Loading...
193 EMERSON WAY Water Avail Water AvailX X X (Applicant to fill out the above) Municipal Water Main in Front of Location:Yes x No Existing service to site?x No Size of Water Main:Material: Approximate Static Street Pressure:Yes No x Size of Service Connection: *Water Entry x ($1,250) Domestic 450 ($2,500) Subdivision (Includes fire line if required) cc: Location: connection activity associated with this application. 586-8600 A Department of Public Works Trench Permit shall be required prior to any construction or 193 EMERSON WAY 237 Prospect St. 413-587-1097 KEITER BUILDERS BRYNN MUNICIPAL WATER AVAILABILITY APPLICATION Northampton Water Department Director Northampton, MA 01060 Rental Type of Ownership: Inquiry Made By: Date of Inquiry:Fire Line Multi-Family Number of Units: (Telephone Number) 5/8" 2015Age: 1"Suggested Meter Size: Type of Units: Single Family (If flow test conducted attach results) Commercial 55 psi (Date)(Water Superintendent) Condo Yes - A corresponding water enterance fee shall be paid prior to making any connection to the municipal water system. Domestic (Name) Private 6/9/20 1 6/9/20 - All work shall conform to Northampton Water Department specifications. David Sparks Flow Test Conducted: 8" Irrigation *Radio Read Ductile Iron - Arrangement of such installation shall be made with the Northampton Water Department within a minimum of 5 working days notification. Apartments Comments:The Water Department cannot guarantee adequate water pressure during peak demand times at elevations above 320' *Fees will be charged based on current fee structure at the time of entry application *Meter $ (fee to be determined) NOTE: If this availablitiy is for a new construction, it must be hand delivered to the Building Inspector City of Northampton Building Dept./Commissioner $150