Loading...
North Common Site plan Cover Letter Landscape Architecture Civil Engineering Planning Land Surveying 4 Allen Place ···· Northampton, MA 01060 ···· Telephone (413) 582-7000 ···· Facsimile (413-582-7005 ···· E-mail bdg@berkshiredesign.com December 8, 2017 Northampton Planning Board City Hall Northampton, MA 01060 Project: Village Hill Re: Lot 13A - Site Plan Review Submission Dear Planning Board Members: On behalf of The Community Builders Inc, we respectfully submit the enclosed Major Site Plan Application for the development of lot 13A located to the north of Ford Crossing at Village Hill, otherwise known as Map 31C, Parcel 017. This project proposes the construction of a new 3-story residential apartment building on the vacant site north of Ford Crossing. The entire parcel under consideration consists of roughly 41 acres however only about 5 acres are proposed for development. Remaining land will be split amongst protected conservation land (18 ac), a cohousing community (6.2 ac), and residential house lots along Ford Crossing (1 ac). The new 18,900 sq. ft. building will include 53 new 1,2, & 3 bedroom apartments, more than 20% of which will be affordable. The potential of pursuing passive house certification for the building is also being studied. The majority of the proposed site is located inside the existing tree line that surrounds the meadow area. Parking for the residents is provided via 35 car parking lot located to the north of the building as well as a small number of parallel spaces along the entry drive. A large open lawn, common space and community playground is proposed to the south of the building and will be accessible to the larger community. Site lighting will consist of LED fixtures similar in design to the existing street lights at Village Hill. Storm water from the building and parking/drive will be managed by a series of rain gardens located around the site. Any overflow will discharge to the existing detention pond (#2) located to the east of the project site. This detention pond was sized to accommodate some storm water flow from this and other nearby projects. A full analysis of the existing and proposed storm water system is being reviewed by the DPW and MassDevelopment to ensure compliance with existing permits. All other service utilities for the project will originate from the stubs provided at the end of Olander Drive. An extensive planting and landscape plan has been proposed which includes tree replacement as required by zoning. All of the existing “specimen trees” located within the project boundaries are being preserved as are most other trees of significance and proximate to the work site. Inevitably, some trees will need to be removed including those that are in poor and/or failing health. A detailed Tree Assessment Report prepared by a certified arborist has been included for review. A traffic study has not been provided due to the comprehensive traffic study provided during the larger permitting efforts for the redevelopment of the entire Northampton State Hospital property. Generally speaking, the anticipated vehicle trips generated by this project is much less than what was originally expected overall. Pedestrian connections into and across the site are being provided. This includes connections to the playground and open space south of the building to Ford Crossing, Olander Drive and to the multi-use trail systems on the east and western portions of Village Hill. These trail systems are also being extended or improved as part of this project. The building design and architecture is consistent with the Village Hill Design Guidelines and is in keeping with the current architectural styles at Village Hill. Mechanical units will be roof mounted and entirely hidden from view. As mentioned previously, the project team is exploring the potential of obtaining passive house certification is being studied. This may result in the addition of roof mounted solar panels which are not currently shown. This exciting project will provide new residential and affordable apartment units within an efficient, single building footprint. The reduced need for parking, extensive roadways and other utility infrastructure allow this project to maximize tree preservation and the amount of available open space which will offer opportunities to create amenities to serve the entire Village Hill community. We look forward to presenting the full scope of the project and answer any questions you might have at the next available public hearing. Sincerely, Jeffrey Squire, RLA