90 Conz Units #1 and #2Rev Date Description
Project Title This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.Proposed Renovations to
SUITE #1 & #2
90 Conz Street
Northampton, Massachusetts
for
LEARNING SOLUTIONS,
LLC
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 11/16/2020 Existing
Sheet Title
Scale:
03/02/2021
JPB
JPB
20-026
AS NOTEDJODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comPERMIT - 03/02/2021
2 03/02/2021 PERMIT SET
REST RM.
REST RM.
ELEC PANELTEL/DATA PANELSexisting clerestory
PROPOSED DEMO PLAN - UNITS #1 & #2
Scale: 1/4" = 1'-0"1
0 5 10 15 FT
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
WAITING
RECEPTIONIST
STORAGE
OFFICE / RECEPTION
2ND FLOOR EGRESS STAIR
OFFICE
OFFICEOFFICE
MECH. RM.
REST RM.
REST RM.MECH. RM.STORAGE
MAIN LOBBY & STAIRS beam, abovebeam, above8'10 1/2" ceiling
8'10 1/2" ceiling
Demo sink cabinet. Cap
plumbing.
Demo sink cabinet. Cap
plumbing.
EXAM ROOM
Demo sink cabinet. Cap
plumbing.
Demo sink
cabinet. Cap
plumbing.
Demo sink cabinet. Cap
plumbing.
Demo wall & assoc. materials.
Demo wall for new door.
Remove door.
Demo restrooms, storage closet, & associated materials.
Cap unused or to be modified plumbing in restrooms.
Relocate (1) 2x4 light fixture in new closet space.
Relocate (1) HVAC ceiling register to Waiting Area.
Salvage (1) 2x4 light fixture for re-use.
Remove existing door at rest rooms & mechanical
room. Install new solid core door w/ lever hardware
and closer in existing openings.
Demo existing kitchenette
cabinets.
Remove existing toilet & vanity at rest rooms.
Install new in existing location.
Demo pocket door. Demo
pocket
door.
Demo counter.
DEMOLITION PLAN
A-1
REST RM.
REST RM.
ELEC PANELTEL/DATA PANELSexisting clerestory
3'x10' table
FLOOR PLAN, UNITS #1 & #2 - Proposed Renovations
Scale: 1/4" = 1'-0"1
0 5 10 15 FT
TEST ROOM
WAITING
RECEPTIONIST
STORAGE
CONFERENCE ROOM
2ND FLOOR EGRESS STAIR
OFFICE
OFFICEOFFICE
MECH. RM.MECH. RM.MAIN LOBBY & STAIRS
±20'-1 1/2"±9'-11 1/2"beam, abovebeam, above7'3" ceiling8'10 1/2" ceiling
8'10 1/2" ceiling
8'10 1/2" ceiling
8'10 1/2" ceiling
8'10 1/2" ceiling
8'10 1/2" ceiling
8'10 1/2" ceiling
8'10 1/2" ceiling
8'10 1/2" ceiling
8'0" ceiling
8'0" ceiling
8'0" ceiling
New wall - 2x4@16" OC w/ 5/8"
GWB ea. side. Align w/ existing
beam, above. Install 3" mineral
wool soundproofing.New 3'0"x6'8" door in ex. opening.TEST ROOM
TEST ROOM
TEST ROOM
TEST ROOM
TEST ROOM
New 3'0"x6'8" door.Remove door, frame to
remain.
New wall - 2x4@16" OC w/ 5/8" GWB ea. side. Align w/ existing wall. Install 3" mineral wool sound proofing.CLOSET5'-0"clear, finished4 3/4"±4'-11 3/4"1'-6"
align
alignSTORAGENEW BATHROOM - Install new w/ 42"
long x 1-1/2" OD grab bars. Install new
wall-hung sink. New 3'0"x6'8" door w/
lever privacy hardware & door closer.
New 2'6"x6'8"
door & frame w/
storage lockset.
New door & frame in ex. opening.1'-6"1'-6"
Note: modify ceiling as req'd. by new construction at Conference Rm. Modify lighting and HVAC.
New 4'0"x6'8"
bi-fold door.New 3'0"x6'8" door & frame. Lever privacy lockset w/ closer.New plastic laminate
countertop at reception.
New solid wood door
in ex. frame. Lever
storage lockset w/
closer.
New solid wood door
in ex. frame. Lever
privacy lockset w/
closer.
New solid wood door
in ex. frame. Lever
privacy lockset w/
closer.
Install new toilet & vanity in
ex. location in each ex.
restroom.New 3'0"x6'8" solid
core door w/
classroom lever
lockset. Patch wall
at former pocket
door opening.
New 3'0"x6'8" solid
core door w/
classroom lever
lockset. Patch wall
at former pocket
door opening.
General Notes:
New flooring (carpet or carpet tile, TBD) in all hallways,
Testing Rooms, Offices, Receptionist & Conference Room.
New VCT flooring in all Bathrooms.
New primed & painted walls, all spaces.
New LED lamps in all existing lighting fixtures to remain.
align
Repair / reset glazing at
existing storefront
Existing door to remain. Adjust /
rehang in frame.
Install new Owner provide
kitchentte cabinets.
Rev Date Description
Project Title This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Jody Barker, Architecture & Design, LLC is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.Proposed Renovations to
SUITE #1 & #2
90 Conz Street
Northampton, Massachusetts
for
LEARNING SOLUTIONS,
LLC
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 11/16/2020 Existing
Sheet Title
Scale:
03/02/2021
JPB
JPB
20-026
AS NOTEDJODY BARKER, A.I.A. | Architecture + Design, LLC32 Willow StreetFlorence, Massachusetts 01062cell: 617.216.5988e: jodybarker.aia@gmail.comPERMIT - 03/02/2021
2 03/02/2021 PERMIT SET
PROPOSED PLAN
A-2