A-100_ BASEMENT & FOUNDATION PLAN Rev.3Rev Date Description
Project Title This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.Proposed Residence at
54 EMERSON WAY
Florence, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 11/01/2020 Progress Drawings
Sheet Title
Scale:
02/08/2021
JPB
JPB
20-024
AS NOTEDJODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comWINDOW REVISIONS - 2/8/2021
2 11/10/2020 60% - Progress drawings
3 12/08/2020 Foundation
4 1/4/2021 SK1 - Foundation Layout (revised)
5 1/19/2021 90% Pricing
6 1/27/2021 PERMITTING
7 2/8/2021 Window revisions
BASEMENT &
FOUNDATION PLAN
A-100
D-02D-03
D-01
furnace HWH
gas WDelectric
water
sanitary
tel/data
chase space,above6'-0"54'-0"11'-0"29'-0"14'-0"60'-0"
7'-0"8'-0"39'-0"6'-0"
7'-6"7'-6"12'-0"
7'-0"25'-0"7'-0"9'-0"10'-0"10'-0"±9'-0"8"7'-1"16'-6"11'-1"8"8"
15'-0"26'-0"19'-0"7'-0"EQ.EQ.6'-0"27'-0"EQ.EQ.3'-6"18'-0"7T@10" = 5'-10"BEAM POCKET
BEAM POCKET
BEAM POCKET
BEAM POCKET
18x32basement slider18x32basement slider
18x32basement slider
18x32
basement slider
PREFAB OR SITE BUILT
BASEMENT EGRESS
STAIR & METAL
BULKHEAD
8" REINFORCED CONC.
FOUNDATION WALL W/
20"X10" REINFORCED
CONC. FOOTING. TYPICAL.
2-1/2" THERMAX RIGID
INSULATION AT PERIMETER OF
BASEMENT, R-15.8.
4" CONCRETE SLAB,
TYP., W/ VAPOR
BARRIER & 8"-10"
GRAVEL BELOW
COORDINATE R.O. FOR OVERHEAD
GARAGE DOOR WITH
MANUFACTURER'S
RECOMMENDATIONS
COORD. R.O. FOR
EXTERIOR DOOR W/
MANUFACTURER'S
RECOMMENDATIONS
4" LALLY COLLUMN W/ CAP TO BEAM AND CAP TO CONCRETE ANCHORS. 24X24X12 REINFORCED CONCRETE FOOTING. TYPICAL.
6X6 PT. POST ON POST
BASE AT PORCH W/ 12"
CONC. SONOTUBE OR
PRE-FAB CONCRETE PIER.
TYPICAL OF (3).
LINE OF FRONT PORCH,
ABOVE
LVL BEAM BY ENGINEER
LVL BEAM BY ENGINEER LVL BEAM BY ENGINEER4" CONCRETE SLAB,
TYP., W/ VAPOR
BARRIER & 8"-10"
GRAVEL BELOW
UNEXCAVATED - SLAB ON GRADE AT GARAGE
SLOPE TOWARD OVER HEAD DOORS, 1/8" PER 12" MIN.
BEAM POCKET
UP
14'-0"13'-0"18x32basement sliderLINE OF BAY WINDOW, ABOVE7'-0"7'-8"11'-11"11'-7"
10'-4"10'-4"11'-11"11'-7"7'-6"
2 1/2"3'-2 1/2"3 1/2"7'-9 1/2"3'-6 3/4"
2x BEAM BY ENGINEER
2x LEDGER BY ENGINEER
12'-0"4'-10"3'-6"8"8"10'-11 1/4"3 1/2"10'-0"3 1/2"10'-11 1/4"3 1/2"UNFINISHED BASEMENT
001
STORAGE
002
6"6"3'-5 3/4"21'-0"LAUNDRY
003
BASEMENT & FOUNDATION PLAN
Scale: 1/4" = 1'-0"1
0 5 10 FT
area: ±1,728 SF