation: HVAC X Metal Watershed Roofing Kitchen Exhaust System Metal Chimney/Vents Air Balancing Provide detailed description of work to be done: HVAC system. all ducted geothermal. see attached manual-j. ERV system Bathroom vents Kitchen Hood Laundry vent INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L.Ch. 112 Yes X No❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy KI Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this box®,I hereby certify that all of the details and information I have submitted(or entered)regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Progress Inspections Date Comments Final Inspection Date Comments Type of License: By ® Master Title ❑ �:, ciu f"? 5c. f`'f"CE'r �I Master-Restricted City/Town ❑Journeyperson Signature of Licensee Permit# ❑Journeyperson Restricted License Number: 25518 Fee$ ❑ Check at www.mass.qov/dpl 1uY , ,15 10-901 Inspector Signature of Permit Approval S.\.\ The Commonwealth of Massachusetts Department of Industrial Accidents — — Office of Investigations Z. = Lafayette City Center -jai=`. 2 Avenue de Lafayette, Boston,MA 02111-1750 `,„ � www.mass.gov/dia Workers'Compensation Insurance Affidavit: General Businesses Applicant Information Please Print Legibly Business/Organization Name: Western Mass Heating, Cooling & Plumbing, Inc Address:4 South Main St. Suite K City/State/Zip: Haydenville, MA 01039 Phone#:413-268-7777 Are you an employer?Check the appropriate box: Business Type(required): 1.❑■ I am a employer with 33 employees(full and/ 5. ❑Retail or part-time).* 6. ❑ Restaurant/Bar/Eating Establishment 2.❑ I am a sole proprietor or partnership and have no 7. ❑ Office and/or Sales(incl.real estate,auto,etc.) employees working for me in any capacity. [No workers' comp. insurance required] 8. ❑Non-profit 3.❑ We are a corporation and its officers have exercised 9. ❑ Entertainment their right of exemption per c. 152,§1(4),and we have 10.❑ Manufacturing no employees. [No workers' comp. insurance required]** 11.❑ Health Care 4.❑ We are a non-profit organization, staffed by volunteers, with no employees. [No workers' comp. insurance req.] 12.0 Other HVAC & Plumbing Subcontractr *My applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. **If the corporate officers have exempted themselves,but the corporation has other employees,a workers'compensation policy is required and such an organization should check box#1. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy information. Insurance Company Name:Utica National Ins. Co.of Texas Insurer's Address:PO Box 6532 City/State/Zip: Utica, NY 13504-6532 Policy#or Self-ins. Lic.#5388586 Expiration Date: 10/29/2022 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under§25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify, under the pains and penalties of perjury that the information provided above is true and correct. �i 10/29/2021 /1 ex Signature: G2 dQ�li Date: Phone#: 413-268-777 t 101 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(check one): 1.❑Board of Health 2.0 Building Department 3D City/Town Clerk 4.El Licensing Board 5.0 Selectmen's Office 6.DOther Contact Person: Phone#: www.mass.gov/dia A ® DATE(MM/DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE 10/29/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Nicole Burlett NAME: Webber&Grinnell PA ONE Ext): (413)586-0111 {n/c,No): (413)586-6481 8 North King Street E-MAIL SS: nburlett@webberandgrinnell.com ADDRE INSURER(S)AFFORDING COVERAGE NAIC S Northampton MA 01060 INSURER A: Republic Franklin 12475 INSURED INSURER B: Utica Mutual 25976 Western Mass Heating,Cooling&Plumbing,Inc. INSURER C: Graphic Arts 25984 Attn:Scott Cernak INSURER D: Utica)National Ins.Co.of Texas 43478 4 South Main Street,Suite K INSURER E: Haydenville MA 01039 INSURER F: COVERAGES CERTIFICATE NUMBER: CL21102816777 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDTYPE OF INSURANCE INSD wvDBR POLICY NUMBERPOLICY EFF POLICY EXP LIMITS LTR INSD WVD (MM/DD/YYYY) (MMIDDlYYYY) X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE 1-1OCCUR PREMISES(Ea occurrence) $ 100,000 MED EXP(Any one person) $ 5,000 A CPP5403446 10/29/2021 10/29/2022 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY n To,: n LOC PRODUCTS-COMP/OP AGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) X ANY AUTO BODILY INJURY(Per person) $ B OWNED SCHEDULED 5388587 10/29/2021 10/29/2022 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS— HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY _ AUTOS ONLY (Per accident) PIP-Basic $ 8,000 X.UMBRELLA LIAB _ OCCUR EACH OCCURRENCE $ 5,000,000 C EXCESS LIAB CLAIMS-MADE 5403447 10/29/2021 10/29/2022 AGGREGATE $ DED X RETENTION$ 10'000 $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER D ANY PROPRIETOR/PARTNER/EXECUTIVE N N/A 5388586 10/29/2021 10/29/2022 E.L.EACH ACCIDENT $ 500,000 (Mandatory In NH) EXCLUDED? 500,000 (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under 500,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD Load Short Form Job: Teagno-Harvey Ashman Date: May 1st,2021 "oafEntire House By: WESTERN MISS Western Mass Heating Cooling & Plumbing, Inc. Email:scott@westernmassheatingcooling.com Project Information For: THR Turkey Hill Road, Northampton, MA Design Information Htg Clg Infiltration Outside db (°F) 0 88 Method Simplified Inside db(°F) 71 73 Construction quality Tight Design TD (°F) 71 15 Fireplaces 1 (Tight) Daily range - M Inside humidity(%) 30 50 Moisture difference (gr/lb) 30 26 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref. n/a Coil n/a AHRI ref. n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Basement AHU 2104 14952 3498 557 557 1st Floor AHU 3918 33154 19648 1253 1253 2nd Floor AHU 3208 30190 18556 1253 1253 Workshop 405 1481 74 4 4 Entire House 9635 79777 41776 3067 3311 Other equip loads 5492 1157 Equip. @ 0.93 RSM 39928 Latent cooling 3065 TOTALS 1 9635 I 85268 I 42993 I 3067 I 3311 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -*- wrightsoft' 2021-Jun-0915:14:22 t Right-Suite®Universal 2021 21.0.06 RSU27257 Page 1 AC ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Load Short Form Job: Teagno-Harvey Ashman Date: May 1st,2021 At\ 1st Floor AHU By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email:scott@westernmassheatingcooling.corn Project Information For: THR Turkey Hill Road, Northampton, MA Design Information Htg Clg Infiltration Outside db (°F) 0 88 Method Simplified Inside db(°F) 71 73 Construction quality Tight Design TD (°F) 71 15 Fireplaces 1 (Tight) Daily range - M Inside humidity(%) 30 50 Moisture difference (gr/Ib) 30 26 HEATING EQUIPMENT COOLING EQUIPMENT Make Trane Make Trane Trade TRANE Trade TRANE Model 4TWL9036A1 Cond 4TWL9036A1 AHRI ref 201921878 Coil TAM9A0C42V41 AHRI ref 201921878 Efficiency 11 HSPF Efficiency 12.5 EER,17.75 SEER Heating input Sensible cooling 26320 Btuh Heating output 32800 Btuh @ 47°F Latent cooling 11280 Btuh Temperature rise 24 °F Total cooling 37600 Btuh Actual air flow 1253 cfm Actual air flow 1253 cfm Air flow factor 0.038 cfm/Btuh Air flow factor 0.063 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.93 Capacity balance point= 14°F Backup: Input= 12 kW, Output=40312 Btuh, 100 AFUE ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Master Suite 760 9158 7183 346 456 Rest of 1stFloor 3158 23996 14201 907 901 1st Floor AHU 3918 33154 19648 1253 1253 Other equip loads 1682 354 Equip. @ 0.93 RSM 18603 Latent cooling 1520 TOTALS 1 3918 I 34836 I 20122 I 1253 I 1253 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. �- wNghtsoft' 2021-Jun-0915:14:22 . Right-Suite@Universa12021 21.0.06 RSU27257 Paget ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Load Short Form Job: Teagno-Harvey Ashman Date: May 1st,2021 i 2nd Floor AHU By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email:scott©westemmassheatingcooling.com Project Information For: THR Turkey Hill Road, Northampton, MA Design Information Htg Clg Infiltration Outside db (°F) 0 88 Method Simplified Inside db(°F) 71 73 Construction quality Tight Design ID(°F) 71 15 Fireplaces 1 (Tight) Daily range - M Inside humidity(%) 30 50 Moisture difference (gr/lb) 30 26 HEATING EQUIPMENT COOLING EQUIPMENT Make Trane Make Trane Trade TRANE Trade TRANE Model 4TWL9036A1 Cond 4TWL9036A1 AHRI ref 201921878 Coil TAM9A0C42V41 AHRI ref 201921878 Efficiency 11 HSPF Efficiency 12.5 EER,17.75 SEER Heating input Sensible cooling 26320 Btuh Heating output 32800 Btu h @ 47°F Latent cooling 11280 Btuh Temperature rise 24 °F Total cooling 37600 Btuh Actual air flow 1253 cfm Actual air flow 1253 cfm Air flow factor 0.042 cfm/Btuh Air flow factor 0.061 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.92 Capacity balance point= 11 °F Backup: Input= 10 kW, Output= 33754 Btuh, 100 AFUE ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd Fl North 1647 15683 10864 651 661 2nd FI South 1561 14506 12017 602 732 2nd Floor AHU 3208 30190 18556 1253 1253 Other equip loads 1928 406 Equip. @ 0.93 RSM 17635 Latent cooling 1752 TOTALS I 3208 I 32117 I 19387 I 1253 I 1253 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wHghfisoft- 2021-Jun-0915.14:22 Right-Suite®Universal 2021 21.0.06 RSU27257 Page 3 ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Load Short Form Job: Teagno-Harvey Ashman Date: May 1st,2021 III" Basement AHU By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Nr4Mr.cocuw..n mmoc Email'scott©westernmassheatingcooling.com Project Information For: THR Turkey Hill Road, Northampton, MA Design Information Htg Clg Infiltration Outside db (°F) 0 88 Method Simplified Inside db(°F) 71 73 Construction quality Tight Design TD (°F) 71 15 Fireplaces 1 (Tight) Daily range - M Inside humidity(%) 30 50 Moisture difference (gr/lb) 30 26 HEATING EQUIPMENT COOLING EQUIPMENT Make Trane Make Trane Trade TRANE Trade TRANE Model 4TWR6018H1 Cond 4TWR6018H1 AHRI ref 202341124 Coil C(A,C,D,E)24A34+S9V2B060D3PSA+TDR AHRI ref 202341124 Efficiency 8.4 HSPF Efficiency 12.3 EER, 17 SEER Heating input Sensible cooling 11690 Btuh Heating output 16700 Btuh @ 47°F Latent cooling 5010 Btuh Temperature rise 27 °F Total cooling 16700 Btuh Actual air flow 557 cfm Actual air flow 557 cfm Air flow factor 0.037 cfm/Btuh Air flow factor 0.159 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.81 Capacity balance point= 12°F Backup: Input= 10 kW, Output=33754 Btuh, 100 AFUE ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) BSMT TV Room 398 1648 545 61 87 Future Excersize 351 1817 214 68 34 BSMT Stair/Hall 698 6059 1963 226 313 Excersize Rm 006 280 1550 520 58 83 Basement Bath 70 525 33 20 5 Connector 001 307 3352 223 125 36 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. - - wrightsoft' 2021-Jun-0915:14:22 1: Right-Suite®U niversal 2021 21.0.06 RSU27257 Page IKi ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Basement AHU 2104 14952 3498 557 557 Other equip loads 1119 236 Equip. @ 0.93 RSM 3472 Latent cooling 858 TOTALS 1 2104 I 16071 I 4330 I 557 I 557 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -Ilkwrightsof- 2021-Jun-09 15:14:22 AM Right-Suite®Universal 2021 21.0.06 RSU27257 Page 5 A ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Load Short Form Job: Teagno-Harvey Ashman �, Date: May 1st,2021 •; Workshop By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email'scott©westernmassheatingcooling.corn Project Information For: THR Turkey Hill Road, Northampton, MA Design Information Htg Clg Infiltration Outside db (°F) 0 88 Method Simplified Inside db(°F) 71 73 Construction quality Tight Design TD (°F) 71 15 Fireplaces 1 (Tight) Daily range - M Inside humidity(%) 30 50 Moisture difference(gr/Ib) 30 26 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 0 HSPF Efficiency 0 SEER Heating input Sensible cooling 0 Btuh Heating output 0 Btuh @ 47°F Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 4 cfm Actual air flow 4 cfm Air flow factor 0.003 cfm/Btuh Air flow factor 0.051 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.55 Capacity balance point=0°F Backup: Input= 1 kW, Output=2239 Btuh, 100 AFUE ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Workshop 008 405 1481 74 4 4 Workshop 405 1481 74 4 4 Other equip loads 763 161 Equip. @ 0.93 RSM 218 Latent cooling 191 TOTALS 1 405 I 2244 I 409 I 4 I 4 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wHghtsofr' 2021-Jun-09 15:14:22 Right-Suite®U niversal 2021 21.0.06 RSU27257 Page ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Load Short Form Job: Teagno-Harvey Ashman si 2nd Fl North Date: May 1st,2021 By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email:scott@westernmassheatingcooling com Project Information For: THR Turkey Hill Road, Northampton, MA Design Information Htg Clg Infiltration Outside db (°F) 0 88 Method Simplified Inside db(°F) 71 73 Construction quality Tight Design TD (°F) 71 15 Fireplaces 1 (Tight) Daily range - M Inside humidity (%) 30 50 Moisture difference(gr/Ib) 30 26 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd fl hall/stair 280 2944 1352 122 82 Hall 208+202 238 305 205 13 12 Guest bath 213 110 1908 1320 79 80 Bath 207 58 78 50 3 3 Guest BR 206 242 2427 1891 101 115 Office 208 351 4325 2659 180 162 Guest ste 213 368 3696 3387 153 206 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ,` - wrightsoft' 2021-Jun-0915:14:22 Right-Suite®Universal 2021 21.0.06 RSU27257 Page /'C ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N 2nd Fl North 1647 15683 10864 651 661 Other equip loads 0 0 Equip. @ 0.93 RSM 10104 Latent cooling 673 TOTALS I 1647 I 15683 I 10777 I 651 I 661 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -PP- wrightsoft' 2021-Jun-0915:14:22 ....... Right-Suite®Universal 2021 21.0.06 RSU27257 Page 8 AC ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Load Short Form Job: Teagno-Harvey Ashman Date: May 1st,2021 1-; 2nd Fl South By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email'scott©westernmassheatingcooling.com Project Information For: THR Turkey Hill Road, Northampton, MA Design Information Htg CIg Infiltration Outside db (°F) 0 88 Method Simplified Inside db(°F) 71 73 Construction quality Tight Design TD(°F) 71 15 Fireplaces 1 (Tight) Daily range - M Inside humidity(%) 30 50 Moisture difference (gr/lb) 30 26 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load CIg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Guest ste 211 380 3712 3164 154 193 Guest bath 211 110 1908 1238 79 75 Fam Room 209 351 2654 2726 110 166 Guest Liv 204 371 2143 2137 89 130 Bath 206 75 656 275 . 27 17 Guest ste 205 274 3432 2477 ` 142 151 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsof't- 2021-Jun-09 15:14:22 A ...., Right-Suite®Universal 2021 21.0.06 RSU27257 Page 9 ..II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N 2nd Fl South 1561 14506 12017 602 732 Other equip loads 0 0 Equip. @ 0.93 RSM 11176 Latent cooling 638 TOTALS 1 1561 I 14506 I 11814 I 602 I 732 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. A - W�holt 2021-Jun-0915:14:22 ...._. Right-Suite®Universal 2021 21.0.06 RSU27257 Page 10 �...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJfi Front Door faces: N Load Short Form Job: Teagno-Harvey Ashman Date: May 1st,2021 -I.N. Master Suite By: WESTERN M:, SS Western Mass Heating Cooling & Plumbing, Inc. Email.scott@westernmassheatingcoolingcorn Project Information For: THR Turkey Hill Road, Northampton, MA Design Information Htg Clg Infiltration Outside db (°F) 0 88 Method Simplified Inside db(°F) 71 73 Construction quality Tight Design TD(°F) 71 15 Fireplaces 1 (Tight) Daily range - M Inside humidity(%) 30 50 Moisture difference (gr/lb) 30 26 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Main Closet/Hall 228 743 96 28 6 Main Bedroom 118 314 4749 4264 179 271 Main Bath 116 219 3665 2823 139 179 Master Suite 760 9158 7183 346 456 Other equip loads 0 0 Equip. @ 0.93 RSM 6680 Latent cooling 602 TOTALS 1 760 I 9158 I 7282 I 346 I 456 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -*- wrightsoft' 2021-Jun-0915:14:22 ._._�_,_._., Right-Suite®Universal 2021 21.0.06 RSU27257 Page 11 ...11\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N ".-3! Load Short Form Job: Teagno-Harvey Ashman Date: May 1st,2021 Rest of lstFloor By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email:scott©westernmassheatingcooling.com Project Information For: THR Turkey Hill Road, Northampton, MA Design Information Htg Clg Infiltration Outside db(°F) 0 88 Method Simplified Inside db(°F) 71 73 Construction quality Tight Design TD (°F) 71 15 Fireplaces 1 (Tight) Daily range - M Inside humidity(%) 30 50 Moisture difference (gr/lb) 30 26 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft°) (Btuh) (Btuh) (cfm) (cfm) Library 114 324 2530 1587 96 101 Entry 113 254 2264 1217 86 77 Living Room 112 770 4162 3361 157 213 Dining 111 324 2901 1626 110 103 Kitchen 109 551 3410 3300 129 209 Hall/Stairs 379 1275 286 48 18 Pantry 128 1794 609 68 39 Powder Room 52 648 273 24 17 Mudroom 103 377 5013 1941 189 123 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2021-Jun-09 15:14:22 t - wrightsof'Y.... —„_„.., Right-Suite®Universal 2021 21.0.06 RSU27257 Page 12 AC ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Rest of 1 stFloor 3158 23996 14201 907 901 Other equip loads 0 0 Equip. @ 0.93 RSM 13207 Latent cooling 533 TOTALS I 3158 I 23996 I 13740 I 907 I 901 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft- 2021-Jun-09 15:14:22 t " ' —...—.,:..,... Right-Suite®Universal 2021 21.0.06 RSU27257 Page 13 ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N BuildingAnalysisJob: Teagno-Harvey Ashman Date: May 1st,2021 -i Entire House By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email:scott©westernmassheatingcooling com Pro'ect Information For: THR Turkey Hill Road, Northampton, MA Desi• n Conditions Location: Indoor: Heating Cooling Chicopee Falls/West, MA, US Indoor temperature(°F) 71 73 Elevation: 246 ft Design TD (°F) 71 15 Latitude: 42°N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.7 26.3 Dry bulb(°F) 0 88 Infiltration: Daily range (°F) - 23 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Heatin• Component Btuh/ft2 Btuh %of load Walls 3.8 25942 30.4 VErtildim Glazing 29.2 30190 35.4 Doors 32.8 2063 2.4 wjI irfiitriat Ceilings 1.4 5701 6.7 Floors 0.8 3071 3.6 Floas Infiltration 2.1 12810 15.0 Ducts 0 0 Piping 0 0 Calirgs Humidification 0 0 Doas Ventilation 5492 6.4 Adjustments 0 Total 85268 100.0 Gaarg Coolin• Component Btu h/ft2 Btuh % of load Walls 0.5 3574 8.3 \AN Valildiginliairs Glazing 27.7 28620 66.7 Irfiltr°fimn Doors 11.5 726 1.7 Ceilings 0.9 3559 8.3 Calirgs Floors 0.0 7 0.0 Infiltration 0.2 1349 3.1 OhEr Ducts 0 0 Ventilation 1157 2.7 Internal gains 3940 9.2 Blower 0 0 Adjustments 0 paid Total 42933 100.0 Latent Cooling Load =3065 Btuh Overall U-value =0.058 Btuh/ft2-°F Data entries checked. ' Wff�ht�O ` 2021-Jun-0915:14.22 .m..A •• tf"tRight-Suite®Universal 2021 21.0.06 RSU27257 Page 1 ..II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Buildin Anal sis Job: Teagno-Harvey Ashman g Y Date: May 1st,2021 • 1st Floor AHU By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. N'Y,non Ni Y�wA Email:scott@westernmassheatingcooling.com Pro'ect Information For: THR Turkey Hill Road, Northampton, MA Desi• n Conditions Location: Indoor: Heating Cooling Chicopee Falls/West, MA, US Indoor temperature(°F) 71 73 Elevation: 246 ft Design TD (°F) 71 15 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 29.7 26.3 Dry bulb(°F) 0 88 Infiltration: Daily range(°F) - 23 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Heatin• Component Btuh/ft2 Btuh %of load Walls 3.3 9064 26.0 Vertildicn Glazing 29.3 15158 43.5 \Ad irctrAm Doors 35.2 1480 4.2 Ceilings 1.4 1025 2.9 Floors 0 0 0 Infiltration 2.1 6427 18.4 Ceiirgs Ducts 0 0 Piping 0 0s Humidification 0 0 Ventilation 1682 4.8 Adjustments 0 Total 34836 100.0 aazirg h Coolin• Component Btu h/ft2 Btuh %of load Walls 0.5 1343 6.7 'MI C&a Irk Cirs Glazing 27.5 14249 71.2 Doors 12.4 521 2.6 Irfiltrai m Ceilings 1.0 699 3.5 Calirgs Floors 0 0 0 Etas Infiltration 0.2 677 3.4 Ducts 0 0 Ventilation 354 1.8 Internal gains 2160 10.8 Blower 0 0 Adjustments 0 Gazing Total 20003 100.0 Latent Cooling Load = 1520 Btuh Overall U-value =0.069 Btuh/ft2-°F Data entries checked. WI719hliO1�` 2021-Jun-09 15:14:22 /0..C.A • - -.-. Right-Suite®Universal 2021 21.0.06 RSU27257 Paget ..II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Buildin Anal sis Job: -Harvey Ashman g y Date: May May ls 1st,2021 l 2nd Floor AHU By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email:scott©westernmassheatingcooling.com Pro'ect Information For: THR Turkey Hill Road, Northampton, MA Desi• n Conditions Location: Indoor: Heating Cooling Chicopee Falls/West, MA, US Indoor temperature (°F) 71 73 Elevation: 246 ft Design TD (°F) 71 15 Latitude: 42°N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 29.7 26.3 Dry bulb(°F) 0 88 Infiltration: Daily range(°F) - 23 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Heatin• Component Btu Mt' Btuh %of load Walls 4.6 7884 24.5 VErf laic' Glazing 29.2 13312 41.4 vtil irtiiratim Doors 0 0 0 Ceilings 1.4 4492 14.0 qtEr Floors 3.4 34 0.1 Infiltration 2.1 4468 13.9 Ducts 0 0 Calirgs Piping 0 0 Humidification 0 0 Ventilation 1928 6.0 Adjustments 0 Total 32117 100.0 aazirg Coolin• Component Btu h/ft2 Btuh % of load \bti Walls 0.9 1534 8.1 Val I m Iji ea Glazing 28.3 12890 68.0 �' Doors 0 0 0 Celirgs Ceilings 0.8 2735 14.4 Floors 0.7 7 0.0 Infiltration 0.2 471 2.5 Ducts 0 0 Ventilation 406 2.1 Internal gains 920 4.9 Blower 0 0 Adjustments 0 Gairg Total 18962 100.0 Latent Cooling Load = 1752 Btuh Overall U-value=0.067 Btuh/ft2-°F Data entries checked. �l� W���O�._ 2021-Jun-0915:14:22 t � •-. .. . ---. Right-Suite®Universal 2021 21.0.06 RSU27257 Page 3 ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N BuildingAnalysis Job: Teagno-Harvey Ashman 1 Date: May 1st,2021 "L., . Basement AHU By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. N t'Y.°.ttF•trw.'i A. Email:scott@westernmassheatingcooling.com Pro'ect Information For: THR Turkey Hill Road, Northampton, MA Desi•n Conditions Location: Indoor: Heating Cooling Chicopee Falls/West, MA, US Indoor temperature(°F) 71 73 Elevation: 246 ft Design TD (°F) 71 15 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 29.7 26.3 Dry bulb(°F) 0 88 Infiltration: Daily range (°F) - 23 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Heatin• Component Btuh/ft2 Btuh %of load Walls 4.3 8151 50.7 Ventilaecn Glazing 29.2 1721 10.7 I filtraSm Doors 27.8 583 3.6 Ceilings 18.1 184 1.1 Floors 1.2 2547 15.8 Infiltration 2.1 1766 11.0 vAi Flocs Ducts 0 0 Piping 0 0 Humidification 0 0 Ctlir Ventilation 1119 7.0 Dons Adjustments 0 aaarg Total 16071 100.0 Coolin• Component Btuh/ft2 Btuh % of load Walls 0.3 640 17.1 V1�1 \rtiliim iiiGlazing 25.1 1481 39.7 Doors 9.8 205 5.5 Ceilings 12.4 125 3.4 lr Cars Floors 0 0 0 Infiltration 0.2 186 5.0 Ducts 0 0 Ventilation 236 6.3 cn Internal gains 860 23.0 Irfilt Blower 0 0 Gairg Celings Adjustments 0 Chas Total 3733 100.0 Latent Cooling Load = 858 Btuh Overall U-value=0.040 Btuh/ft-°F WARNING:window to floor area ratio=2.8%-less than 5%. W W�htioft 2021-Jun-09 15:14:22 - --. Rig ht-Suite®Univ ersal 2021 21.0.06 RSU27257 Page 4 ...Il\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N BuildingAnalysis Job: Teagno-HarveyAshman b Y Date: May 1st,2021 +� Workshop By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email:scott@westernmassheatingcooling.com Pro'ect Information For: THR Turkey Hill Road, Northampton, MA Desi• n Conditions Location: Indoor: Heating Cooling Chicopee Falls/West, MA, US Indoor temperature(°F) 71 73 Elevation: 246 ft Design TD(°F) 71 15 Latitude: 42°N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 29.7 26.3 Dry bulb(°F) 0 88 Infiltration: Daily range(°F) - 23 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Heatin• Component Btu h/ft2 Btuh % of load Walls 1.6 842 37.5 Glazing 0 0 0 Doors 0 0 0 vertilJim Ceilings 0 0 0 nil Floors 1.2 490 21.8 Infiltration 2.1 149 6.6 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 763 34.0 Irfiltratim Adjustments 0 Total 2244 100.0 Flans Coolin• Component Btu Wit' Btuh % of load Walls 0.1 58 24.7 Glazing 0 0 0 v�l Doors 0 0 0 Ceilings 0 0 0 Floors 0 0 0 Infiltration 0.2 16 6.7 Ducts 0 0 Ventilation 161 68.6 Irfiltrabm Internal gains 0 0labm Blower 0 0 Adjustments 0 Total 234 100.0 Latent Cooling Load = 191 Btuh Overall U-value=0.018 Btuh/ft2-°F WARNING:window to floor area ratio= 0.0%-less than 5%. Wrightson- 2021-Jun-0915:14:22 •- - Right-Suite®Universal 2021 21.0.06 RSU27257 Page 5 ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Buildin Anal sis Job: Teagno-HarveyAshman g y Date: May 1st,2021 Xit:SL 2nd Fl North By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email'scott@westernmassheatingcooling com Pro'ect Information For: THR Turkey Hill Road, Northampton, MA Desi• n Conditions Location: Indoor: Heating Cooling Chicopee Falls/West, MA, US Indoor temperature(°F) 71 73 Elevation: 246 ft Design TD (°F) 71 15 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 29.7 26.3 Drybulb(°F) 0 88 Infiltration: Daily range (°F) - 23 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Heatin• Component Btu htft2 Btuh % of load Walls 4.6 4324 27.6 Infiltraticn Glazing 29.2 6444 41.1 vvE41 Doors 0 0 0 Ceilings 1.5 2491 15.9 Oiler Floors 3.4 34 0.2 �l Infiltration 2.1 2390 15.2 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 15683 100.0 i aajn3 Coolin• Component Btuh/ft2 Btuh % of load 1 tz : e: . Walls 0.9 841 7.7 W41 •:Q1 Glazing 35.9 7934 73.0 Celirgs Doors 0 0 0 Ceilings 0.8 1371 12.6 Floors 0.7 7 0.1 Infiltration 0.2 252 2.3 Ducts 0 0 Ventilation 0 0 Internal gains 460 4.2 Blower 0 0 Adjustments 0 Total 10864 100.0 Gazirg Latent Cooling Load =673 Btuh Overall U-value =0.065 Btuh/ft2-°F Data entries checked. W N9hti��1R' 2021-Jun-09 15:14:22 i9. CA ..---- Right-Suite®Universal 2021 21.0.06 RSU2 7257 Page6 ...II Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Building Y Anal sis Job: Teagno-Harvey Ashman Date: May 1st,2021 +�-� 2nd Fl South By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email:scoff©westernmassheatingcooling.com Pro'ect Information For: THR Turkey Hill Road, Northampton, MA Desi• n Conditions Location: Indoor: Heating Cooling Chicopee Falls/West, MA, US Indoor temperature(°F) 71 73 Elevation: 246 ft Design TD (°F) 71 15 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 29.7 26.3 Dry bulb(°F) 0 88 Infiltration: Daily range (°F) - 23 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Heatin• Component Btuh/ft2 Btuh % of load Walls 4.6 3560 24.5 Infiltrim Glazing 29.2 6867 47.3 wziI Doors 0 0 0 Ceilings 1.3 2001 13.8 Floors 0 0 0 Cdlirgs Infiltration 2.1 2078 14.3 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 14506 100.0 aging Coolin• Component Btu h/ft2 Btuh %of load Walls 0.9 692 5.8 V1�1 Ir �r>; Glazing 39.5 9281 77.2 Calirgs Doors 0 0 0 Ceilings 0.9 1364 11.4 Floors 0 0 0 Infiltration 0.2 219 1.8 Ducts 0 0 Ventilation 0 0 Internal gains 460 3.8 Blower 0 0 Adjustments 0 Total 12017 100.0 Gaarg Latent Cooling Load =638 Btuh Overall U-value=0.068 Btuh/ft2-°F Data entries checked. wr1ghtset' 2021-Jun-09 15:14:22 "..2,A •-• - - Right-Suite®Universal 2021 21.0.06 RSU27257 Page 7 ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Cale=MJ8 Front Door faces: N Buildin Anal sis Job: -Harvey Ashman g Y Date: May May 1s 1st,2021 "-TT Master Suite By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. Email scott@westernmassheatingcooling com Pro'ect Information For: THR Turkey Hill Road, Northampton, MA Desi• n Conditions Location: Indoor: Heating Cooling Chicopee Falls/West, MA, US Indoor temperature(°F) 71 73 Elevation: 246 ft Design TD (°F) 71 15 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 29.7 26.3 Dry bulb(°F) 0 88 Infiltration: Daily range (°F) - 23 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Heatin• Component Btu h/ft2 Btuh %of load Walls 3.6 2497 27.3 Glazing 29.2 4408 48.1 Irfil4atrn Doors 0 0 0 v�I Ceilings 1.4 488 5.3 Floors 0 0 0 ceilings Infiltration 2.1 1764 19.3 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 9158 100.0 awing Coolin• Component Btuh/ft2 Btuh % of load Walls 0.5 370 5.2 Val I ru Glazing 38.6 5834 81.2 Ifi �i'rgs Doors 0 0 0 Ceilings 1.0 333 4.6 Floors 0 0 0 Infiltration 0.2 186 2.6 Ducts 0 0 Ventilation 0 0 Internal gains 460 6.4 Blower 0 0 Adjustments 0 Total 7183, 100.0 Gairg Latent Cooling Load =602 Btuh Overall U-value =0.053 Btuh/ft2-°F Data entries checked. . V1/t'1,�17tsoft` 2021-Jun-0915:14:22 - -•-. Right-Suite®U niversal 20 21 21.0.06 RSU27257 Page 8 . ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N Buildin Anal Job: Teagno-Harvey Ashman g 1 Date: May 1st,2021 .RRest of lstFloor By: WESTERN MASS Western Mass Heating Cooling & Plumbing, Inc. y-r,r.nw. n�nw.'iR Email scott@westernmassheatingcooling.com Pro'ect Information For: THR Turkey Hill Road, Northampton, MA Desi• n Conditions Location: Indoor: Heating Cooling Chicopee Falls/West, MA, US Indoor temperature(°F) 71 73 Elevation: 246 ft Design TD(°F) 71 15 Latitude: 42°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 29.7 26.3 Drybulb(°F) 0 88 Infiltration: Daily range (°F) - 23 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Tight) Heatin• Component Btu h/ft2 Btuh % of load Walls 3.2 6567 27.4 Glazing 29.3 10750 44.8 Irfiltdim Doors 35.2 1480 6.2 vvAl Ceilings 1.4 537 2.2 Ceilings Floors 0 0 0 Infiltration 2.1 4663 19.4 cous Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 23996 100.0 aging Coolin• Component Btu h/ft2 Btuh % of load Walls 0.5 973 6.9 Vill IrtErnalairs Glazing 27.7 10150 71.5 Irfiltrm Doors 12.4 521 3.7 Celirgs Ceilings 1.0 366 2.6 Cbas Floors 0 0 0 Infiltration 0.2 491 3.5 Ducts 0 0 Ventilation 0 0 Internal gains 1700 12.0 Blower 0 0 Adjustments 0 Gairg Total 14201 100.0 Latent Cooling Load = 533 Btuh Overall U-value =0.078 Btuh/ft2-°F Data entries checked. - wr1ghtsoft- 2021-Jun-09 15:14:22 � •-•-� -,-- Right-Suite®Universal 2021 21.0.06 RSU27257 Page 9 -� ...II\Load Calcs\Turkey Hill Manual-J(5-1-21).rup Calc=MJ8 Front Door faces: N N I \ eaz.m. MO TV Rom Sawa,007 MIT s,rmr GM,001 Ban Ma-Mug MO Job#: Teagno - Harvey Ashman Western Mass Heating Cooling & Plu... Scale: 1 : 246 Performed for: Page 1 THR Turkey Hill Road Right-Suite®Universal 2021 Northampton,MA 21.0.06 RSU27257 2021-Jun-09 15:15:03 scott@westernmassheatingcooling.com ...urkey Hill Manual-J(5-1-21).rup N 1 1st Floor 1\ Pantry Part iltl,m.1111 'mat*yon 1lM1-Papa Ill WFCb.wM.. MuSmm 103 IW ISun Mg1t lorry tt. ne.n lti c1ry 1v Job #: Teagno - Harvey Ashman Western Mass Heating Cooling & Plu... Scale: 1 : 246 Performed for: Page 2 THR Turkey Hill Road Right-Suite®Universal 2021 Northampton, 21.0.06 RSU27257 M2021-Jun-09 15:15:03 scott@westernmassheatingcooling.com ...urkey Hill Manual-J(5-1-21).rup NI sle Bath ms cuest p,ro� wa un zti me.zm .n,nwv,t bath zm � wear n Job #: Teagno - Harvey Ashman Western Mass Heating Cooling & Plu... Scale: 1 : 246 Performed for: Page 3 THR Turkey Hill Road Right-Suite®Universal 2021 Northampton,MA 21.0.06 RSU27257 2021-Jun-09 15:15:03 scott@westernmassheatingcooling.com ...urkey Hill Manual-J(5-1-21).rup