Loading...
2021-04-23 Higgins Way Field Report1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 1 of 5 F:\P2009\1145\C71\Construction Administration\CA Reports Higgins Way Project Closeout Observation Log Project Name:Higgins Way Project Closeout Submitted to:Carolyn Misch Inspection Date:04/23/2021 Project Address: Higgins Way F&O Project #:2009.1145.C71 Town: Northampton State: MA Photos Included:4 photos Client:City of Northampton Field Notes: Date/Inspector/Time:04/23/2021 / Matt Taylor / 3:00-3:45 am Weather: 65◦ F and Sunny General Notes: Matt Taylor of Fuss & O’Neill performed a site visit to observe construction progress. Site Notes: Keiter Builders (KB) on site at time of visit o KB plans on continuing installation of sidewalk next week, o Install of southern traffic island tentatively planned for next Tuesday o Discussed filter strip at failing pavement edge Site Features: Over half of the panels have been poured Removal of stockpiled material near basin complete Regrading of South western trail. Awaiting install of water bars 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 2 of 5 F:\P2009\1145\C71\Construction Administration\CA Reports Site Photographs: Photo 1: Regraded at south western corner of project 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 3 of 5 F:\P2009\1145\C71\Construction Administration\CA Reports Photo 2: Sidewalk install looking south.toward Ford Crossing 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 4 of 5 F:\P2009\1145\C71\Construction Administration\CA Reports Photo 3: Sidewalk install looking east along north side of Higgins Way 1550 Main Street, Suite 400 Springfield, MA 01103 Field Report Page 5 of 5 F:\P2009\1145\C71\Construction Administration\CA Reports Photo 4: Sidewalk install looking westvalong north side of Higgins Way