Loading...
2021-05-06 Higgins Way Field Report1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 1 of 7 F:\P2009\1145\C71\Construction Administration\CA Reports Higgins Way Project Closeout Observation Log Project Name:Higgins Way Project Closeout Submitted to:Carolyn Misch Inspection Date:05/06/2021 Project Address: Higgins Way F&O Project #:2009.1145.C71 Town: Northampton State: MA Photos Included:6 photos Client:City of Northampton Field Notes: Date/Inspector/Time:05/06/2021 / Matt Taylor / 12:45-2:00 pm Weather: 65◦ F and Cloudy General Notes: Matt Taylor of Fuss & O’Neill performed a site visit to observe construction progress. Site Notes: Keiter Builders (KB) on site at time of visit o KB plans on continuing installation of islands o Installation of sidewalk mostly complete, with panels at Lot #6 driveway remaining o Stockpile of materials near lot #6 removed and slope graded o Permeable paver installed in area to the west; south parking area pavers & jointing material to be placed next week Stone swale installed adjacent to access path in northeast of project area Residents came out to discuss flooding of north parking areas and alternative materials to finish. Also inquired on infiltration system. Activities North traffic island installation underway at time of visit o Manhole near infiltration unit uncovered; buried under 3-4” of material Bucket discovered plugging outlet pipe Bucket has been removed 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 2 of 7 F:\P2009\1145\C71\Construction Administration\CA Reports Site Photographs: Photo 1: Bucket lodged in outlet pipe of manhole east of infiltration system 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 3 of 7 F:\P2009\1145\C71\Construction Administration\CA Reports Photo 2: Eastern parking area with permeable pavers 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 4 of 7 F:\P2009\1145\C71\Construction Administration\CA Reports Photo 3: Stone swale installed adjacent to access path 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 5 of 7 F:\P2009\1145\C71\Construction Administration\CA Reports Photo 4: South traffic island installed 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 6 of 7 F:\P2009\1145\C71\Construction Administration\CA Reports Photo 5: North traffic island being installed 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 7 of 7 F:\P2009\1145\C71\Construction Administration\CA Reports Photo 6: Panel in front of Lot 6 driveway unpoured