7_LFC_Existing_MATERIALS.xlsxMR Prerequisite: Waste Performance
Required Documentation
Municipal solid waste generated (Metric tonnes per year)
Total population of the city or community
Per capita municipal solid waste generation
Total municipal waste diversion data (Metric tonnes per year)
Municipal solid waste diverted (% diverted)
Upload: Municipal solid waste report
Municipal solid waste report listing sector-wise waste generated and waste diverted
Upload: Per capita waste calculations
Calculations for per capita waste generated and waste diversion percentage
Upload: Solid waste management plan
Solid waste management plan addressing prerequisite requirements
Special Circumstances (Optional)
Upload: Narrative
Upload : Special circumstances (Optional)
Provide any additional documentation that supports the claim to special circumstances.
1873
28451
6.58324839197216E-02
1016
0.542445274959957
Year
2019
Year
2019
Year
2019
PRELIMINARY REVIEW
Document Name / Website
Northampton 2019 Waste.xlsx
Northampton 2019 Waste.xlsx
waste narrative letter
For documents larger than 10 pages, specify page nos. for review.
FINAL REVIEW
Use this section for credits that are marked as 'Under Review' in preliminary review.
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.
MR Prerequisite: Solid Waste Management
Required Documentation
Yes
No
Access
Select case as applicable to the city:
Case 1. Waste Management Services
Upload: Declaration stating 100% coverage
Declaration from municipal official with authority for sanitation and/or waste management stating 100% coverage of all buildings with waste management services.
Case 2. Commitment to Waste Management Services
Upload: Roadmap
For cities which have not achieved a 100% coverage, provide a roadmap for achieving the same within 3 years of certification or at the time of LEED recertification.
Solid Waste Management Plan
Upload: Solid waste management plan
Solid waste management plan addressing prerequisite requirements
Upload: Waste management and diversion strategies
Documentation supporting waste management and waste diversion by contractors or sub-contractors
Upload:C&D waste diversion data
Data for construction and demolition waste diverted from infrastructure works
Provide a narrative describing strategies for C&D waste diversion
Special Circumstances (Optional)
Upload: Narrative
Upload : Special circumstances (Optional)
Provide any additional documentation that supports the claim to special circumstances.
PRELIMINARY REVIEW
Document Name / Website
waste narrative letter
For documents larger than 10 pages, specify page nos. for review.
FINAL REVIEW
Use this section for credits that are marked as 'Under Review' in preliminary review.
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.
MR Credit: Special Waste Streams Management
Required Documentation
Upload: Supporting data for total special waste generated and diverted
Documentation supporting the total waste generated and diverted for each of the special waste streams
Upload: Calculations
Calculations for waste diversion percentage
Provide a narrative describing strategies adopted for waste diversion for each of the special waste streams
Special Circumstances (Optional)
Upload: Narrative
Upload : Special circumstances (Optional)
Provide any additional documentation that supports the claim to special circumstances.
PRELIMINARY REVIEW
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.
FINAL REVIEW
Use this section for credits that are marked as 'Under Review' in preliminary review.
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.
MR Credit: Responsible Sourcing for Infrastructure
Required Documentation
Select any one option and complete the respective section:
No
No
Option 1. Purchase 20% by cost of permanently installed top three infrastructure materials
Upload: Product claims of point threshold
Documentation of product claims for credit requirements for the point threshold achieved
Upload: Achievement of point threshold
Calculations demonstrating achievement of point threshold
Provide a narrative describing sourcing and extraction strategies for the point threshold achieved.
Option 2. Purchase 40% by cost of permanently installed top five infrastructure materials
Upload: Product claims of point threshold
Documentation of product claims for credit requirements for the point threshold achieved
Upload: Achievement of point threshold
Calculations demonstrating achievement of point threshold
Provide a narrative describing sourcing and extraction strategies for the point threshold achieved.
Special Circumstances (Optional)
Upload: Narrative
Upload : Special circumstances (Optional)
Provide any additional documentation that supports the claim to special circumstances.
PRELIMINARY REVIEW
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.
FINAL REVIEW
Use this section for credits that are marked as 'Under Review' in preliminary review.
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.
MR Credit: Material Recovery
Required Documentation
Select any one option and complete the respective section:
No
No
Option 1. Extended Producer Responsibility
Upload: Extended Producer Responsibility
Extended producer responsibility policy
Option 2. Non-recyclable Waste Generation Reporting
Upload: Non-recyclable Waste Generation Reporting
Waste stream audit report, calculations on quantity (by weight or volume) of non-recyclable waste generated within the city, report top five major contributing waste producers in the
city.
Provide a narrative describing the top five major contributing producers and the measures identified for safe collection, storage, recycling/ reuse to take back product into the system.
Special Circumstances (Optional)
Upload: Narrative
Upload : Special circumstances (Optional)
Provide any additional documentation that supports the claim to special circumstances.
PRELIMINARY REVIEW
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.
FINAL REVIEW
Use this section for credits that are marked as 'Under Review' in preliminary review.
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.
MR Credit: Smart Waste Management Systems
Required Documentation
Total Waste Generated
Waste handled by smart systems
Percentage of waste handled by smart systems
Provide a narrative describing the smart waste management strategies and their specifications
Special Circumstances (Optional)
Upload: Narrative
Upload : Special circumstances (Optional)
Provide any additional documentation that supports the claim to special circumstances.
Unit
Unit
PRELIMINARY REVIEW
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.
FINAL REVIEW
Use this section for credits that are marked as 'Under Review' in preliminary review.
Document Name / Website
For documents larger than 10 pages, specify page nos. for review.