Loading...
25A-118 (6) 16 SHERMAN AVE COMMONWEALTH OF MASSACHUSETTS BP-2021-1847 Map:Block:Lot:25A-118- 001 CITY OF NORTHAMPTON Permit: Solar Build PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2021-1847 PERMISSION IS HEREBY GRANTED TO: Project# 2021 SOLAR SYSTEM Contractor: License: Est. Cost: 32742 VALLEY SOLAR LLC 115680 Const.Class: Exp.Date:04/09/2025 CAMPBELL GREGORY JAMES &CAPELLA NERINE Use Group: Owner: SHERWOOD Lot Size (sq.ft.) Zoning: URB Applicant: VALLEY SOLAR LLC Applicant Address Phone: Insurance: PO BOX 60627 (413)584-8844 WC531S62064701 I FLORENCE, MA 01062 ISSUED ON:09/10/2021 TO PERFORM THE FOLLOWING WORK: INSTALL 25 PANEL 8.25 KW ROOF MOUNT SOLAR SYSTEM POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: ) 52 . cfr)97r Fees Paid: $7.5.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner Department use only 4-71 ;�. City of Northampton Status of Permit: j Building Department Curb Cut/Driveway Permit r' i 212 Main Street Sewer/Septic Availability �� ' Room 100 Water/Well Availability Northampton, MA 01060 Two Sets of Structural Plans phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address This section to be completed by office Map 2''671. Lot it'? Unit 16 Sherman Avenue Northampton, MA 01060 Zone Overlay District Elm St. District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Gregory Campbell 16 Sherman Avenue, Northampton, MA 01060 Name(Print) _. Current Mailing Address. ,-^ (413)588-2130 " Telephone Signature 2.2 Authorized Agent: Valley Solar LLC PO Box 60627, Florence, MA 01062 Name(Print) Current Mailing Address 413-584-8844 Signature Telephone SECTION 3 -ESTIMATED CONSTRUCTION COSTS Item Estimated Cost (Dollars)to be Official Use Only completed by permit applicant 1. Building (a) Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from (6) 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total = (1 + 2 + 3 +4 + 5) S32,742 Check Number This Section For Official Use Only Building Permit Number: lia,P 1 ' 1 f 7 Date Issued: ! Q /' Signature: / f---- / �(0 26Z, Building Commissioner/Inspector of Buildings Date Ihasbrouck @ northamptonma.gov info valleysolar.solar EMAIL ADDRESS (REQUIRED; CONTRACTOR) [ ---! r M Department use only N�,f City of Northampton Status of Permit. o �v ��'�� �4' _ Building Department Curb Cut/Driveway Permit - ( : r -"�'i 212 Main Street Sewer/Septic Availability a '.® l Room 100 Water/Well Availability _, Northampton, MA 01060 Two Sets of Structural Plans i.9 phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify ( ,APPLICATION TO CONSTRUCT,ALTER, REPAIR. RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address. This section to be completed by office Map Z5A Lot 02 UnitUU t 16 Sherman Avenue Northampton, MA 01060 Zone LA2 e.�J Overlay District Elm St.District CB District SECTION 2 -PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Gregory Campbell 16 Sherman Avenue, Northampton, MA 01060 Name(Print) l Current Mailing Address: 58&2130 Telephone Signature /j 2.2 Authorized Agent: Valley Solar LLC PO Box 60627, Florence, MA 01062 Name(PrIpt) Current Mailing Address P a:t,i-C-,fz, 13. Rrrnd.tetz4, 413-584-8844 Signature Telephone SECTION 3 -ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building (a) Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from (6) 3. Plumbing Building Permit Fee .. co 4. Mechanical (HVAC) /5 5. Fire Protection 6. Total= (1 +2 + 3 +4+ 5) Check Number 1 5 7 This Section For Official Use Only �r) Zau -18�.--7 Date Building Permit Number: / Issued: Signature: Building Commissioner/Inspector of Buildings Date Ihasbrouck @ northamptonma.gov info C1 valleysolar.solar EMAIL ADDRESS (REQUIRED; CONTRACTOR) Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed I Required by Zoning This column to be tilled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage • °o Open Space Footage °ro (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO Q DON'T KNOW 0 YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DON'T KNOW O YES 0 IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained Date Issued: C. Do any signs exist on the property? YES O NO 0 IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES t NO 0 IF YES, describe size, type and location: E. Will the construction activity disturb (clearing, grading,excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO 0 IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House n Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors 0 Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [[] Siding[O] Other[X solar Brief Description of Proposed Work: Installation of 25 panel roof mounted solar array and 25 Enphase IQ7plus micro-inverters.System size 8.25kW DC. Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll - Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building : One Family _ Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION -TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Gregory Campbell , as Owner of the subject property hereby authorize Valley Solar LLC to act on my beha II matt s relative tg.wbrk authorized by this building permit application. 09/01/2021 Signature of Owner Date 1, Valley Solar LLC , as Cwwc/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Patrick D. Rondeau Print Name ertteLia.u, 09/01/2021 Signature of Owner/Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable 0 Name of License Holder Patrick D. Rondeau License Number CS-115680 Address Expiration Date '.o-ne:Letut, 4/9/2025 Signature Telephone 413-584-8844 9.Registered Home Improvement Contractor: Not Applicable 0 Company Name Registration Number Valley Solar LLC 186338 Address Expiration Date PO Box 60627, Florence, MA 01062 Telephone 413-584-8844 10/27/22 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes No ❑ The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations -- Lafayette City Center 2 Avenue de Lafayette, Boston, MA 02111-1750 wwx.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Valley Solar LLC Address: 340 Riverside Dr City/State/Zip: Florence, MA 01062 Phone #: 413-584-8844 Are you an employer? Check the appropriate box: 1' pe of project(required): 1.® I am a employer with 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition workingfor me in anycapacity. employees and have workers' p �' 9. ❑ Building addition [No workers' comp. insurance comp. insurance.+ required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.0 Other Solar comp. insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Liberty Mutual _ Policy#or Self-ins. Lic. #: WC531 S620647011 Expiration Date: 2/1/2022 Job Site Address: 16 Sherman Avenue City/State/Zip: Northampton, MA 01060 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of pedury that the information provided above is true and correct Signature: Pl-C'1'- Date: 07/07/2021 Phone#: 413-584-8844 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License # Issuing Authority(check one): 10Board of Health 2❑Building Department 30City/Town Clerk 4.12Electrical Inspector 50Plumbing Inspector 6.0Other Contact Person: Phone#: City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111 , S 150A. Address of the work: 16 Sherman Avenue, Northampton, MA 01060 The debris will be transported by: Valley Solar LLC The debris will be received by: Valley Recyling, Northampton Building permit number: Name of Permit Applicant Valley Solar LLC 9/3/2021 4,2015! Date Signature of Permit Applicant Wyssling Consulting ..e> z 76 North Meadowbrook Drive Alpine, UT 84004 Scott E. Wyssling, PE, PP. CME office (201) 874-3483 s wyssling@ wysslingconsulting.corn August 11, 2021 Ken Trappen Advanced Solar Solutions 39650 Mallard Bass Lake, CA 93604 Re: Engineering Services Campbell Residence 16 Sherman Avenue, Northampton MA 8.250 kW System Dear Mr. Trappen: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site VisitNerification Form prepared by Advanced Solar Solutions representative identifying specific site information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by Advanced Solar Solutions and will be utilized for approval and construction of the proposed system. 3. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of 2 x 6 dimensional lumber at 16" on center. The attic space is unfinished and photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be SPF #2 or better with standard construction components. The existing roofing material consists of composite asphalt shingles. Photos of the dwelling also indicate that there is a permanent foundation. A. Loading Criteria Used • 117 MPH wind loading based on ASCE 7-10 Exposure Category"C" at a slope of 30 degrees • 7 PSF = Dead Load roofing/framing Live Load = 20 PSF Snow Load =40 PSF • 3 PSF = Dead Load solar panels/mounting hardware Total Dead Load=10 PSF The above values are within acceptable limits of recognized industry standards for similar structures in accordance with the Massachusetts Uniform Construction Code (2015 IBC). Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. Page 2 of 2 B. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "SnapNrack Installation Manual', which can be found on the SnapNrack website (http://snapnrack.com/). If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. Maximum allowable pullout per lag screw is 235 lbs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for SPF #2 assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 '/2", is less than what is allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 '/2"with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts should be adequate with a sufficient factor of safety. 3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed no greater than 48"o/c. 4. Panel supports connections shall be staggered to distribute load to adjacent rafters. Based on the above evaluation, it is the opinion of this office that the standard installation will adequately support the additional loading imposed by the solar panels. This evaluation is in conformance with the Massachusetts Uniform Construction Code, current industry and standards, and based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. V truly yours, `-, ......9 0,.. ,,, :- , , . 4.. . ,,,..,, Scott E. Wyssli,. PE ...,,.., ` - MA License No.505! , ' ° / --es , "..- $ ".• WCONSULTIN4G40