Loading...
90 Conz Units #1 and #2Rev Date Description Project Title This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.Proposed Renovations to SUITE #1 & #2 90 Conz Street Northampton, Massachusetts for LEARNING SOLUTIONS, LLC Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 11/16/2020 Existing Sheet Title Scale: 03/02/2021 JPB JPB 20-026 AS NOTEDJODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comPERMIT - 03/02/2021 2 03/02/2021 PERMIT SET REST RM. REST RM. ELEC PANELTEL/DATA PANELSexisting clerestory PROPOSED DEMO PLAN - UNITS #1 & #2 Scale: 1/4" = 1'-0"1 0 5 10 15 FT EXAM ROOM EXAM ROOM EXAM ROOM EXAM ROOM EXAM ROOM WAITING RECEPTIONIST STORAGE OFFICE / RECEPTION 2ND FLOOR EGRESS STAIR OFFICE OFFICEOFFICE MECH. RM. REST RM. REST RM.MECH. RM.STORAGE MAIN LOBBY & STAIRS beam, abovebeam, above8'10 1/2" ceiling 8'10 1/2" ceiling Demo sink cabinet. Cap plumbing. Demo sink cabinet. Cap plumbing. EXAM ROOM Demo sink cabinet. Cap plumbing. Demo sink cabinet. Cap plumbing. Demo sink cabinet. Cap plumbing. Demo wall & assoc. materials. Demo wall for new door. Remove door. Demo restrooms, storage closet, & associated materials. Cap unused or to be modified plumbing in restrooms. Relocate (1) 2x4 light fixture in new closet space. Relocate (1) HVAC ceiling register to Waiting Area. Salvage (1) 2x4 light fixture for re-use. Remove existing door at rest rooms & mechanical room. Install new solid core door w/ lever hardware and closer in existing openings. Demo existing kitchenette cabinets. Remove existing toilet & vanity at rest rooms. Install new in existing location. Demo pocket door. Demo pocket door. Demo counter. DEMOLITION PLAN A-1 REST RM. REST RM. ELEC PANELTEL/DATA PANELSexisting clerestory 3'x10' table FLOOR PLAN, UNITS #1 & #2 - Proposed Renovations Scale: 1/4" = 1'-0"1 0 5 10 15 FT TEST ROOM WAITING RECEPTIONIST STORAGE CONFERENCE ROOM 2ND FLOOR EGRESS STAIR OFFICE OFFICEOFFICE MECH. RM.MECH. RM.MAIN LOBBY & STAIRS ±20'-1 1/2"±9'-11 1/2"beam, abovebeam, above7'3" ceiling8'10 1/2" ceiling 8'10 1/2" ceiling 8'10 1/2" ceiling 8'10 1/2" ceiling 8'10 1/2" ceiling 8'10 1/2" ceiling 8'10 1/2" ceiling 8'10 1/2" ceiling 8'10 1/2" ceiling 8'0" ceiling 8'0" ceiling 8'0" ceiling New wall - 2x4@16" OC w/ 5/8" GWB ea. side. Align w/ existing beam, above. Install 3" mineral wool soundproofing.New 3'0"x6'8" door in ex. opening.TEST ROOM TEST ROOM TEST ROOM TEST ROOM TEST ROOM New 3'0"x6'8" door.Remove door, frame to remain. New wall - 2x4@16" OC w/ 5/8" GWB ea. side. Align w/ existing wall. Install 3" mineral wool sound proofing.CLOSET5'-0"clear, finished4 3/4"±4'-11 3/4"1'-6" align alignSTORAGENEW BATHROOM - Install new w/ 42" long x 1-1/2" OD grab bars. Install new wall-hung sink. New 3'0"x6'8" door w/ lever privacy hardware & door closer. New 2'6"x6'8" door & frame w/ storage lockset. New door & frame in ex. opening.1'-6"1'-6" Note: modify ceiling as req'd. by new construction at Conference Rm. Modify lighting and HVAC. New 4'0"x6'8" bi-fold door.New 3'0"x6'8" door & frame. Lever privacy lockset w/ closer.New plastic laminate countertop at reception. New solid wood door in ex. frame. Lever storage lockset w/ closer. New solid wood door in ex. frame. Lever privacy lockset w/ closer. New solid wood door in ex. frame. Lever privacy lockset w/ closer. Install new toilet & vanity in ex. location in each ex. restroom.New 3'0"x6'8" solid core door w/ classroom lever lockset. Patch wall at former pocket door opening. New 3'0"x6'8" solid core door w/ classroom lever lockset. Patch wall at former pocket door opening. General Notes: New flooring (carpet or carpet tile, TBD) in all hallways, Testing Rooms, Offices, Receptionist & Conference Room. New VCT flooring in all Bathrooms. New primed & painted walls, all spaces. New LED lamps in all existing lighting fixtures to remain. align Repair / reset glazing at existing storefront Existing door to remain. Adjust / rehang in frame. Install new Owner provide kitchentte cabinets. Rev Date Description Project Title This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.Proposed Renovations to SUITE #1 & #2 90 Conz Street Northampton, Massachusetts for LEARNING SOLUTIONS, LLC Issue Date: Drawn By: Checked By: Project ID: Drawing No. Project North 1 11/16/2020 Existing Sheet Title Scale: 03/02/2021 JPB JPB 20-026 AS NOTEDJODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comPERMIT - 03/02/2021 2 03/02/2021 PERMIT SET PROPOSED PLAN A-2