193 EMERSON WAY Water Avail Water AvailX
X X
(Applicant to fill out the above)
Municipal Water Main in Front of Location:Yes x No
Existing service to site?x No
Size of Water Main:Material:
Approximate Static Street Pressure:Yes No x
Size of Service Connection:
*Water Entry x ($1,250) Domestic 450
($2,500) Subdivision
(Includes fire line if required)
cc:
Location:
connection activity associated with this application.
586-8600
A Department of Public Works Trench Permit shall be required prior to any construction or
193 EMERSON WAY
237 Prospect St.
413-587-1097
KEITER BUILDERS BRYNN
MUNICIPAL WATER AVAILABILITY APPLICATION
Northampton Water Department Director
Northampton, MA 01060
Rental
Type of Ownership:
Inquiry Made By:
Date of Inquiry:Fire Line
Multi-Family
Number of Units:
(Telephone Number)
5/8"
2015Age:
1"Suggested Meter Size:
Type of Units:
Single Family
(If flow test conducted attach results)
Commercial
55 psi
(Date)(Water Superintendent)
Condo
Yes
- A corresponding water enterance fee shall be paid prior to making any connection to the municipal
water system.
Domestic
(Name)
Private
6/9/20
1
6/9/20
- All work shall conform to Northampton Water Department specifications.
David Sparks
Flow Test Conducted:
8"
Irrigation
*Radio Read
Ductile Iron
- Arrangement of such installation shall be made with the Northampton Water Department within a
minimum of 5 working days notification.
Apartments
Comments:The Water Department cannot guarantee adequate water pressure during
peak demand times at elevations above 320'
*Fees will be charged based on current fee structure at the time of entry application
*Meter $
(fee to be determined)
NOTE: If this availablitiy is for a new construction, it must be hand delivered to the Building
Inspector
City of Northampton Building Dept./Commissioner
$150