Fierst (Dan) 4 (Permit Set)7'-6 3/4"5'-0 1/4"12'-3 1/4"1'-11 3/4"
6'-8"
6'-5 1/4"
3'-10 1/4"
9'-2"
2'-0"12'-0"18'-6"2'-4 3/8"
22'-0"7'-2 1/4"3'-3"133.61°1'-2 1/4"5'-5"5'-0 1/2"3'-0"1'-7"2'-6 1/2"2'-9 1/2"
2'-0 1/2"
2
A.1
1'-0 1/2"3
A.1
7'-2"3'-5 1/2"10'-5 1/4"13'-5 3/4"
In wall
heating
system
Waste pipe
to be
reworked
Verify
window
location
Demo ceiling
furring and
reinsulate
ceiling as
required
7'-6 1/4"14'-5 1/2"Existing
plumbing
location
Remove
raised
floor
Open to below
Bedroom 1
Studio
Bath 1
Bedroom 2
Bath 2
Bedrom 3
9'-6 1/8"
4 1/2"
3'-0 1/2"
4 1/2"
5'-0 1/2"
4 1/2"
5'-0 1/4"2'-6 1/2"
2'-0"10'-10 1/4"7'-2"5'-1 1/4"1'-11 3/4"
4 1/2"
6'-5 1/4"
4 1/2"
19'-0 3/4"
Salvage toilet
Teagno Construction Inc.24x36(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
5/19/2021 9:46:43 AM1/4" = 1'-0"
Existing
A.1
2021-05-19
Permit Set
21-019
Dan &
Naomi Fierst
30 Hawthorne
Terrace
Northampton
Description Date
1/4" = 1'-0"1 Level 2 Existing
1/4" = 1'-0"2 Existing EW Section
1/4" = 1'-0"3 Existing NW Section
10'-0 3/4"4'-6 1/4"
Ikea Pax Ikea Pax
Pitched floor
Trough drain -
location TBD on
site
2"Infill wood
flooring with
salvaged floor
4'-7 5/8"4'-11 3/8"2'-6 1/2"3'-4 1/4"7'-5 1/8"2'-2"Solatube 14" dia.
Location TBD on site 12'-9 7/8"14'-5 1/2"19'-0 3/4"
Undershelf LED
lighting
A.2
11
12
Ikea Pax
Switched wall vent.
LED night with
occupancy sensor
under shelf Undershelf LED lightingRelocated
plumbing vent
(approx.)
New walls
Relocated mini-
split from first
floor.
Install approx.
54" to top
Solatube 14" dia.
Insulate all walls
for sound
Uplight LED strip on
existing upper beam
Along all wall
Uplight LED strip on
existing upper beam
Along all wall
Central light in space -TBD
To light brick and window walls
Open to below
Electric heated
tiled floor
Relocate washing machine and dryer
from basement (existing) to new next
to existing sink in room behind garage
Bedroom 4
Bedrom 3
Bath 2
Bedroom 2
Bedroom 1 Bath 1
S
S/CO
S/CO
S
S
S
Upgrade smoke / CO devices to
comply with current code and verify
interconnect with existing
Wall wash
Location TBD on site
Verify 3 way location
for hall light and
install if needed
Install new
propane line for
FUTURE gas
fireplace
TA.26
9
7
8
Pitched floor
Trough drain
5'-1 1/4"1'-1 3/4"3'-1 3/4"2'-6 1/2"3'-4 1/4"7'-5 1/8"2'-2"5'-4 3/8"5 1/4"7'-5 3/4"
13'-3 3/8"
Solatube 14"
dia. center on
door opening
Undershelf LED lighting1'-9"1'-9"
Relocated
plumbing vent
(approx.)
3'-8 7/8"8"1'-3 3/4"1'-10"4 1/2"3'-11 1/2"
7'-5 3/4"
7'-0 1/2"
Location TBD
Ceiling break line
1'-3 3/4"1'-4"3'-0"Glass wall
Half wall
with glass
above
3'-9 5/8"1'-3 3/4"5 3/8"
Drain locations approx. -
to be determined on site
vent Undershelf LEDTWall wash
Location TBD on site 1'-1 1/4"2'-8"1'-0"1'-10 1/4"1'-1 3/4"6'-8"2'-10"4'-9 1/2"4'-1 3/4"3'-0"
Door panel to
match
existing -6
panel painted
7'-5 3/4"7'-2 1/4"7'-2 1/4"Hydronic
towel warmer
/ heater
6 1/4"5'-9 1/8"3'-10"3'-4 1/4"
4 7/8"
3'-0 1/2"4 1/2"7'-2 1/4"7'-0"New 2x6 floor system on existing subfloor7"5'-6"9'-10"3'-8 3/4"6 1/2"7'-5 3/4"5'-9 5/8"
5'-2 3/4"2'-3"2'-7 7/8"3'-1 3/4"
Ikea Pax Ikea Pax7'-2 1/4"7'-2 1/4"Outlet
x2 in
med
cab
Outlet
x2 in
med
cab 2'-8"8"4"3'-0"6'-8"Height of countertop to be determend by owner on site.
Half wall height to match
Solid surface wall cap & backsplash to match countertop
7"1'-1 1/4"Teagno Construction Inc.24x36(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
5/19/2021 9:46:48 AMAs indicated
Proposed
A.2
2021-05-19
Permit Set
21-019
Dan &
Naomi Fierst
30 Hawthorne
Terrace
Northampton
Description Date
1/4" = 1'-0"1 Level 2 Proposed
2 2nd Floor 3D 1
3 2nd Floor 3D 2
4 2nd Floor 3D 4
1/2" = 1'-0"5 Level 2 Proposed Bathroom
1/2" = 1'-0"7 Proposed N Bath Elevation
1/2" = 1'-0"8 Proposed E Bath Elevation
1/2" = 1'-0"6 Proposed S Bath Elevation
1/2" = 1'-0"9 Proposed W Bath Elevation
1/4" = 1'-0"11 Closet 1
1/4" = 1'-0"12 Closet 2