Loading...
38A-092 Grove street wetland inspectionFrom: R LEVESQUE ASSOCIATES, INC 0986 (F) LETTER OF TRANSMITTAL Date: November 10, 2008 A Land nfficen.rlevecnneassociates.cnm 75 Broad To Planning Services Company Street, Suite C, Westfield, MA 01085 413 568 0985 (0) Northampton Conservation Commission Project No: 070802 Project Name: Grove Street, Northampton RE: Wetland Replication Field Inspection -Logs r, K 1 1 'ti 210 Main Street, Rm. 11, City Hall Northampton, MA 01060 'LUU) Attention: Mr. Bruce Young `ti' a t t We Are Transmitting Plans Specifications Report Form g to You: Under Separate I I C Cover VIA D1;�1 A`ttac�ed.; _r Approval Order Original of Subcontractor on Contract Drawings Field Copy of Letter Photographs Proposal Inspection Logs ►1 Other Number of Copies DWG./Revision Date Drawing Number Description 1 Field Inspection and photos dated 7/5/08 1 Field Inspection and photos dated 10/23/08 These are For Approval For Information For Action As Requested Remarks: Attached Transmitted as Noted Below: Approved as Submitted Approved as Noted For Corrections For Review and Comments Resubmit Copies for Approval Resubmit Copies for Distribution Return Corrected Prints are the Field Inspection Logs with photographs for the Wetland Replication Area at Lots 3 -5, Grove Street Northampton, MA. RLA is submitting the logs on behalf of the client, Mr. William Gruber, for your review. Robert M. Leves ue ASLA Copies To Mass DEP Wetlands Program —WERO Mr. William Gruber Note: If Enclosures are not By: as noted, please notify us at once. White: Addressee Yellow: Project Notebook Pink: Main File OBSERVATIONS: The wetland replication area has been graded. The earthwork has been conducted as designed, except for the creation of the rear berm. This field change was conducted to ensure the replication area would maintain hydric conditions. Per discussions with the Northampton Conservation Commission, an impervious liner was installed to provide an aquiclude in an effort to maintain hydric conditions due to sandy conditions encountered in the subsoil on -site. The lowering of the berm was discussed with Mr. Young in order to decrease the amount of standing water contained in the replication area. Some wetland vegetation has been observed, including Sensitive Fern, as shown in photos 2 and 4 attached herewith. COMMENTS OR ISSUES: The photographs of the replication area attached herewith were taken on 7/5/08, in the middle of the first growing season. The replication area was created using translocated wetland soils from a Massachusetts Highway Department site on Route 66. The wetland soils were anticipated to have a good seed bed, and it was RLA's recommendation to wait to see what vegetation was established. As mentioned above, the lowering of the rear berm was discussed due to concern with mosquitoes and safety concerns associated with a higher water level. This change was not made. RLA noticed that due to soil settling, the liner at the front (south) of the replication area was exposed. RLA instructed Mr. Gruber to provide additional fill at this location. This was repaired to our satisfaction. PHOTOS TAKEN YES X NO DESCRIBE PicturAs 1 -5 CONCLUSIONS: At the time of this inspection, the earthwork was consistent with the intent of the replication design, however further inspection will monitor the establishment of vegetation within the wetland and the level of standing water. NOTES: Further monitoring will be conducted at the end of the growing season to determine vegetation development. COPY LOG TO: MassDEP, Mr. William Gruber SITE: Replication Area for Lots 3 -5 Grove Street DATE: 07/05/08 ADDRESS: Grove St, Northampton, MA JOB 070802 SITE CONTACT: William Gruber PHONE: (413) 527 -2609 INSPECTOR: Robert M. Levesque, RLA, ASLA of R Levesque Associates, Inc (RLA) REASON FOR INSPECTION: Observe vegetation development FIELD INSPECTION REPORT FOR REPLICATION STATUS Loa #1 Inspection #1 View of replication area looking northeast 7/5/08 View of vegetation .resent including sensitive fern 7/5/08 75 Broad Street Suite C, P.O. Box 640, Westfield, MA 01085 Phone: 413-568-0985; Fax: 413-568-0986 robl@rlaland.com Field Inspection Photos Lots 3-5, Grove Street, Northampton, MA RLA Project 070802 Field Inspection Photos Lots 3 -5, Grove Street, Northampton, MA RLA Pro'ect 070802 View of standing water and vegetation .resent 7/5/08 75 Broad Street Suite C, P.O. Box 640, Westfield, MA 01085 Phone: 413 -568 -0985; Fax: 413 -568 -0986 robl @rlaland.com Edge of replication area with liner exposed, looking east 7/5/08 75 Broad Street Suite C, P.O. Box 640, Westfield, MA 01085 Phone: 413 -568 -0985; Fax: 413 -568 -0986 robl @rlaland.com Field Inspection Photos Lots 3 -5, Grove Street, Northampton, MA RLA Pro'ect 070802 OBSERVATIONS: The wetland replication area appears to be functioning and exudes a variety of hydrologic signs. Soil saturation is near the surface in most locations and standing water is present in some areas within the replication area. RLA is pleased with the establishment of vegetation from the translocated soils. Wetland plant species are beginning to encroach upon the area of standing water, including cattail, sensitive fern and bulrush. No invasive plant species were identified at the time of the inspection. The translocated soils appear to have a good seed bed, and it is anticipated that the replication area will continue to support a variety of wetland vegetation next growing season. COMMENTS OR ISSUES: The photographs of the replication area attached herewith were taken on 10/23/08, at the end of the growing season. As mentioned above, the vegetation is encroaching upon the area of standing water which may be better for safety concerns and it also provides habitat for amphibians and small mammals: PHOTOS TAKEN YES X NO DESCRIBE Pir:turAs 1 CONCLUSIONS: It is likely that the wetland replication area will meet the standard of 75% wetland vegetation by the end of the next growing season, per the WPA regulations found at 310 CMR 10.55 (4)(b) for general replication conditions. Further monitoring will be conducted at the end of the next growing season to determine vegetation development and regulatory compliance. NOTES: It is anticipated that at the end of the next growing season, a Certificate of Compliance will be sought for the subject property, pending compliance with all aspects of the Order of Conditions. COPY LOG TO: MassDEP, Mr. William Gruber SITE: Replication Area for Lots 3 -5 Grove Street DATE: 10/23/08 ADDRESS: Grove St, Northampton, MA JOB 070802 SITE CONTACT: William Gruber PHONE: (413) 527 -2609 INSPECTOR: Robert M. Levesque, RLA, ASLA of R Levesque Associates, Inc (RLA) REASON FOR INSPECTION: Observe vegetation development FIELD INSPECTION REPORT FOR REPLICATION STATUS Loo #2 Inspection #2 75 Broad Street Suite C, P.O. Box 640, Westfield, MA 01085 Phone: 413-568-0985; Fax: 413-568-0986 robl@rlaland.com Field Inspection Photos Lots 3-5, Grove Street, Northampton, MA RLA Project #070802 View of replication area looking northwest 10/23/08 t■ 75 Broad Street Suite C, P.O. Box 640, Westfield, MA 01085 Phone: 413-568-0985; Fax: 413-568-0986 robl@rlaland.com Field Inspection Photos Lots 3-5, Grove Street, Northampton, MA RLA Project #070802 View of replication area looking northwest 10/23/08 View of re lication area looking west 10/23/08 Field Inspection Photos Lots 3-5, Grove Street, Northampton, MA RLA Project #070802 I View of re lication area looking northeast 10/23/08 r N View of replication area looking east/northeast 10/23/08 75 Broad Street Suite C, P.O. Box 640, Westfield, MA 01085 Phone: 413-568-0985; Fax: 413-568-0986 robl@rlaland.com