06-C-06 Utilities-CERTIFIEDZONE: CBZONE: URCZONE: CBZONE: URCBRIDGE S
T
R
E
E
T
H
AW
L
E
Y
S
T
R
E
E
T
PHILLIPS PLACE
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.vhb.comDate
One Federal Street
Building 103-3N
Springfield, MA 01105
413.747.7113
Hawley Street
Residential
Development
10 Hawley Street
Northampton, Massachusetts
Construction April 27, 2020
13
42540.00
Utility Plan
C-6
6
Feet6030015
NOTES:
1)ALL UTILITIES TO THE EXISTING CHURCH SHALL BE MAINTAINED.
2)ALL SANITARY SEWER SERVICE CONNECTIONS TO THE BUILDINGS SHALL BE 4" DIAMETER PVC AND HAVE A
MINIMUM SLOPE OF 1%. SEE PLUMBING PLANS.
3)ALL ROOF LEADERS SHALL BE 4" HDPE PIPES. SEE ARCHITECTURAL PLANS.
4)ALL AREA DRAINS SHALL BE 6" HDPE PIPES.
5)ALL AREA DRAINS TO HAVE FLUSH GRATE TOPS.
6)THE WATER LINE FROM THE MAIN TO THE FIRE CLOSET SHALL BE 4" CLDI. THE WATER LINE MUST SPLIT OUTSIDE
THE METER ROOM UNDERGROUND WITH SEPARATE SHUT OFF VALVES. SEE PLUMBING PLANS.
7)THE DOMESTIC WATER SERVICE FROM THE FIRE CLOSET TO EACH UNIT SHALL BE 1 14" DIAMETER TYPE 'K' COPPER.
SEE PLUMBING PLANS.
8)THE DOMESTIC WATER SERVICE FOR EACH BUILDING SHALL HAVE A PRESSURE REDUCING VALVE. SEE PLUMBING
PLANS.
9)COORDINATE WITH ELECTRIC COMPANY PRIOR TO ANY UTILITY POLE RELOCATIONS OR REMOVALS.
10)CONTRACTOR TO VERIFY DEPTH OF EXISTING WATER LINES IN HAWLEY STREET AND PHILLIPS PLACE AND
PROVIDE ENGINEER WITH INFORMATION TO HELP PREVENT CONFLICTS WITH PROPOSED PIPE CROSSINGS.