Plumbing Plans-420 E Deer Springs WayFEFEFEDEHUMIDIFIER
SUSPENDEDFEREFER TO "PARTIALPLUMBING PLAN" ONDWG. P200 FOR THIS AREA.EXISTING 3/4"HOSE BIBB.EXISTING 3/4"HOSE BIBB.EXISTING 3/4"HOSE BIBB.2"(E)2"(E)2"(E)2"(E)3/4"(E)3/4"(E)3/4"(E)3/4"(E)3/4"(E)1"(E)1"1"TIE NEW 1" CW LINE INTO LANDLORDPROVIDED 1" CW STUB IN CEILINGSPACE. FIELD VERIFY EXACT SIZE &LOCATION PRIOR TO STARTING WORK.PC TO FURNISH AND INSTALL WATERSUB-METER AND DOUBLE CHECK BACKFLOWPREVENTER IF NECESSARY. COORDINATEEXACT REQUIREMENTS WITH LL AND GC.1-1/4"1-1/4"1"1"1"1" GAS RISER UP THRUROOF IN PIPING CURB &CONNECT TO RTU. SEEDWG. M101 FOR CONT.GG G
PC TO COORDINATE WITH GAS. COMPANYAND LANDLORD TO FURNISH & INSTALLNEW GAS METER FOR TENANT SPACE.1-1/4" GAS LINE THRU WALL ANDINTO TENANT SPACE TO RUN INCEILING SPACE. SEAL WALLPENETRATION WEATHER TIGHT.GAS LINE TO RUN INCEILING SPACE. (TYP.)3/4"(E)3/4"(E)CHECK-IN /RECPTIONASSOC.ENTRANCE /DELIVERIESTELLERSCASHROOMOFFICEELECTRICAL/DATA/ SECURITYEQUIPMENTSECURESTORAGERECEPTIONLOBBYSALESHALLWAYUNISEXTOILETROOMBUILDINGSPRINKLER ROOMN.I.C.BUILDINGELECTRICAL ROOMN.I.C.LOUNGE1" GAS RISER UP THRUROOF IN PIPING CURB &CONNECT TO RTU. SEEDWG. M101 FOR CONT.DEHUMIDIFIER PROVIDED & INSTALLEDBY GC. PC TO ROUTE 3/4" DRAIN LINEFROM UNIT TO MOP SINK (MS-C) ANDSAFEWASTE WITH 3" AIR GAP.SHEET TITLE :SHEET NO. :REVISION :ISSUE / DATE:CONSULTANT :DRAWN BY:1PENDING-XXXNORTH LAS VEGAS, NV 89084420 EAST DEER SPRINGS WAYISSUE 1 - BID - PERMIT DRAWINGSmm-dd-2020LANDLORD TENANT IMPROVEMENTSUITE 100P100PLUMBING PLANPODSCALE:PLUMBING PLAN1/4" = 1'-0"COLDWATER1/2"--LAVATORYFLOOR DRAINFIXTUREVENT1-1/2"1-1/2"WATER1/2"--HOTWASTE SIZES ARE MINIMUM BRANCH SIZE TO FIXTURE.WATER CLOSET (TANK)1/2"--2"FIXTURE BRANCH SCHEDULE4"3"1-1/2"1/2"MOP SINK1-1/2"1/2"3"1/2"ELECTRIC WATER COOLER1-1/2"-1-1/2"PLUMBING CONTRACTORPCGENERAL CONTRACTORGCLANDLORDLLTHERMOSTATIC MIXING VALVETMVSINKSKFLOOR DRAINFDTRAP PRIMERTPCLEANOUTCOELECTRIC WATER HEATEREWHCONNECT TO EXISTINGWALL CLEANOUTWCOELECTRIC WATER COOLEREWCPLUMBING SYMBOLS LEGENDCOLD WATER (CW)HOT WATER (HW)PLUMBING VENT (V)SANITARY WASTE (SAN)SHUTOFF VALVE (BALL TYPE)FIXTURE IDENTIFICATIONBALANCING VALVECHECK VALVEPIPE TURNING UP/DOWNTEE TURNING UP/DOWNAFF/AFGABOVE FINISHED FLOOR/GRADEWCWATER CLOSETRETURN HOT WATER (RHW)LAVLAVATORY11.10.8.9.6.7.5.3.4.SPECIFICATIONS, REFER TO PLUMBING SPECIFICATIONS ON DRAWING P300 FOR FURTHERINFORMATION AND REQUIREMENTS FOR PLUMBING CONTRACTOR.SUSPEND ALL HORIZONTAL SERVICE PIPING SHOWN ON THIS PROJECT SUCH AS, BUT NOTLIMITED TO WATER, SANITARY WASTE/VENT, FROM UNDERSIDE OF FLOOR STRUCTURE,UNLESS OTHERWISE NOTED OR INDICATED. HOLD SUCH PIPING HIGH AS POSSIBLE.EXTEND PIPING DOWN IN WALLS, PARTITIONS, CHASES, ETCETERA TO SERVE FIXTURESAND EQUIPMENT AS SHOWN ON PLANS.CONTRACTORS AND SUB-CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTIONDOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSEDTHROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY DETERMINED WITHOUTREFERENCE TO THE COMPLETE DOCUMENT SET.COORDINATE WITH THE WORK OF OTHER SECTIONS, EQUIPMENT FURNISHED BY OTHERS,REQUIREMENTS OF THE OWNER, AND WITH THE CONSTRAINTS OF THE EXISTINGCONDITIONS OF THE PROJECT SITE. PROVIDE PIPE RISES, DROPS, AND OFFSETS, ASREQUIRED FOR FIELD INSTALLATION AND TRADE COORDINATION. NOTIFY ARCHITECT OFANY DISCREPANCIES BEFORE STARTING WORK.DRAWINGS FOR PLUMBING WORK ARE DIAGRAMMATIC, SHOWING THE GENERALLOCATION, TYPE, LAYOUT, AND EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BESCALED FOR EXACT MEASUREMENT. REFER TO ARCHITECTURAL DRAWINGS FORDIMENSIONS. REFER TO MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOREQUIPMENT CONNECTIONS AND INSTALLATION REQUIREMENTS. PROVIDE PIPING,CONNECTIONS, FITTINGS, VALVES, OFFSETS, ETCETERA AND ALL MATERIALS NECESSARYFOR A COMPLETE SYSTEM. SUBMIT SHOP DRAWINGS PER THE SPECIFICATIONS.ALL WORK SHALL COMPLY WITH STATE AND LOCAL CODE REQUIREMENTS AS APPROVEDAND AMENDED BY THE GOVERNING CITY, INCLUDING APPLICABLE SECTIONS OF ANYINTERIM AMENDMENTS AT THE TIME OF THE PROPOSAL. PURCHASE ALL PERMITSASSOCIATED WITH THE WORK. OBTAIN ALL INSPECTIONS REQUIRED BY CODE.VERIFY SERVICE CONNECTION POINTS, SIZES, ELEVATIONS, AND METERING LOCATIONSFOR PROJECT WITH LOCAL UTILITIES COMPANY'S AND/OR LANDLORD FACILITYPERSONNEL. SERVICES TO INCLUDE BUT NOT LIMITED TO DOMESTIC WATER, FIRE,SANITARY SEWER, STORM SEWER, GAS, ETCETERA.WATER PRESSURE, PLUMBING CONTRACTOR SHALL VERIFY WATER PRESSURE PRIOR TOCONSTRUCTION. IF PRESSURE AT BUILDING ENTRY, PRIOR TO ALL LOCALLY REQUIREDDEVICES SUCH AS WATER METER, BACKFLOW PREVENTION DEVICES, ETCETERA IS LESSTHAN 55 PSIG STATIC, CONTACT OWNERS REPRESENTATIVE. IF PRESSURE IS IN EXCESSOF 80 PSIG STATIC, INSTALLATION OF PRESSURE REDUCING VALVE IS REQUIRED.WATER HAMMER ARRESTER SHALL BE INSTALLED THROUGHOUT PLUMBING WATERSYSTEMS AS REQUIRED.NO PLASTIC PIPING IS PERMITTED.PROVIDE AND NECESSARY SAW CUTTING OF CONCRETE FLOORS, EXCAVATING ANDBACKFILLING FOR THE INSTALLATION OF WORK SPECIFIED IN THIS DIVISION. AFTER THEPIPE HAS BEEN INSTALLED, TESTED AND APPROVED, THE TRENCHES SHALL BEBACKFILLED AND WELL TAMPED TO GRADE WITH APPROVED MATERIAL. PLUMBINGCONTRACTOR SHALL RE-POUR THE FLOOR.PLUMBING CONTRACTOR TO VERIFY IN FIELD EXACT LOCATION OF PLUMBINGCONNECTIONS PRIOR TO STARTING WORK.1.2.GENERAL NOTES12.1/2"SINK1-1/2"1/2"1-1/2"RECIRCULATING PUMPRCPPLUMING DEMOLITION NOTES3.2.1.PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALLEXISTING CLEANOUTS, FLOOR DRAINS, WATER LINES, VENTLINES, SANITARY LINES, ETC. PRIOR TO STARTING WORK.PLUMBING CONTRACTOR SHALL REMOVE ALL WATER AND VENTLINES NOT BEING REUSED.ALL CLEANOUTS, FLOOR DRAINS AND FLOOR SINKS NOT BEINGRUSED SHALL BE REMOVED AND THE WASTE LINE SHALL BEPLUGGED AND CAPPED 3" BELOW FLOOR.INFORMATION PROVIDED IS BASED ON FIELD SURVEY REPORTAND EXISTING DRAWINGS. CONTRACTOR SHALL VERIFY IN FIELDALL EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.PLUMBING CONTRACTOR TO CAP ALL SANITARY BRANCHESWITHIN TWO (2) FEET OF A VENTED MAIN. NO DEAD ENDSANITARY BRANCHES WILL BE PERMITTED.4.NOTE: PLUMBING CONTRACTOR SHALLCOORDINATE ALL NEW AND EXISTINGPLUMBING TO AVOID ELECTRICAL PANELSAND TRANSFORMER WITH ELECTRICALCONTRACTOR PRIOR TO STARTING WORK.5.GAS PRESSURE AFTER METER SHALL BE 7" WC.GAS PIPING ABOVE GROUND SHALL BE SCHEDULE 40 BLACK STEELWITH 125 POUND BLACK MALLEABLEIRON SCREWED FITTINGS. GASPIPING COMPOUND AT JOINTS SHALL BE PER NFPA BULLETIN #54 ANDLOCAL CODES. GAS VALVES SHALL BE UL LISTED FOR GAS SERVICESUCH AS DEZURICK MODEL S-425 FOR 2-1/2" AND LESS.PLUMBING CONTRACTOR TO PRIME & PAINT (2 COATS) EXTERIOR GASPIPING WITH RUST RESISTANT PAINT. COORDINATE EXACTREQUIREMENTS WITH LANDLORD.GAS PIPE SIZING IS BASED ON 70 FEET OF TOTAL DEVELOPED LENGTH.GAS PIPING NOTES1.2.3.CFH240.0TOTALROOFTOP UNIT (RTU-2)120.0CFHCFH120.0ROOFTOP UNIT (RTU-1)NEW GAS DEMAND4.1Exp:_____________PRO F E S S OINAL
MECHANICALKEVIN K.HERBERTE
NGI
NEER-STATEOFNEVADANo.158943-31-21
EWCJ1/2" H & CW DOWN IN WALLWITH 1/2" H & CW TO TMV-KAND 1/2" TEMPERED WATERAND 1/2" CW TO LAVATORY-B.PC TO INSTALL TMV-K UNDERLAV-B TO PROVIDE MAX. 105°HW FOR LAV-B. (TYP. FOR 2)WTR. HTR. 'D' MTD. ON SHELFABOVE (3/4" H & CW). SEEDETAIL ON DRAWING P-300.1/2" H & CW DOWN INWALL TO SERVE MS-C.MSC1-1/2"1"TIE NEW 4" SAN. INTO LLPROVIDED 4" SAN. STUBBELOW FLOOR. FIELDVERIFY EXACT LOCATION.COHWCALAVB3" FDF3/4" CW DOWN IN WALLWITH 1/2" CW TO WC-AAND 1/2" CW TO TP-G.TMVK2" VENT RISERWITH 3" VTR.4"3"1/2"3/4"2"SEE DRAWING P100FOR CONTINUATION.SKL1"1"1/2"1/2"1/2"1/2"3/4"3/4"3/4"1/2"V4"4"4"4"4"4"3"1-1/2"1-1/2"1-1/2"1-1/2"1/2"1/2"ASSOC. ENTRANCE /DELIVERIESHALLWAYUNISEXTOILETROOMMSCEWCJTIE NEW 4" SAN. INTO LL PROVIDED4" SAN. STUB BELOW FLOOR.FIELD VERIFY EXACT LOCATION.COH4"2"*TRAP PRIMERWCALAVB*3" FDFSKL3" VTR4"4"4"2"1-1/2"1-1/2"1-1/2"1-1/2"3"1-1/2"2"2"2"1-1/2"1-1/2"1-1/2"1-1/2"1-1/2"1-1/2"4"4"4"3"3"EWCJMSC3/4" H & CW DOWN TOWATER HEATER 'D'. SEEDETAIL ON DWG. P-300.1/2"TMVKTP-G WITH 1/2"CW TO FD-F.1/2"1/2" TEMPERED HWWCALAVBSKL1/2"1/2"3/4"1/2"1/2"1/2"3/4"1"1"3/4"3/4"1/2"1"1/2"1/2"3/4"1/2"SHEET TITLE :SHEET NO. :REVISION :ISSUE / DATE:CONSULTANT :DRAWN BY:NORTH LAS VEGAS, NV 89084420 EAST DEER SPRINGS WAYISSUE 1 - BID - PERMIT DRAWINGSmm-dd-2020LANDLORD TENANT IMPROVEMENTSUITE 100P200PLUMBING PLANPODSCALE:PARTIAL PLUMBING PLAN1/2" = 1'-0"PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL FIXTURES IN THIS SCHEDULEOR THEIR APPROVED EQUIVALENT:BCDEPLUMBING FIXTURE SCHEDULEWATER CLOSET: AMERICAN STANDARD #2467.016 ''CADET RIGHT HEIGHT", FLOORMOUNTED, WHITE VITREOUS CHINA, ELONGATED BOWL, PRESSURE ASSISTED 1.6GPF, RIM 16-1/2" AFF. BEMIS 1955SSC OPEN FRONT SEAT LESS COVER AND LOOSEKEY ANGLE STOP. MOUNT FLUSH LEVER OPPOSITE OF WALL (OPEN SIDE).LAVATORY (HANDICAP WALL HUNG): AMERICAN STANDARD ''LUCERNE'' #0355.012,20-1/2"x18"-1/4, WHITE VITREOUS CHINA, OVERFLOW, FAUCET LEDGE, AND WALLHANGER. AMERICAN STANDARD 'RELIANT' MODEL 7385.050 SINGLE LEVER FAUCET(POLISHED CHROME). PROVIDE GRID STRAINER DRAIN WITH TAILPIECE, CHROMEPLATED CAST BRASS P-TRAP WITH CLEANOUT, WASTE ARM TO WALL WITHESCUTCHEON, 0.5 GPM AERATOR AND LOOSE KEY ANGLE STOPS. INSULATE WATERAND WASTE PIPING UNDER LAVATORY WITH TRUEBRO "LAV GUARD2" #102E-Z.ROUGH IN 34" AFF TO RIM.MOP SINK: "FIAT" MODEL MSB-2424 MOLDED STONE MOP SERVICE BASIN AND24"x24". TO BE COMPLETE WITH STAINLESS STEEL SPLASH GUARDS FOR 3 SIDESVINYL BUMPER GUARD MODEL E-77-AA, HOSE AND HOSE BRACKET MODEL 832-AA,WALL MOP HANGER MODEL 889-CC, WALL GUARD MSG-2424, DOME STAINLESSSTEEL DRAIN WITH SEDIMENT BUCKET, AND WALL SERVICE FAUCET MODEL 830-AAWITH VACUUM BREAKER, AND WALL BRACE.WATER HEATER: A.O. SMITH MODEL DEL-20, 30 GALLON CAPACITY GLASS LINEDTANK, 3000 WATTS, 208V SINGLE PHASE, PROVIDE COMPLETE WITH T&P RELIEFVALVES, ALL OPERATING AND SAFETY CONTROLS AND 3" HIGH GALVANIZED SHEETMETAL DRAIN PAN SEALED WATERTIGHT.EXPANSION TANK: AMTROL #ST-5 "THERM-X-TROL", TOTAL VOLUME OF 2 GALLONSWITH A MAXIMUM ACCEPT VOLUME OF .9 GALLONS, 3/4" CONNECTION. INSTALL PERMANUFACTURER INSTRUCTION.ASCALE:NONEWATER PIPING ISOMETRICSCALE:NONESANITARY WASTE ISOMETRICPLUMBING CONTRACTOR SHALL FURNISH AND INSTALL FIXTURES IN THIS SCHEDULEOR THEIR APPROVED EQUIVALENT:PLUMBING FIXTURE SCHEDULEFLOOR DRAIN: JR SMITH #2010 CAST IRON DRAIN WITH NICKEL BRONZE STRAINER,TRAP PRIMER. PROVIDE OUTLET WITH P-TRAP. CLEAN AND POLISH STRAINER TOPAFTER INSTALLATION. OPTIONAL ROUND OR SQUARE STRAINER.TRAP PRIMER: PRECISION PLUMBING PRODUCT #PRIME-RITE, AUTOMATICOPERATIONS, 1/2" INLET AND OUTLET. SERVICE UP TO FOUR FLOOR DRAINS WITHDISTRIBUTION UNIT. INSTALL IN ACCESSIBLE LOCATION WITH PRIMER BEING AMINIMUM OF 6" ABOVE FLOOD LEVEL OF FLOOR DRAIN RIM. PROVIDE ACCESS PANELAS REQUIRED.FLOOR CLEANOUT: ADJUSTABLE CLEANOUT, JOSAM SERIES 58360ELECTRIC WATER COOLER: ELKAY MODEL NO. EZSTL-8-C, DUAL MOUNTED, BARRIERFREE WALL HUNG STAINLESS STEEL RECEPTOR, PUSH-BAR OPERATED BUBBLER,STAINLESS STEEL WITH SIENNA BRONZE FINISH CABINET, 8.0 GPH OF 50 DEGREES FWATER AT 90°F AMBIENT AND 80°F ENTERING WATER, 115V, 1 PHASE. PROVIDE WITHACCESSORY APRON MODEL LKAPREZL. MOUNT AT ELEVATIONS INDICATED ONARCHITECTURAL DRAWINGS.THERMOSTATIC MIXING VALVE: WATTS SERIES LFMMV-M1. BRONZE BODY,STAINLESS STEEL DISC. MIN. SUPPLY PRESSURE STATIC - 30 PSI, MIN. FLOW - 0.5GPM, MAX. FLOW - 20 GPM. 1/2'' LINE SIZE. ASSE 1070 LISTED.SINK: SHALL BE ELKAY NO. LR-1918, 18 GAUGE SINGLE BOWL SELF-RIMMINGSTAINLESS STEEL SINK, 19"x18" SINK WITH NO. LK-35 STAINLESS STEEL BASKETSTRAINER AND 1-1/2" TAILPIECE AND NO. LK-4102 SINGLE LEVER DECK MOUNTEDFAUCET WITH SWIVEL SPRAY AERATOR.FGHJKLExp:_____________PRO F E S S OINAL
MECHANICALKEVIN K.HERBERTE
NGINEER-STATEOFNEVADANo.15894 3-31-21
PROVIDE UPPER ATTACHMENT AS REQUIRED FOR CASES NOT SHOWN HERE. DO NOT INSTALLHANGER INSIDE INSULATION OR OTHERWISE PENETRATE VAPOR BARRIER. DO NOT HANG ONEPIPE FROM ANOTHER EXCEPT IN CHASES. TRAPEZE HANGERS MAY BE USED FOR MULTIPLEPARALLEL PIPES. HANGER SPACING FOR PIPE SIZE: COPPER: 4"=12'; 3"=11'; 2-1/2"=10'; 2"=9'1-1/2"=8'; 1-1/4"=7'; 1"=6'; 3/4"=6'; 1/2"=5'. CAST IRON: 10' AND ONE NEAR ALL JOINTS. STEEL: 4"=14';3"=12'; 2-1/2"=11'; 2"=10'; 1-1/2"=9'; 1"=7'; 3/4"=6'; 1/2"=5'. LOCATE HANGERS AS CLOSE AS POSSIBLETO TURNS AND TEES OF PIPE. PROVIDE SUPPLEMENTARY STEEL STRUTS BETWEEN JOISTS IFREQUIRED. LOCATE HANGERS TO TAKE LOAD OFF OF EQUIPMENT CONNECTIONS. ANCHORWATER PIPE AGAINST SWAYING DUE TO CHANGES IN WATER VELOCITY. PROVIDE SEISMICBRACING IF/AS REQUIRED BY LOCAL AUTHORITIES. CHAINS OR PERFORATED STRAP IRON ORSTEEL IS NOT ACCEPTABLE. REFER TO CODES FOR FURTHER INFORMATION.PROVIDE GALVANIZED STEEL SADDLE FOR ALLINSULATED PIPE LARGER THAN 3/4". VERIFYINSULATION THICKNESS WHEN SIZING HANGERS.DO NOT HANG PIPELARGER THAN 3" FROMBOTTOM OF JOISTS.ADJUSTABLE BANDHANGER FOR PIPINGFOUR INCH OR LESSALL-THREAD ROD.LENGTH AS REQ'DFOR PIPE SLOPEPROVIDE COPPER ORNON-METALLIC COATINGWHERE HANGERSCONTACT BARE COPPERPIPEPROVIDE FIBERGLASS INSULATION WITH ALL-SERVICE JACKET WITH VAPOR BARRIER ON ALLCOLD/HOT WATER PIPING AND CONDENSATE DRAIN PIPE. REFER TO SPECIFICATIONS FORFURTHER INFORMATION REGARDING INSULATION. INSTALL ALL ITEMS PER SPECIFICATIONSAND MANUFACTURERS INSTRUCTIONS. MAINTAIN VAPOR BARRIER ON COLD PIPING BY MEANSOF SEALANT AND TAPE. FLAME-SPREAD AND SMOKE-DEVELOPED INDEXES SHALL NOT EXCEED25/50. SEAL EXPOSED ENDS OF FIBERGLASS INSULATION WITH ADHESIVE MASTIC.PROVIDE INSULATION ON DOMESTICHOT/COLD WATER PIPES, STORMWATER PIPES, AND CONDENSATEDRAIN PIPING IN WALLS AND CHASESPC TO PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF, PRECISION PLUMBING PRODUCTS,WATTS OR APPROVED EQUIVALENT WITH PISTON AND 0-RING CONSTRUCTION, HAVING PDI#WH-201, ASSE #1010 AND ANSI #A112.26.1M CERTIFICATION. INSTALL IN HORIZONTAL OR VERTICALPOSITION, BUT NEVER UPSIDE DOWN. INSTALL IN LINE WITH WATER FLOW DIRECTION IF POSSIBLE.SIZE THE UNITS AS SHOWN ON THE DRAWINGS AND/OR PER THE TABLES SHOWN ABOVE.112"114"34"12"SCALE:NONEP300PIPE INSULATION3SCALE:NONEP300WATER HAMMER ARRESTERS1SCALE:NONEP300PIPE HANGERS2MITER THE INSULATION AT TEESAND ELBOWS SO THAT THEREARE NO GAPS AT JOINTS.PROVIDE ONE-PIECE PRE-MOLDEDPVC FITTING COVERSCOVER VALVE BODIES WITHINSULATION, BUT NOT UNIONSTAPE JOINTS OFFIBERGLASSINSULATIONPROVIDE A ONE FOOT LENGTH OFNON-COMPRESSIBLE INSULATION ATHANGERS FOR ALL PIPE 2" AND LARGERREFER TO OTHER DETAILS FORTREATMENT OF INSULATION ATPENETRATION OF WALLS AND FIREWALLSCLEVIS HANGER FORPIPE OVER FOUR INCH1"EDBAC114-15461-11312-321-1133-60PDISIZEPIPESIZEFIXTUREUNIT LOADMULTIPLE FIXTURESSINGLE FIXTUREPDI SIZE "A"INSTALL PER PDISTANDARDS ANDMANUFACTURERSINSTRUCTIONSHOT OR COLD WATER SUPPLYIF HORIZONTAL BRANCH ISLESS THAN 20' LONG, PROVIDEONE WHA AT END OF LINE.IF BRANCH IS GREATER THAN 20' LONG,PROVIDE ANOTHER WHA IN MIDDLE,EACH SIZED FOR HALF THE FIXTURE UNITS.WATER CLOSET (TANK)0.251.55.02.250.251.5--2.25LAVATORYJANITOR'S SINKELECTRIC WATER COOLERFIXTUREFIXTURE UNIT TABULATIONHOTCOLDTYPE "K" SOFT COPPER TUBE BELOW FLOORSLAB WITHOUT JOINTS. SLOPE TOWARD FLOORDRAIN TRAP. PROVIDE ELASTOMERICINSULATION FROM TRAP TO ABOVE FLOOR SLABFLOOR DRAIN OR FLOORSINK P-TRAP WITH TRAPPRIMER CONNECTIONTRAP PRIMERWITH INTEGRALVACUUM BREAKERDOMESTIC COLD WATER LINE IN PLUMBINGCHASE OR UNDER FIXTURE. MAKE BRANCHTO TRAP PRIMER OFF TOP OF THIS PIPETRAP PRIMER IN CHASE OR UNDER FIXTURE.INSTALL PRIMER MINIMUM SIX INCHES ABOVEFLOOD RIM OF FIXTURE BEING SERVEDPROVIDE DISTRIBUTION UNITS WHERE MORETHAN ONE TRAP IS SERVED BY A PRIMERPRIMER MAY BE LOCATED ABOVE CEILING WHEREACCESSIBLE. IF LOCATED IN A CHASE OR WALL,PROVIDE A HINGED, LOCKABLE, PRIME COATED ACCESSDOOR IN AN ACCESSIBLE BUT INCONSPICUOUS PLACEPROVIDE COUPLINGSCALE:NONEP300TRAP PRIMER5CONCRETE FLOORNOTE: TRAP PRIMER MAY BE LOCATED ABOVE CEILING WHERE ACCESSIBLE.1/2" TEMPEREDWATER TO SECONDLAV.UNDER-THE-COUNTERTHERMOSTATICTEMPERING VALVE1/2" HW WITHSERVICE VALVE1/2"1/2" CW WITHSERVICE VALVE1/2" TEMPEREDWATER LINE1/2"LAVSCALE:NONEP300THERMOSTATIC TEMPERING VALVE DETAIL4SCALE:NONEP300ELECTRIC WATER HEATER6COLD WATER SUPPLY TO WATER HEATERSHUT OFF VALVES (TYP)HOT WATER TO FIXTURESAS SHOWN ON PLANSPIPE UNIONS, (EIELECTRICREQUIRED FOR DISSIMILARMETALS)ELECTRIC WATER HEATER.REFER TO SPECIFICATIONSAND PLUMBING FIXTURESCHEDULEPROVIDE WATER-TIGHTGALVINIZED SHEETMETAL PAN 2" DEEPWITH 1" DRAIN PIPETO RECEPTACLEPIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS.REFER TO FLOOR PLAN FOR PIPES SIZES. SET WATER HEATER THERMOSTAT AT120° FAHRENHEIT. PROVIDE SEISMIC STRAP OR BRACING AND FLEXIBLECONNECTORS TO WATER CONNECTIONS IF/AS REQUIRED BY LOCAL AUTHORITIES.SET WATER HEATER ONPLATFORM ABOVE CEILING(PLATFORM IS BY GC)DRAIN VALVEHARD COPPER RELIEFDISCHARGE LINE. FULL SIZE OFVALVE OUTLET TO END OVERHUB DRAIN WITH 6 INCH AIR GAPPROVIDE A 210° F TEMPERATUREAND 150 PSI PRESSURE RELIEFVALVE WITH TEST LEVER SIZEDWITH AGA/CGA TEMPERATURESTEAM RATING 10% OVER HEATER INPUTTO EXPANSION TANK IFREQ'D SEE DETAILCHECK VALVE (TYP)PIPE HANGER NEXTTO PIPE TEEWELDED STEEL EXPANSION TANKWITH POLYPROPYLENE LININGBUTYL DIAPHRAGMPIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS.MAKE PIPE SAME SIZE AS TANK FITTING. FOLLOW MANUFACTURER'S INSTRUCTIONSFOR INSTALLATION PROCEDURE. VERIFY PROPER OPERATION WHEN INSTALLED.EXPANSION TANK INSTALLATION SHALL OCCUR ONLY WHEN THERE IS A BACKFLOWPREVENTION DEVICE INSTALLED WITHIN THE TENANT SPACE WATER SYSTEM ORBUILDING WATER SYSTEM.AIR CHARGING VALVEFILL TANK WITH AIRPRESSURE TO MATCHWATER PRESSURE,THEN OPEN VALVEPIPE UNION:DIELECTRIC IFDISSIMILAR METALSCOLD WATER SUPPLYTO WATER HEATERSCALE:NONEP300EXPANSION TANK7PROVIDE INDEPENDENT SUPPORT FORTANK. (I.E.: SIOUX CHIEF EXPANSIONTANK SUPPORT KIT - 598-021 SERIES).TYPICAL FOR 2 BANDS.SHEET TITLE :SHEET NO. :REVISION :ISSUE / DATE:CONSULTANT :DRAWN BY:NORTH LAS VEGAS, NV 89084420 EAST DEER SPRINGS WAYISSUE 1 - BID - PERMIT DRAWINGSmm-dd-2020LANDLORD TENANT IMPROVEMENTSUITE 100P300PLUMBING DETAILS& SPECIFICATIONSPODPLUMBING SPECIFICATIONSTHE WORK INCLUDES MODIFICATION TO THE EXISTING PLUMBING SYSTEM AND PROVIDING NEWMATERIALS, FITTINGS AND ACCESSORIES NECESSARY FOR A COMPLETE FUNCTIONING PLUMBINGSYSTEM. ALL WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES AND/OR ORDINANCES AND ISSUBJECT TO INSPECTION.HOOK-UP CHARGES, PERMITS AND ALL OTHER EXPENSES RELATED TO A COMPLETE ANDFUNCTIONING PLUMBING SYSTEM ARE INCLUDED AS A PART OF THIS SECTION.THE INTENT OF THE DRAWINGS IS TO INDICATE THE GENERAL EXTENT OF WORK REQUIRED FOR THEPROJECT. THE DRAWINGS FOR PLUMBING WORK ARE DIAGRAMMATIC, SHOWING THE GENERALLOCATION, TYPE, FIXTURES AND EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BE SCALEDFOR EXACT MEASUREMENTS. REFER TO MANUFACTURER'S STANDARD ROUGH-IN DRAWINGS FORPLUMBING FIXTURE INSTALLATION REQUIREMENTS. COMPLY WITH ALL APPLICABLE ADAINSTALLATION REQUIREMENTS.COORDINATE WITH THE WORK OF OTHER SECTIONS, EQUIPMENT FURNISHED BY OTHERS, AND WITHTHE CONSTRAINTS OF THE EXISTING CONDITIONS OF THE PROJECT SITE.PIPING SYSTEMS - GENERAL: ALL PIPING SHALL BE RUN PARALLEL TO BUILDING LINES ANDSUPPORTED AND ANCHORED AS REQUIRED TO FACILITATE EXPANSION AND CONTRACTION. ALLPIPING SHALL BE CONCEALED EXCEPT IN UNFINISHED SPACES. INSTALL AS REQUIRED TO MEET ALLCONSTRUCTION CONDITIONS AND TO ALLOW FOR INSTALLATION OF OTHER WORK SUCH AS DUCTSAND ELECTRICAL CONDUIT. AT ALL CONNECTIONS BETWEEN FERROUS PIPING AND NONFERROUSPIPING, PROVIDE AN ISOLATING DIALECTIC UNION. ALL HANGERS SHALL BE COMPATIBLE WITHPIPING MATERIAL TO PREVENT CORROSION.PROVIDE ALL FITTINGS, ACCESSORIES, OFFSETS, AND MATERIALS NECESSARY TO FACILITATE THEPLUMBING SYSTEM'S FUNCTIONING AS INDICATED BY THE DESIGN AND THE EQUIPMENT INDICATED.FIXTURES/EQUIPMENT FURNISHED BY OTHERS: PLUMBING CONTRACTOR SHALL PROVIDE UTILITYCONNECTIONS REQUIRED SUCH AS WATER, GAS, AIR, SUPPLIES, WASTE OUTLET, TRAPS,ETCETERAS AT ALL PLUMBING TYPE FIXTURES OR EQUIPMENT FURNISHED BY OWNER, GENERALCONTRACTOR, ETCETERA. INCLUDED ARE STOP VALVES, ESCUTCHEONS, AND CHROME PLATEDBRASS TUBING WITH COMPRESSION FITTINGS.SEWER AND WASTE PIPING: PROVIDE ALL DRAINS AND SEWERS WITHIN THE LEASED SPACE WITHCONNECTION TO THE LANDLORD'S EXISTING DRAINAGE SYSTEMS ON-SITE. SANITARY DRAINAGEPIPING ABOVE FLOOR SHALL BE HUBLESS CAST-IRON PIPE, FITTINGS AND CONNECTIONS. SANITARYDRAINAGE PIPING BELOW GRADE SHALL BE SERVICE-WEIGHT HUB AND SPIGOT TYPE CAST-IRONWITH NEOPRENE GASKET JOINTS. ALL DRAINAGE PIPING SHALL BE UNIFORMLY PITCHED, 1/4" PERFOOT FOR PIPE SIZES 3" AND SMALLER, 1/8" PER FOOT FOR PIPE SIZES 4" AND LARGER, UNLESSOTHERWISE REQUIRED BY EXISTING CONDITIONS, OR INDICATED ON THE DRAWINGS.VENTS: PROVIDE A COMPLETE SYSTEM OF STANDARD WEIGHT CAST IRON NO-HUB VENT RISERSWHERE THE CEILING SPACE IS USED AS A RETURN AIR PLENUM OR USE DWV PLASTIC (WHEREPERMITTED BY CODE/LOCAL AUTHORITIES). WHERE THERE IS A DUCTED RETURN AIR SYSTEM, DONOT USE DWV PLASTIC IN RETURN AIR PLENUM SPACES. THE VENT SYSTEM SHALL BE CARRIEDTHROUGH THE ROOF WITH APPROPRIATE FLASHING.CONDENSATE AND INDIRECT DRAIN PIPING: EXTERIOR CONDENSATE DRAIN PIPING SHALL BESCHEDULE 40 PVC, INTERIOR CONDENSATE DRAIN PIPING SHALL BE TYPE M COPPER TUBING UP TO1" ID, TYPE DWV TUBING AND FITTINGS FOR 1-1/4" AND LARGER SIZES.CLEANOUTS: PROVIDE CLEANOUTS AT THE END OF EACH HORIZONTAL RUN, AND AT THE BASE OFALL VERTICAL WASTE AND DRAIN PIPES. CLEANOUTS SHALL BE OF THE SAME SIZE AS THE PIPESTHEY SERVE, CONFORMING TO CODE REQUIREMENTS. PROVIDE SUITABLE WALL OR FLOORCLEANOUTS WITH ACCESSORIES TO OBSCURE FROM VIEW.WATER DISTRIBUTION PIPING: LAYOUT WATER PIPING SO THAT THE ENTIRE SYSTEM CAN BEDRAINED. ABOVE GRADE HOT AND COLD WATER PIPING SHALL BE 1/2" MINIMUM TYPE L COPPERTUBING WITH WROUGHT COPPER FITTINGS AND SWEAT CONNECTIONS. BELOW GRADE HOT ANDCOLD WATER PIPING SHALL BE 1/2" MINIMUM TYPE K COPPER TUBING WITH WROUGHT COPPERFITTINGS, AND SWEAT CONNECTIONS. PROVIDE WATER HAMMER ARRESTERS AT EACH FIXTURE ORGROUP OF FIXTURES AS REQUIRED. INSTALL CHROME PLATED BRASS ESCUTCHEON PLATES AT ALLPENETRATIONS THROUGH FINISHED SURFACES (INCLUDING CABINET INTERIORS). USETIN-ANTIMONY SOLDER, 95/5 FOR ALL SWEAT FITTINGS OF COPPER PIPING.PIPE INSULATION: RIDGE ONE-PIECE FIBERGLASS PIPE INSULATION WITH REQUIREMENTSCOMPLYING WITH ASTM C 547, SELF-SEALING ADHESIVE LAP LONGITUDINAL JOINTS AND BUTTSTRIPS FOR TRANSVERSE JOINTS. JACKETING SHALL CONFORM TO ASTM C 1136, TYPE I, MAXIMUMVAPOR TRANSMISSION RATING OF 0.02 PERM WHEN TESTED ACCORDING TO ASTM E 96,PROCEDURE A. (K VALVE) 0.25 BTU * IN. / HR. * FT2 * °F AT 75°F MEAN TEMPERATURE. PROVIDEINSULATION THICKNESS AS INDICATED.DOMESTIC COLD WATER PIPING 1" AND SMALLER: 1/2" THICKNESSDOMESTIC COLD WATER PIPING 1-1/4" - 2": 3/4" THICKNESSPLUMBING VENT PIPING WITHIN 6 FEET OF ROOF OUTLET: 1" THICKNESSCONDENSATE PIPING: 1/2" THICKNESSDOMESTIC HOT WATER PIPING 2" AND SMALLER: 1" THICKNESSHOT WATER AND WASTE PIPING BELOW HANDICAP LAVATORIES/SINKSPIPE INSULATION: FLEXIBLE, ONE PIECE, EXPANDED CLOSED-CELL ELASTOMERIC PIPE INSULATIONWITH REQUIREMENTS COMPLYING WITH ASTM C 518, SELF-SEALING, WITH A MAXIMUM VAPORTRANSMISSION RATING OF 0.20 PERM WHEN TESTED ACCORDING TO ASTM E 96. THERMALCONDUCTIVITY (K VALVE) SHALL NOT EXCEED 0.27 BTU * IN. / HR. * FT2 * °F AT 75°F MEANTEMPERATURE, AND INSULATION AND JACKET SHALL BE RATED FOR OPERATING TEMPERATURESFROM 40°F TO 180°F. PROVIDE INSULATION THICKNESS AS INDICATED.DOMESTIC COLD WATER PIPING 2" AND SMALLER: 1/2" THICKNESS CONDENSATE PIPING: 1/2"THICKNESSDOMESTIC HOT WATER PIPING 2" AND SMALLER: 1/2" THICKNESSSHUTOFF VALVES, WITH UNIONS SHALL BE PROVIDED FOR SERVICE TO EACH PLUMBING FIXTURE,FOOD SERVICE EQUIPMENT ITEM OR OTHER EQUIPMENT ITEM, TO FACILITATE ISOLATION FORREPAIR OR REPLACEMENT. VALVES SHALL BE EQUAL TO CRANE #9302-9322 BALL VALVE.CONSTRUCTION - TWO PIECE, BRONZE BODY, FULL PORTED, CHROME PLATED BRASS BALL,REPLACEABLE "TEFLON OR TFE" SEATS AND SEALS. RATING - 150 PSI WSP, 600 PSI WOG.CONNECTIONS - SOLDER OR THREADED ENDS TO MATCH PIPING. STANDARDS COMPLIANCE -BRONZE OR BRASS VALVES: MSS-SP-110.ACCESS PANELS SHALL BE PROVIDED WHERE CONCEALED CONTROL DEVICES, VALVES, ETCETERAARE CONCEALED WITHIN WALLS. WHERE ACCESS FOR ADJUSTMENT AND MAINTENANCE ISPOSSIBLE THROUGH LAY-IN SUSPENDED CEILINGS, ACCESS PANELS ARE NOT REQUIRED.INSTALLATION: THOROUGHLY CLEAN ITEMS BEFORE INSTALLATION. CAP PIPE OPENINGS TOEXCLUDE DIRT UNTIL FIXTURES ARE INSTALLED AND FINAL CONNECTIONS HAVE BEEN MADE.PROCEED AS RAPIDLY AS CONSTRUCTION WILL PERMIT. SET FIXTURES LEVEL AND IN PROPERALIGNMENT. INSTALL SUPPLIES IN PROPER ALIGNMENT WITH FIXTURES. INSTALL SILICONESEALANT BETWEEN FIXTURES AND ADJACENT MATERIAL, FOR SANITARY JOINT, AND OMITESCUTCHEONS.REPAIR EXISTING PLUMBING SYSTEM COMPONENTS DAMAGED BY CONSTRUCTION OPERATIONSAND RESTORE TO ORIGINAL CONDITIONS.TEST WATER SYSTEM UNDER 150 PSIG HYDROSTATIC PRESSURE, FOR FOUR (4) HOURS MINIMUM.WHEN TESTING INDICATES MATERIALS OR WORKMANSHIP IS DEFICIENT, REPLACE OR REPAIR ASREQUIRED, AND REPEAT TEST UNTIL STANDARDS ARE ACHIEVED.TEST SANITARY DRAINAGE AND VENT SYSTEM BY FILLING WITH WATER, WITH ALL POINTS IN THESYSTEM BEING SUBJECT TO PRESSURE OF AT LEAST 10' OF WATER. WATER LEVEL SHALL REMAINSTATIONARY FOR A PERIOD OF ONE HOUR, WITHOUT ANY PIPE OR JOINT LEAKAGE. IF TESTINGINDICATES DEFICIENTS REPLACE OR REPAIR AS REQUIRED, AND REPEAT TEST UNTIL STANDARDSARE ACHIEVED.PROVIDE A COMPLETE GAS PIPING SYSTEM TO SERVE GAS FIRED HVAC EQUIPMENT, DOMESTICWATER HEATER'S AND EQUIPMENT FURNISHED BY OTHERS, AS NOTED ON THE DRAWINGS. PROVIDEEITHER THREADED STEEL OR MALLEABLE IRON PIPE WITH MALLEABLE FITTINGS OR WELDED STEEL.PROVIDE ALL UNIONS, SHUT-OFF VALVES AND DIRT LEGS REQUIRED BY NFPA-54 AND GOVERNINGLOCAL CODES AND AT EACH GAS APPLIANCE CONNECTION. PROVIDE ALL TESTS, METERS,INSPECTIONS, HANGERS AND EQUIPMENT CONNECTIONS REQUIRED FOR A COMPLETE ANDOPERATING SYSTEM.Exp:_____________PRO F E S S OINAL
MECHANICALKEVIN K.HERBERTE
NGI
NEER-STATEOFNEVADANo.158943-31-21