Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Sanitary Sewer CO - Full Breakdown-10.02.2017-1
GEORGE CAIRNS & SONS, INC. PROJECT: City of Northampton, Northampton Drainage Relocation DESCRIPTION OF WORK:CO #3 S:\All Projects\1707 Northampton MA Drainage\Change Orders\CO #3 - Sewer Install\[Sewer CO.xls]DMH5 Description Quantity UM Labor Cost Material Cost Equipment Cost Subcontractor Cost Total Cost Mark-Up Unit Cost Total Price Asphalt Sawcutting 500 LF 2.88$ 1.30$ 2,090.00$ 0.63$ 4.81$ $2,403.50 Pipe In Street - 1.25" SDR 11 -$ Installation 180 LF 23.18$ 13.71$ 6,640.20$ 5.53$ 42.42$ $7,636.23 1.25" Pipe 180 LF 4.22$ 759.60$ 0.63$ 4.85$ $873.54 Bedding 180 LF 9.00$ 1,620.00$ 1.35$ 10.35$ $1,863.00 Rigid Insulation 40 LF 5.43$ 217.20$ 0.81$ 6.24$ $249.78 Pump/Grinder Station -$ E-One System Complete 1 LS 7,647.06$ 7,647.06$ 1,147.06$ 8,794.12$ $8,794.12 2" Vent Pipe 56 LF 23.56$ 5.40$ 1,621.76$ 4.34$ 33.30$ $1,865.02 2" PVC 40 LF 2.50$ 100.00$ 0.38$ 2.88$ $115.00 2" Cast Iron 16 LF 15.00$ 240.00$ 2.25$ 17.25$ $276.00 Installation of E-One 1 LS 3,113.15$ 1,682.00$ 4,795.15$ 719.27$ 5,514.42$ $5,514.42 Electrician - ALLOWANCE ONLY 1 LS 5,000.00$ 5,000.00$ 250.00$ 5,250.00$ $5,250.00 E-One Pump Station Manhole Structure 1 UNIT 750.00$ 750.00$ 112.50$ 862.50$ $862.50 F&C 1 UNIT 715.00$ 715.00$ 107.25$ 822.25$ $822.25 Brick & Mortar 1 LS 50.00$ 50.00$ 7.50$ 57.50$ $57.50 Barrel Block 1 LS 150.00$ 150.00$ 22.50$ 172.50$ $172.50 Ex. Sewer Manhole Removal -$ Removal 1 EACH 1,278.50$ 375.00$ 1,653.50$ 248.03$ 1,901.53$ $1,901.53 Disposal 1 LS 150.00$ 150.00$ 22.50$ 172.50$ $172.50 Abandon Ex. Pipes 2 EACH 50.00$ 100.00$ 7.50$ 57.50$ $115.00 New SMH - Holyoke Street -$ Installation 1 UNIT 1,920.40$ 986.61$ 2,907.01$ 436.05$ 3,343.06$ $3,343.06 Structure 1 UNIT 400.00$ 400.00$ 60.00$ 460.00$ $460.00 F&C 1 UNIT 755.00$ 755.00$ 113.25$ 868.25$ $868.25 Brick & Mortar 1 LS 50.00$ 50.00$ 7.50$ 57.50$ $57.50 Dense Graded Crushed Stone Place Stone @ 12" Thickness 55 CY 28.51$ 9.22$ 2,075.15$ 5.66$ 43.39$ $2,386.42 Stone Crushed 1 1/2" 55 CY 34.75$ 1,911.25$ 5.21$ 39.96$ $2,197.94 Street Patch Work 4" Thick 36 TON 140.00$ 75.00$ 7,740.00$ 32.25$ 247.25$ $8,901.00 Testing 1 LS 750.00$ 500.00$ 250.00$ 1,500.00$ 225.00$ 1,725.00$ $1,725.00 Test Pit Sewer & Water 1 LS 1,611.54$ 476.00$ 2,087.54$ 313.13$ 2,400.67$ $2,400.67 Temporary Sanitary Facility 3 WK 125.00$ 375.00$ 18.75$ 143.75$ $431.25 Total: $61,715.48 Rounded Total:61,715.00$ Sewer Pump Station & Grinder - 19 Holyoke Street Full Pricing Breakdown