219001_Hempest Dispensary - NorthamptonMA - Initial Construction Control Document - Architectural -STAMPEDInitial Construction Control Document
a To be submitted with the building permit application by a
a Registered Design Professional
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Hempest Dispensary Renovations Date: January 13, 2020 Project No. 219001
Property Address: 2 Conz Street, Northampton, MA 01067
Project: Check (x) one or both as applicable: New construction (X) Existing Construction
Project description: Renovation of existing 2,228 sq. ft., type VB building for the expansion of existing
Hempest tenant space. New Hempest space to house cannabis dispensary w/ office spaces & access. restroom.
I Jill S. Peebles MA Registration Number: 20571 Expiration date: 08/31/2020, am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning':
(X) Architectural Structural Mechanical
Fire Protection Electrical Other:
for the above named project and that to the best of my knowledge, information, and belief such plans,
computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780
CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my
designee) shall perform the necessary professional services and be present on the construction site on a regular
and periodic basis to:
1. Review, for conformance to this code and the design concept, shop drawings, samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work is being performed in a manner consistent
with the approved construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
When required by the building official, I shall submit field/ progress reports (see item 3.) together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the building official a 'Final Construction Control Document'.
Enter in the space to the right a "wet" or
electronic signature and seal:
Phone number: (508) 583-5603 X307
Building Official Name:
Email: jpeebles@bkaarchs.com
Building Official Use Only
Permit No.: Date:
D Afte
► 6 pEEa. a
No. 205]0. 11 N
TH OF
Note 1. Indicate with an 'x' project design plans, computations and specifications that you prepared or directly supervised. If 'other' is
chosen, provide a description.
Version 0101 2018