Fire Protection-420 E Deer Springs WaySSSSSELECTRICAL/ DATA/SECURITY EQUIPMENT3CHECK-IN /RECPTIONASSOC.ENTRANCE /DELIVERIESTELLERSCASHROOMOFFICESECURESTORAGERECEPTIONLOBBYSALESHALLWAYUNISEXTOILETROOMBUILDINGSPRINKLER ROOMN.I.C.BUILDINGELECTRICAL ROOMN.I.C.LOUNGETR ALCOVE11111222222GYP. BD. CEILINGEL.: 9'-6" A.F.F.GYP. BD. CEILINGEL.: 11'-0" A.F.F.ACT CEILINGEL.: 11'-0" A.F.F.ACT CEILINGEL.: 10'-0" A.F.F.GYP. BD. CEILINGEL.: 10'-6" A.F.F.ACT CEILINGEL.: 11'-0" A.F.F.OPEN (NO CEILING)EL.: ;14'-0" A.F.F.B.O. EXIST. WD. TRUSSGYP. BD. CEILINGEL.: 11'-0" A.F.F.GYP. BD. CEILINGEL.: 11'-0" A.F.F.GYP. BD. CEILINGEL.: 9'-0" A.F.F.SHEET TITLE :SHEET NO. :REVISION :ISSUE / DATE:CONSULTANT :DRAWN BY:NORTH LAS VEGAS, NV 89084420 EAST DEER SPRINGS WAYISSUE 1 - BID - PERMIT DRAWINGSmm-dd-2020LANDLORD TENANT IMPROVEMENTSUITE 100FP100FIRE PROTECTIONPLAN, NOTES &SPECIFICATIONSPODSCALE:FIRE PROTECTION PLAN 1/4" = 1'-0"THIS DRAWING IS FOR REFERENCES PURPOSE ONLY. THE FIRESPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR THE FULLDESIGN OF THE SPRINKLER SYSTEM AND ITS CONFORMANCE TONFPA 13 AND ANY LOCAL CODE REQUIREMENTS.SPRINKLER CONTRACTOR SHALL REVIEW ARCHITECTURALDRAWINGS FOR CEILING TYPES, HEIGHTS, COLOR, ELEVATIONS,SOFFITS, DISPLAY WINDOWS, ETC.SPRINKLER CONTRACTOR SHALL FURNISH AND INSTALLSPRINKLERS UNDER ALL EQUIPMENT AND DUCTS OVER 48" WIDE.SPRINKLER HEADS AND OTHER PENETRATIONS SHALL HAVEA 2" OVERSIZED RING, SLEEVE OR ADAPTOR THROUGH THECEILING TO ALLOW FOR FREE MOVEMENT OF AT LEAST 1" INALL HORIZONTAL DIRECTIONS.FIRE PROTECTION NOTES1.2.3.1SPRINKLER HEADS IN ACOUSTIC TILE AND HARD CEILINGS IN SALESAREAS, RECEPTION LOBBY, TELLERS, AND SECURE STORAGE SHALLBE TOTALLY CONCEALED TYPE. PAINT TO MATCH CEILINGS.SPRINKLER HEADS IN THE RESTROOMS, CASH ROOM, OFFICE ANDBACK OF HOUSE AREAS SHALL BE SEMI-RECESSED TYPE.PAINT HEADS TO MATCH CEILINGS.SPRINKLER HEADS IN THE ELECTRICAL/ DATA/ SECURITY EQUIPMENT(OPEN CEILING) SHALL BE UPRIGHT TYPE. HEADS TO BE BRASS.FIRE PROTECTION PLAN KEY NOTES234.1. DESIGN / BUILD REQUIREMENTS1. THE SPRINKLER SUBCONTRACTOR, A LICENSED SUBCONTRACTOR OF THE TENANT'S GENERAL CONTRACTOR (USEONLY DESIGNATED SPRINKLER SUBCONTRACTOR IF REQUIRED BY LANDLORD) IS REQUIRED TO MODIFY AN EXISTINGAND/OR PROVIDE A NEW SYSTEM AS PER THE LATEST NFPA PAMPHLET (PAMPHLET 13) AND THE BUILDING LANDLORD'SINSURANCE UNDERWRITER'S REQUIREMENTS AND OTHER RELEVANT AUTHORITIES' REQUIREMENTS. SPRINKLERCONTRACTOR TO VERIFY WITH BUILDING LANDLORD AS TO THE BASIS FOR DESIGN - OCCUPANCY TYPE AND DENSITY,NORMAL OR HYDRAULIC.2. THE SYSTEM SHALL BE DESIGNED TO MODIFY AND/OR PROVIDE NEW SPRINKLER HEADS WITHIN THE DEMISEDPREMISES.3. THE SPRINKLER HEAD TYPES TO BE USED IN THIS TENANT SPACE ARE INDICATED ON THE FLOOR PLANS. IF THERE ISA SPECIAL TYPE HEAD REQUIRED BY THE LANDLORD, USE LANDLORD'S SPECIFICATION ONLY.4. THE SPRINKLER CONTRACTOR SHALL INCLUDE IN HIS SUBMISSIONS FOR APPROVAL BY THE BUILDING DEPARTMENT,LANDLORD AND REVIEW BY THE TENANT'S REPRESENTATIVE, A MINIMUM 1/4" SCALE SPRINKLER LAYOUT. (UTILIZETENANT'S REFLECTED CEILING PLAN.)5. THE SPRINKLER SUBCONTRACTOR SHALL OBTAIN ALL APPROVALS FROM APPLICABLE AUTHORITIES FOR THESPRINKLER SYSTEM.6. OWNER, TENANT, CLIENT AND LESSEE ARE ALL THE SAME INDIVIDUAL OR COMPANY. THE LANDLORD AND LESSOR ISTHE BUILDING LANDLORD AND/OR THE OWNER OR REPRESENTATIVE OF THE OWNER OF THE SPACE. LANDLORD'SARCHITECT AND CONSTRUCTION REPRESENTATIVE MAY OR MAY NOT BE ONE AND THE SAME; TENANT'S ARCHITECTAND CONSTRUCTION REPRESENTATIVE MAY OR MAY NOT BE ONE AND THE SAME.7. SINCE SPACE TO BE OCCUPIED WAS WHOLLY OR PARTIALLY ANOTHER TENANT, THE SPRINKLER SUBCONTRACTORMUST CHECK SITE CONDITIONS TO ANALYZE IF MAINS, BRANCH LINES, SPRINKLER HEADS ETC., ARE TO BE UTILIZED.SUBCONTRACTOR SHALL INCLUDE ALL COST IN BID FOR ALL WORK AND MATERIAL REQUIRED FOR COMPLETE ANDFINISHED PROJECT.8. THIS SYSTEM (NEW OR EXISTING) IS TO BE INSTALLED OR MODIFIED AS TO LAYOUT AND CAPACITY BASED ONTENANT'S FLOOR PLANS, CEILING PLANS, HEIGHTS AND SECTIONS AND THE LATEST NFPA PAMPHLET/STANDARDSGOVERNING THIS USE. SPRINKLER SUBCONTRACTOR TO CHECK WITH LOCAL FIRE AUTHORITIES REGARDING ANYSPECIAL SPRINKLER REQUIREMENTS FOR SIDE WALL CASES (AS APPLICABLE).9. ALL SPRINKLER HEADS IN ACOUSTICAL SALES AREA CEILINGS TO BE IN CENTER OF TILES.II. GENERAL REQUIREMENTS1. IT IS THE INTENT OF THESE SPECIFICATIONS TO PROVIDE A COMPLETE INSTALLATION FOR FINISHED WORK, TESTEDAND READY FOR OPERATION. THE WORK THROUGHOUT SHALL BE EXECUTED IN THE BEST AND MOST THOROUGHMANNER UNDER THE DIRECTION OF AND TO THE SATISFACTION OF THE BUILDING OWNER AND TENANT'SREPRESENTATIVE.2. ALL MATERIALS REQUIRED FOR THIS WORK SHALL BE NEW, UNUSED, BEST OF ITS RESPECTIVE KINDS, FREE FROMDEFECTS AND OF FIRST CLASS QUALITY. BASIS OF QUALITY SHALL BE BASED ON THE LATEST STANDARDS OF THE NFPA.PAMPHLET AND OTHER ACCEPTABLE STANDARDS.3. THE SPRINKLER SUBCONTRACTOR SHALL BE RESPONSIBLE FOR THEIR WORK UNTIL ITS COMPLETION AND FINALACCEPTANCE AND SHALL REPLACE ANY OF THE SAME WHICH MAY BE DAMAGED, LOST OR STOLEN WITHOUTADDITIONAL COST TO THE BUILDING OWNER OR TENANT.4. THE SPRINKLER SUBCONTRACTOR SHALL GUARANTEE ALL WORK PERFORMED AND MATERIALS INSTALLED BY THEMTO BE FREE FROM INHERENT DEFECTS, SHALL KEEP IN REPAIR AND REPLACE ANY DEFECTIVE MATERIALS AND/ORWORKMANSHIP, FREE OF COST TO THE TENANT OR LESSEE (OWNER) FOR A PERIOD OF ONE (1) YEAR AFTER THE FINALCOMPLETION OF THE WORK.5. ALL WORK SHALL BE DONE ACCORDING TO THE REQUIREMENTS OF ALL APPLICABLE CODES AND BUILDINGLANDLORD/TENANT LEASE CRITERIA (IF APPLICABLE) AND SHALL RECEIVE THE APPROVAL OF ALL AUTHORITIES HAVINGJURISDICTION. PREPARE ALL REQUIRED DOCUMENTS, DRAWINGS AND PERFORM ALL REQUIRED TESTS AND PAY ALLREQUIRED CHARGES TO OBTAIN THESE APPROVALS.6. THIS CONTRACTOR SHALL BE HELD TO HAVE EXAMINED THE SITE FOR THIS WORK AND REVIEWED THE DRAWINGSWITH THE TENANT'S GENERAL CONTRACTOR BEFORE HAVING SUBMITTED A PROPOSAL. NO ADDITIONAL COMPENSATIONWILL BE ALLOWED FOR CONDITIONS FOUND DURING THE COURSE OF THE CONTRACT.7. THIS CONTRACTOR MUST PROVIDE TENANT, BUILDING LANDLORD AND TENANT'S CONSTRUCTION REPRESENTATIVESWITH COPIES OF REQUIRED INSURANCE AND COPIES TO BE FURNISHED TO THE OWNER BEFORE COMMENCING WORK.8. PROVIDE CONTRACTORS NAME TO THE BUILDING OWNER, OWNER AND OWNER'S CONSTRUCTION REPRESENTATIVEFOR THEIR FILES.III. SCOPE OF WORK1. FURNISH ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND CONTRACTORS FOR A COMPLETE, SAFE INSTALLATIONOF SPRINKLER WORK IN FULL CONFORMITY WITH REQUIREMENTS OF ALL AUTHORITIES HAVING JURISDICTION ASINDICATED ON DRAWINGS AND/OR HEREIN SPECIFIED.IV. GENERAL ITEMS1. IF VALVES ARE NOW UTILIZED IN SYSTEM BUT NOT ALLOWED BY LAW, THEY ARE TO BE REMOVED AS REQUIRED.2. SPRINKLER SUBCONTRACTOR SHOULD VERIFY WITH LANDLORD ANY SPECIAL REQUIREMENTS, HOOKUPS, ALARMSYSTEMS IN PIPING, DRAIN DOWNS PER GENERAL CONTRACTOR'S REQUIREMENTS ETC., AND INCLUDE COST IN BID -ITEMIZE AND SPECIFY INCLUSIONS IN BID.3. PIPING SHALL NOT BE SUPPORTED FROM DUCTWORK, ELECTRICAL, MECHANICAL, PLUMBING, OR OTHER SPRINKLERPIPING. ONLY HANG FROM TOP FLANGES OF BEAMS AND TOP CHORDS AT PANEL POINTS OF JOISTS AND TRUSSES.4. TEST: TEST PIPING AND PROVE TIGHT FOR AT LEAST TWO HOURS BASED ON CODE OR BUILDING OWNER'SREQUIREMENTS AND IN ACCORDANCE WITH REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION AND/OR ASSPECIFIED. TEST SHALL BE PERFORMED IN THE PRESENCE OF BUILDING OWNER (IF REQUIRED) AND OWNER'SREPRESENTATIVE AND LOCAL INSPECTOR. TEST SHALL BE REPEATED IF NECESSARY UNTIL FINAL APPROVAL OFSYSTEM IS OBTAINED. TEST PIPING PER CODE REQUIREMENTS, BY FILLING WITH AIR UNDER PRESSURE FIRST.5. STERILIZATION OF SPRINKLER SYSTEM: IF REQUIRED BY LOCAL CODE OR LANDLORD'S CRITERIA, BEFORE SPRINKLERSYSTEM IS PLACED INTO SERVICE. ALL LINES SHALL BE CHLORINATED TO THE SATISFACTION OF REPRESENTATION (ASAPPLICABLE) IN ACCORDANCE WITH NFPA. STANDARDS.6. NOTCHING AND BORING OF STRUCTURAL STEEL MEMBERS IS NOT PERMITTED, WHEN HANGING FROM STRUCTURALSTEEL ONLY HANG FROM TOP FLANGE OF BEAMS AND TOP CHORDS ONLY AT PANEL POINTS OF JOISTS/TRUSSES.7. SPRINKLER CONTRACTOR TO FILE FOR PERMITS AND SUBMIT PLANS TO BUILDING DEPARTMENT FOR APPROVAL ANDSIGN-OFF. ALL BUILDING DEPARTMENT WORK FOR THIS CONTRACTORS SCOPE IS TO BE FILED BY THIS CONTRACTOR.V. BUILDING LANDLORD'S CRITERIA1. THE SPRINKLER CONTRACTOR IS TO BECOME FAMILIARIZED WITH BUILDING LANDLORD'S CRITERIA FOR THISLOCATION (IF APPLICABLE) AND INCLUDE ANY WORK REQUIRED OF THIS CRITERIA, WHICH IS NOT SPECIFICALLY NOTEDIN THESE DRAWINGS AND SPECIFICATIONS2. THE SPRINKLERS MUST BE A FULL-COVERAGE SYSTEM WHICH COMPLIES WITH ALL THE REQUIREMENTS OF NFPAPAMPHLET 13.3. SPECIAL ATTENTION MUST BE PAID TO SPRINKLER OBSTRUCTIONS INCLUDING STOCK FIXTURES AND VALANCES.4. THE 200 PSI, TWO-HOUR HYDROSTATIC TEST OF THE SYSTEM IS REQUIRED TO BE WITNESSED BY A REPRESENTATIVEOF THE BUREAU OF FIRE PREVENTION.5. A COMPLETED, CERTIFIED COPY OF THE "CONTRACTORS MATERIAL AND TEST CERTIFICATE" IS REQUIRED TO BETURNED INTO THE BUREAU OF FIRE PREVENTION.FIRE PROTECTION SPECIFICATIONSFIRE PROTECTION DESIGN CRITERIASALES AREA, BREAKROOM AND DISPENSARYCLASSIFICATIONORDINARY HAZARDGROUP 20.20 GPM / SQ. FT.DENSITYAREA OFCOVERAGE1500 SQ. FT.COVERAGE PERSPRINKLER130 SQ. FT.DISCHARGETEMPERATURE165°FMAXIMUMSPACING15 FEETHOSE STREAMALLOWANCE250 GPMOFFICES, HALLWAYS, EMPLOYEE, RECEPTION LOBBY, CASH ROOM AND RESTROOMSCLASSIFICATION0.10 GPM / SQ. FT.DENSITYAREA OFCOVERAGE1500 SQ. FT.COVERAGE PERSPRINKLER225 SQ. FT.DISCHARGETEMPERATURE165°FMAXIMUMSPACING15 FEETHOSE STREAMALLOWANCE100 GPMLIGHT HAZARDSTORAGECLASSIFICATION0.20 GPM / SQ. FT.DENSITYAREA OFCOVERAGE1500 SQ. FT.COVERAGE PERSPRINKLER130 SQ. FT.DISCHARGETEMPERATURE165°FMAXIMUMSPACING15 FEETHOSE STREAMALLOWANCE250 GPMORDINARY HAZARDGROUP 21NOTE: STORAGE SHELVING IS 9'-0" HIGH.18" CLEAR MUST BE MAINTAINED ABOVE SHELVING.Exp:_____________PRO F E S S OINAL
MECHANICALKEVIN K.HERBERTE
NGI
NEER-STATEOFNEVADANo.15894 3-31-21