Loading...
32C-328 6 SERVICE CTR RD BP-2022-0072 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 32C-328 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2022-0072 Project# JS-2022-000132 Est.Cost: $61740.00 Fee: $282.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: VALLEY SOLAR LLC 115680 Lot Size(sq.ft.): 13416.48 Owner: LANDERS JO Zoning:GB(101)/ Applicant: VALLEY SOLAR LLC AT: 6 SERVICE CTR RD Applicant Address: Phone: Insurance: PO BOX 60627 (413) 584-8844 WC FLORENCEMA01062 ISSUED ON:7/21/2021 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL 35 PANEL ROOF MOUNT SOLAR ARRAY - 15.05KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. 0 (► i � Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 7/21/2021 0:00:00 $282.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner Lio �F The Commonwealth of M s•' . setts <'7 c,0(.7Office of Public Safety and Inspe '' y Massachusetts State Building Code(780 , Building Permit Application for any Building other than a One-or ' ; D •llin: (This Section For Official Use Only) 44°' iokv Building Permit Number: [ Date Applied: Building Official: SECTION 1:LOCATION 6 Service Center Rd Northampton 01060 No.and Street Cig/Tt a Zip Code Name of Building(if applicable) Assessors Map# Block#and/or Lot # SECTION 2:PROPOSED WORK Edition of MA State Code used If New Construction check here 0 or check all that apply in the two rows below Existing Building 0 Repair 0 Alteration 0 Addition 0 Demolition 0 (Please fill out and submit Appendix 2) Change of Use 0 Change of Occupancy 0 Other 0 Specify:Solar Are building plans and/or construction documents being supplied as part of this permit application? Yes 0 No 0 Is an Independent Structural Engineering Peer Review required? Yes 0 No 0 Brief Description of Proposed Work: Instalaltion of 35 panel roof mounted Solar Array. System S17A 15.05kW DC Also installing an 18kWh Generac battery SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) 0 Existing Use Group(s): Business Proposed Use Group(s): SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) Total Area(sq.ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1 ❑ A-2 0 Nightclub 0 A-3 0 A-4 0 A-5 0 B: Business 0 E: Educational 0 F: Factory F-1 0 F2 0 H: High Hazard H-1 0 H-2 0 H-3 0 H-4 0 H-5 0 I: Institutional I-1 0 I-2❑ I-3❑ I-4❑ M: Mercantile 0 R: Residential R-10 R-2 0 R-3 0 R-4 0 S: Storage S-1 0 S-2 0 U: Utility 0 Special Use 0 and please describe below: Special Use Description: SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA 0 IB ❑ IIA 0 IIB 0 IIIA 0 IIIB 0 IV 0 VA 0 VB 0 SECTION 7:SITE INFORMATION(refer to 780 CMR 105.3 for details on each item) Trench Permit: Debris Removal: Water Supply: Flood Zone Information: Sewage Disposal: Licensed Disposal Site 0 Public 0 Check if outside Flood Zone 0 Indicate municipal 0 A trench will not be P Private 0 or indentify Zone: or on site system 0 required 0 or trench or specify: permit is enclosed 0 Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Process: Not Applicable 0 Is Structure within airport approach area? Is their review completed? or Consent to Build enclosed 0 Yes 0 or No 0 Yes 0 No 0 SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Group(s): Type of Construction: Does the building contain an Sprinkler System?: Special Stipulations: Design Occupant Load per Floor and Assembly space: SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner Jo Landers 6 Service Center Rd Northampton 01060 Name(Print) No.and Street City/Town Zip Property Owner Contact Information: Business Owner 413-296 -2702 - jo@jolanders.com Title Telephone No.(business) Telephone No. (cell) e-mail address If applicable,the property owner hereby authorizes: Valley Solar LLC 340 Riverside Drive Northampton MA 01060 Name Street Address City/Town State Zip to apply for and act on the property owner's behalf,in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 1) If a building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here 0. Otherwise provide construction control forms(see section 107 in the code)as required. 10.1 Registered Professional Responsible for Construction Control (the professional coordinating document submittals) Name(Registrant) Telephone No. e-mail address Registration Number MA Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor Valley Solar LLC Company Name Patrick Rondeau CS-115680 Name of Person Responsible for Construction License No. and Type if Applicable 340 Riverside Drive Northampton MA 01060 Street Address City/Town State Zip 413-584-RR44 - - Info@valleysolar.solar Telephone No.(business) Telephone No. (cell) e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§25C(6)) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes 0 No El SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor and Materials) Total Construction Cost(from Item 6)=$ 1.Building $ Building Permit Fee=Total Construction Cost x (Insert here 2.Electrical $ appropriate mu ' tor)=$ 3.Plumbing $ 4.Mechanical (HVAC) $ Note:Minimum fe =TI2 ntact municipality) 5.Mechanical (Other) $ Enclose check payable to 6.Total Cost $ 61740 (contact municipality)and write check number here 51 Z'7 SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Patrick Rondeau P - h- kerrytiA2Construction supervisor 413-584-8844 Please print and sign name Title Telephone No. Date 340 Riverside Dr Northampton MA 01060 Info@valleysolar.solar Street Address City/Town State Zip Email Address ' Municipal Inspector to fill out this section upon application approval: ; • i . , I" // i/01I Name ) Date