Loading...
Fierst (Dan) 4 (Permit Set)7'-6 3/4"5'-0 1/4"12'-3 1/4"1'-11 3/4" 6'-8" 6'-5 1/4" 3'-10 1/4" 9'-2" 2'-0"12'-0"18'-6"2'-4 3/8" 22'-0"7'-2 1/4"3'-3"133.61°1'-2 1/4"5'-5"5'-0 1/2"3'-0"1'-7"2'-6 1/2"2'-9 1/2" 2'-0 1/2" 2 A.1 1'-0 1/2"3 A.1 7'-2"3'-5 1/2"10'-5 1/4"13'-5 3/4" In wall heating system Waste pipe to be reworked Verify window location Demo ceiling furring and reinsulate ceiling as required 7'-6 1/4"14'-5 1/2"Existing plumbing location Remove raised floor Open to below Bedroom 1 Studio Bath 1 Bedroom 2 Bath 2 Bedrom 3 9'-6 1/8" 4 1/2" 3'-0 1/2" 4 1/2" 5'-0 1/2" 4 1/2" 5'-0 1/4"2'-6 1/2" 2'-0"10'-10 1/4"7'-2"5'-1 1/4"1'-11 3/4" 4 1/2" 6'-5 1/4" 4 1/2" 19'-0 3/4" Salvage toilet Teagno Construction Inc.24x36(413) 549-0803 design@teagnoconstruction.comTitlePageScale: TEAGNO CONSTRUCTION INC. Revisions 5/19/2021 9:46:43 AM1/4" = 1'-0" Existing A.1 2021-05-19 Permit Set 21-019 Dan & Naomi Fierst 30 Hawthorne Terrace Northampton Description Date 1/4" = 1'-0"1 Level 2 Existing 1/4" = 1'-0"2 Existing EW Section 1/4" = 1'-0"3 Existing NW Section 10'-0 3/4"4'-6 1/4" Ikea Pax Ikea Pax Pitched floor Trough drain - location TBD on site 2"Infill wood flooring with salvaged floor 4'-7 5/8"4'-11 3/8"2'-6 1/2"3'-4 1/4"7'-5 1/8"2'-2"Solatube 14" dia. Location TBD on site 12'-9 7/8"14'-5 1/2"19'-0 3/4" Undershelf LED lighting A.2 11 12 Ikea Pax Switched wall vent. LED night with occupancy sensor under shelf Undershelf LED lightingRelocated plumbing vent (approx.) New walls Relocated mini- split from first floor. Install approx. 54" to top Solatube 14" dia. Insulate all walls for sound Uplight LED strip on existing upper beam Along all wall Uplight LED strip on existing upper beam Along all wall Central light in space -TBD To light brick and window walls Open to below Electric heated tiled floor Relocate washing machine and dryer from basement (existing) to new next to existing sink in room behind garage Bedroom 4 Bedrom 3 Bath 2 Bedroom 2 Bedroom 1 Bath 1 S S/CO S/CO S S S Upgrade smoke / CO devices to comply with current code and verify interconnect with existing Wall wash Location TBD on site Verify 3 way location for hall light and install if needed Install new propane line for FUTURE gas fireplace TA.26 9 7 8 Pitched floor Trough drain 5'-1 1/4"1'-1 3/4"3'-1 3/4"2'-6 1/2"3'-4 1/4"7'-5 1/8"2'-2"5'-4 3/8"5 1/4"7'-5 3/4" 13'-3 3/8" Solatube 14" dia. center on door opening Undershelf LED lighting1'-9"1'-9" Relocated plumbing vent (approx.) 3'-8 7/8"8"1'-3 3/4"1'-10"4 1/2"3'-11 1/2" 7'-5 3/4" 7'-0 1/2" Location TBD Ceiling break line 1'-3 3/4"1'-4"3'-0"Glass wall Half wall with glass above 3'-9 5/8"1'-3 3/4"5 3/8" Drain locations approx. - to be determined on site vent Undershelf LEDTWall wash Location TBD on site 1'-1 1/4"2'-8"1'-0"1'-10 1/4"1'-1 3/4"6'-8"2'-10"4'-9 1/2"4'-1 3/4"3'-0" Door panel to match existing -6 panel painted 7'-5 3/4"7'-2 1/4"7'-2 1/4"Hydronic towel warmer / heater 6 1/4"5'-9 1/8"3'-10"3'-4 1/4" 4 7/8" 3'-0 1/2"4 1/2"7'-2 1/4"7'-0"New 2x6 floor system on existing subfloor7"5'-6"9'-10"3'-8 3/4"6 1/2"7'-5 3/4"5'-9 5/8" 5'-2 3/4"2'-3"2'-7 7/8"3'-1 3/4" Ikea Pax Ikea Pax7'-2 1/4"7'-2 1/4"Outlet x2 in med cab Outlet x2 in med cab 2'-8"8"4"3'-0"6'-8"Height of countertop to be determend by owner on site. Half wall height to match Solid surface wall cap & backsplash to match countertop 7"1'-1 1/4"Teagno Construction Inc.24x36(413) 549-0803 design@teagnoconstruction.comTitlePageScale: TEAGNO CONSTRUCTION INC. Revisions 5/19/2021 9:46:48 AMAs indicated Proposed A.2 2021-05-19 Permit Set 21-019 Dan & Naomi Fierst 30 Hawthorne Terrace Northampton Description Date 1/4" = 1'-0"1 Level 2 Proposed 2 2nd Floor 3D 1 3 2nd Floor 3D 2 4 2nd Floor 3D 4 1/2" = 1'-0"5 Level 2 Proposed Bathroom 1/2" = 1'-0"7 Proposed N Bath Elevation 1/2" = 1'-0"8 Proposed E Bath Elevation 1/2" = 1'-0"6 Proposed S Bath Elevation 1/2" = 1'-0"9 Proposed W Bath Elevation 1/4" = 1'-0"11 Closet 1 1/4" = 1'-0"12 Closet 2