32C-318 (8) 47 HENRY ST COMMONWEALTH OF MASSACHUSETTS BP-2021-1915
Map:Block:Lot:32C-318-
001 CITY OF NORTHAMPTON
Permit: Solid Fuel
Appliance
PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
BUILDING PERMIT
Penn it# BP-2021-1915 PERMISSIONIS HEREBY GRANTED TO:
Project# PELLET STOVE Contractor: License:
Est. Cost: THE FIRE PLACE 99401
Const.Class: Exp.Date:01/06/2022
Use Group: Owner: BENSONOFF DANIEL &KOKORO
Lot Size (sq.ft.)
Zoning: URC Applicant: THE FIRE PLACE
Applicant Address Phone: Insurance:
PO BOX 606 (413)397-3463 01400503301116
WHATLEY, MA 01093
ISSUED ON:09/22/2021
TO PERFORM THE FOLLOWING WORK:
PELLET STOVE
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter: Footings:
Rough: Rough: House # Foundation:
Driveway Final: Final: Final: Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Signature: I., • + yQ , �
Fees Paid: $40.00
212 Main Street, Phone(413)587-1240,Fax:(413)587-1272
Office of the Building Commissioner
c N City of Northampton
,oft v_r,,,„ `s-a. 6r
Massachusetts w' ..- ;cam
& ,t c
t'-.I 0`' .'till DEPARTMENT OF BUILDING INSPECTIONS ,- '
5
o §n' `'." 212 Main Street • Municipal Building rv,� .tia
NI is .. Northampton, MA 01060 ss;`.'„�S4'
, j
c.z
;1-M
LICATION FOR SOLID FUEL APPLIANCE INSTALLATION
Property Information
Owners Name: ")a n lc f 3e n ,,gno
Address: y7 /IrsT Sirs > A or1A,,nip/on
(No.) (Street Address)
Phone: y/_- 6 95: 44 5/S Cell: Email:
gn Q � - � Date: �^I2'Z\
Owners Signature:
Contractor's Information (If Applicable)
Name: 7)o u ./tS L 1).4?c fc.l7lt ec_ Phone: d/3 %1 554
Construction Supervisor's License #: /9VO / Expiration: /-L .?
Home Impr. Contractor License #: /1GS/77 Expiration: //-/P�.2
Stove Information
Type of Fuel (check all that apply): Wood Pellet Coal
Location: OcnLdoor - yvrt Freestanding Y Insert
Manufacturer: kid rol en Model: 75/ pc/A -
FOR BUILDING DEPARTMENT USE ONLY
Permit# Date Applied: Total all Fees: $
Building Official: h eimi Kp55 Date Issued: 9- Z2-202 i
%
Signature of Building Official:
'�—
r, The Conrnronwealth of Massachusetts
F:�� j,� Department of Industrial Accidents
"1)• :��1r--;; Office of Investigations
i Lafayette City Center
— t
;� • 2 Avenue de Lafayette, Boston,NIA 02111-1750
._ www.njass.gov/dia
Workers' Compensation Insurance Affidavit: General Businesses
Applicant Information Please Print Legibly
Business/Organization Name:THE FIRE PLACE
Address: 100 STATE RD
City/State/Zip:WHATELY, MA 01093 Phone#:413-397-3463
Are you an employer? Check the appropriate box: Business Type(required):
1.0 I am a employer with 10 employees (full and/ 5. ❑ Retail
or part-time).'` 6. ❑ Restaurant/Bar/Eating Establishment
2.❑ i am a sole proprietor or partnership and have no 7. ❑ Office and/or Sales(incl.real estate,auto.etc.)
employees working for me in any capacity.
[No workers' comp. insurance required] 8. ❑Noo-profit
3.❑ We are a corporation and its officers have exercised 9. ❑ Entertainment
their right of exemption per c. 152, §1(4),and we have 10.0 Manufacturing
no employees. [No workers' comp. insurance required]" 11.❑ Health Care
4.❑ We are a non-profit organization,staffed by volunteers,
with no employees. [No workers' comp. insurance req.] 12.E Other
"Any applicant that checks box_1 must also till out the section below showing their workers'compensation policy information. •
ll*If the corporate officers have exempted themselves.but the corporation has other employees-a workers'compensation policy is required and such an
organization should check box#I.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy information.
insurance Company Name:MA RETAIL MERCHANTS WC GROUP INC
Insurer's Address: P.O. BOX 859222-9222
Cite State Zit): BRAINTREE, MA 02185
Polio = or Self-ins. Lic. =01400503301116 Expiration Date: 1-1-22
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under§25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up
to S1.500.00 and'or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORI)ER and a fine of up to
S250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of
the DIA for insurance coverage verification.
I do hereby certify
under the pains and per alties ofperjury that the information provided above is true and correct.
C.Signature: (/ '-C./& ' . a Date: 9• 1 02/
Phone=: '/" J ri .3V 3
I Official use only. Do not write irr this area,to be completed by city or town official
City or Town: Permit/License#
Issuing Authority(check one):
1.❑Board of Health 2.0 Building Department 3.❑City/Town Clerk 4.0Licensing Board
5.0 Selectmen's Office 6.['Other
Contact Person: Phone#:
v v.mass.aov/dia
4 Termination Location and Vent Information
A. Vent Termination Minimum Clearances Note: Follow venting manufacturer's recommendations for
sealing pipe joints.
#1 Preferred method (Figure 4.1)
This method provides excellent venting for normal operation
and allows the stove to be installed closest to the wall. Two
inches from the wall is safe; however, four inches allows
better access to remove the rear panel.The vertical portion of
the vent should be three to five feet high.This vertical section
will help provide natural draft in the event of a power failure.
Do not place joints within wall pass-through.
L
3 Ft.
to
Combustibles
4 \
e A- _
. ' r
'I 3 Ft.
to Combustibles
Figure 4.1
_\ #2 Preferred method (Figure 4.2)
\ This method also provides excellent venting for normal
operation but requires the stove to be installed farther from
the wall. The vertical portion of the vent should be three to
five feet high and at least 1" from a combustible wall. This
— vertical section will provide natural draft in the event of a
power failure.
_ If the stove is installed below grade be sure the vent
C. [= i I termination is at least 12"above grade. The outlet must also
be 1 foot from the house/building.
3 to Ft. Do not place joints within wall pass-through.
Combustibles
A CAUTION
- \ Keep combustible materials (such as grass, leaves,
etc.) at least 3 feet away from the flue outlet on the
- outside of the building.
4 yl
ram _
3 Ft.
to Combustibles
Figure 4.2
11 Harman® • P-Series Installation Manual_R4 • 2018- - 04/21 8390-0441
•
B. Chimney Diagram
IIID AE
L Detail
b IN re /
closed r —
—B .- Porch or Deck
olenanb' vexedIN
Openable or Fined
L o F B used C
NNNv ,Openable 11111111111
Sidewalk B l j
MIIMIIIIIIIk
A K
i
--9
ri=Vent Terminal 0 =Air Supply Inlet v
A =Area where termination is not permitted
Figure 4.10
Requirements for Terminating the Venting I. The clearance to service regulator vent outlet must be a
• Venting terminals must not be recessed into a wall minimum of 6 feet.
or siding. J. The clearance to a non-mechanical air supply inlet to the
• Only PL vent pipe wall pass-through and fire stops building or the combustion air inlet to any other appliance
should be used when venting through combustible must be a minimum of 48".
materials. K. The clearance to a mechanical air supply inlet must be a
• Always take into consideration the effect the minimum of 10 feet. (with outside air installed, 6 feet)
prevailing wind direction or other wind currents will L. The clearance above a paved sidewalk or a paved
cause with flyash and /or smoke when placing the driveway located on public property must be a minimum
termination. of 7 feet.
In addition, the following must be observed: M. The clearance under a veranda, porch, deck or balcony
A. The clearance above grade must be a minimum of 12". must be a minimum of 12 inches. (B. also)
B. The clearance to a window or door that may be opened Note: The clearance to vegetation and other exterior
must be a minimum of 48"to the side and 48" below the combustibles such as mulch is 36" as measured from
window/door, and 12" above the window/door. (with the center of the outlet or cap.This 36"radius continues
outside air installed, 12" to side and below) to grade.
C. A 12" clearance to a permanently closed window is Certain Canadian and or Local codes or regulations may
recommended to prevent condensation on the window. require different clearances.
D. The vertical clearance to a ventilated soffit located above A vent shall not terminate directly above a side-walk or
the terminal within a horizontal distance of 2 feet(60 cm) paved driveway which is located between two single family
from the center-line of the terminal must be a minimum dwellings and serves both dwellings.
of 18". Only permitted if veranda, porch, deck, or balcony is fully
E. The clearance to an unventilated soffit must be a open on a minimum of 2 sides beneath the floor.
minimum of 12". See NFPA 211 for more installation clearance reductions
F. The clearance to an outside corner is 11"from center of when using outside air. Where passage through a wall,
pipe or partition of combustible construction is desired,
the installation shall conform to CAN/CSA-B365. (if in
G. The clearance to an inside corner is 12". Canada)
H. A vent must not be installed within 3 feet(90 cm)above
a gas meter/regulator assembly when measured from
the horizontal center-line of the regulator.
15 Harman® • P-Series Installation Manual_R4 • 2018- • 04/21 8390-0441
•
B. Clearances to Combustibles Place the stove away from combustible walls at least as far
When selecting a location for the appliance it is important to as shown in Figure 3.2. Please note the difference in side
consider the required clearances to walls, Figure 3.2. wall clearance with and without side shields.
Note that the clearances shown are minimum for safety but do
A WARNING not leave much room for access when cleaning or servicing.
Please take this into account when placing the stove.
RISK OF FIRE OR BURNS! Provide adequate Due to high temperatures, the stove should be placed out of
clearance around air openings and for service traffic and away from furniture and draperies.
access. Due to high temperatures, the appliance should Children and adults should be alerted to the hazards of high
be located out of traffic and away from furniture and surface temperatures and should stay away to avoid burns
draperies. to skin and/or clothing.
Young children should be carefully supervised when they are
ACAUTION in the same room as the stove.
Clothing and other flammable materials should not be placed
THIS APPLIANCE MUST BE VENTED TO THE OUTSIDE. on or near this unit.
NOTICE:Illustrations reflect typical installations and are FOR
DESIGN PURPOSES ONLY.Actual installation may vary due
to individual design preference.
P61-C & P68-C Freestanding Pellet Stove P43-C Freestanding Pellet Stove
14"(355mm) with 2"(51mm) *10"(254mm) with 2"(51mm)
side shields / \ ? side shields 0
20"(508mm) *16"(406mm)
without side shields o 14"(355mm) without side shields Limmdim_io *10"(254mm)
20"(508mm) *16"(406mm)
36"(914mm) 36"(914mm)
9"(228mm)- 9"(228mm)
13"(330mm)
o i o 0
•\1,
co
-- fp N
co co
N,
9"(228mm)With Side Shields 3
13"(330mm) Without Side Shields 9"(228mm) With or Without Side Shields
Figure 3.2
9 Harman® • P-Series Installation Manual_R4 • 2018- • 04/21 8390-0441
C. Floor Protection Corner Installation:
Parallel Installation: Minimum size floor protection for a corner installation hearth
pad is:
Place the stove on a noncombustible type floor or floor P43-C - Minimum size floor protection is 25-7/16" Wide by
protector that extends a minimum of 6 inches (152mm) to 26-3/4" Deep (646mm X 680mm).
the front of the load door opening, 6 inches (152mm)to the
sides of the door opening, and 6 inches to the rear. P61-C - Minimum size floor protection is 25-1/8" Wide by
The P-Series does not require R value floor protection. 27-3/4" Deep (638mm X 705mm).
The minimum floor protector material is 20 gauge sheet metal. P68-C - Minimum size floor protection is 25-3/16" Wide by
Other floor protector materials that can be used include Type 27-3/4" Deep (640mm X 705mm).
I hearth pads, ceramic tile, stone, brick, etc. Figure 3.3 Note: Floor protector WILL NOT touch the wall using
*Floor protection dimensions for the front and sides are minimum clearances.
measured from the appliance door opening in The United If corner floor protection is desired to touch the wall, the
States. In Canada,the side dimension is measured from the floor protection will need to be at least 40" x 40" (1016mm
widest part of the appliance. x 1016mm). Note: This will allow the floor protection to
P43-C - Minimum size rectangular floor protection is 25- touch the wall as shown. Figure 3.4.
7/16"Wide by 26-3/4" Deep (646mm X 680mm). Alternate floor protector dimension may be used as long as
P61-C-Minimum size rectangular floor protection is 25-1/8" they satisfy the measurement requirements shown below.
Wide by 27-3/4" Deep (638mm X 705mm).
P68-C - Minimum size rectangular floor protection is 25-
3/16"Wide by 27-3/4" Deep (640mm X 705mm).
Venting:
US-Follow PL vent manufacturers recommendations when
configuring vent pipe installation.
Canada - Must extend 2" (51mm) beyond each side of any
horizontal flue pipe.
4Ij; I
0 0
L
0
111111 Figure 3.4
D. Mobile Home Installation
When installing this unit in a mobile home, several
requirements must be followed:
J Floor Protector 1. The unit must be bolted to the floor. This can be done
K using an appropriate fastener for the application.
Figure 3.3 2. The unit must also be connected to outside air. See
"Termination Location and Vent Information" Section D.
Floor Protection 3. Floor protection and clearances must be followed as
Requirements 01 Canada
shown.
J Sides 6" 152mm 4. The appliance must be properly grounded to the frame of
K Front 6" 152mm the mobile home using a minimum of 8 AWG copper solid
L Rear 6" 152mm or stranded, insulated or bare wire or equivalent.
10 Harman® • P-Series Installation Manual R4 • 2018- • 04/21 8390-0441