36-180 (7) 103 DUNPHY DR BP-2021-0053
GIS#: COMMONWEALTH OF MASSACHUSETTS
Map:Block:36- 180 CITY OF NORTHAMPTON
Lot:-001 PERSON'S CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: shed BUILDING PERMIT
Permit# BP-2021-0053
Proiect# JS-2021-000082
Est.Cost:
Fee: $30.00 PERMISSION IS HEREBY GRANTED TO:
Const.Class: Contractor: License:
Use Group: Homeowner as Contractor
Lot Size(sq.ft.): 14984.64 Owner: PATEL SONIYA M&MAHESH
zoning: Applicant: PATEL SONIYA M & MAHESH
AT. 103 DUNPHY DR
Applicant Address: Phone: Insurance:
103 DUNPHY DR
FLORENCEMA01062 ISSUED ON.7/20/2020 0:00:00
TO PERFORM THE FOLLOWING WORK:8X12 SHED
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 7/20/2020 0:00:00 $30.00
212 Main Street, Phone(413)587-1240, Fax:(413)587-1272
Louis Hasbrouck—Building Commissioner
-� City of Northampton
y` Massachusetts
o n r t "
DSPARTAlSNT OF BUILDING INSPECTIONS
212 Main Street • Municipal Building E
oro ' Northampton, MA 01060 „
C==
D
O y p
CESSORY STRUCTURE PERMIT APPLICATION
(For freestanding structures less than 200 sq. ft., at least 5 feet from any other structure)
Check#
PLEASE TYPE OR PRINT ALL INFORMATION
1. Name of Applicant: 5D I LY P I^- l ' P0-'-F[--- L
Address: I A P I� Telephone: 413 " 5 6(0+90.
2. Own#rofVvnpeetjq 50v�-----
Address: 5 G w e Telephone:
3. Status of Applicant:3e::�b ner_Contractor
4. Structure Location: Ls�)Cd
Parcel IQ:Zoning Map# �Parcel # , lJ a District(s)
(TO BE FILLED IN BY THE BUILDING DEPARTMENT)
5. Usvi�of Property:Single r Two Family: Multifamily: Commercial:
6. Description of Proposed Structure:
One StoryShed under 2"sq.ft- frestanding Deck under 200 sq.ft.,less than 30"above grade:
SIZE OF STRUCTURE:
Other(describe):
7. Attached Plans:Sketch Plaw'�Site Plan Plot Plan
8. Does the site contain a brook, body of water or wetlands? NOIZDON'T KNOW YES
IF YES: Has a permit been, or need to be, obtained from the Conservation Commission?
Needs to be obtained Obtained , Date issued
CONTINUED ON NEXT PAGE
qr
f
9. ALL INFORMATION MUST BE COMPLETED; PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION.
This column to be filled in by
the Building Department
Existing Proposed Required by Zoning
Lot lize
Frontage N/A N/A N/A
Front:
Setbacks: Side: g�
Rear:
Height
V
% Open space:
(Lot area minus bldg and
paved parking)
10.Certafication: I hereby certify that the information contained herein is true and accurate to
the best of my knowledge.
DATE: °� APPLICANT'S SIGNATURE
NOTE: Issuance of a permit does not relieve an applicant's burden to comply with all zoning requirements
and obtai4 all required permits from the Conservation Commission, Department of Public Works and other
applicable permit granting authorities
DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41F42AA
50,
�16_ TUFF SHED' .. ���6� ���� ��
.......
IIU A Ir '
VVIIrl I I W awlxr imu
L11 TYPES OF 811.1111ILDiNG PURt,HA FS 3
There are two main types of TUFF SHED building purchases. Your building will be here before you know it.
Most purchases are new buildings,with components Now it's time to prepare the site and yourself for the
fabricated at our factories,then transported to the upcoming installation:
customer's site where the building is assembled and • Prepare the Job Site—Clean the site of all debris(i.e.old
installed. tree stumps,trash,dog waste,etc)and a pathway to and ,
A small percentage of purchases are buildings that have from where the delivery vehicle parks.
been used as displays.In these cases,the fully assembled • Review Access to Delivery Area—For new buildings,
building is picked up,then transported to the customer's installers will need to carry building components in large
site where it is delivered into place via tilt-bed trailer. sections to the assembly/installation site. If fence gate
This document outlines what to expect with both types of has a top"bar",please measure the height and width of
purchases. the gate opening and provide us with this info prior to
Items that are specific to display buildings are installation.
notated with this icon. • Identify and Mark Underground Utilities-When choosing
the location of the building,the customer must take into
account any underground utilities that may be impacted
i
• r.rr. a-ev..e.:vim r-r+.c -.y_:
by the delivery or installation of the building. It is the
You've decided on the building style,size and design. customer's responsibility to have marked all underground
Important planning remains for you and for us,including: utilities that will affect the delivery/installation site.
• Review your Building Order—This tells us how to fabricate Remember that these buildings and delivery trucks are
your building,where to place items and what colors to use heavy,and that if your building was purchased with earth
for shingles and paint(if you've selected this upgrade). anchors,that these anchors will be driven into the ground
Ifyou Purchased a Display Building—Display at a typical depth range of up to three feet deep.Many
buildings are sold in"as is"condition, and can include municipalities will help you locate underground electrical,
wear and tear that ranges from minor blemishes natu raI gas,fiber optic,cable TV and sewer.They general I
to more significant issues such as damaged trim, will not be able to help you mark location of sprinkler
missing shingles or bent or dented floor joists. heads, underground irrigation,or septic tanks/drain fields.
Display purchases are discounted to reflect their , For display building purchases, the building will be
condition. We recommend inspecting the building delivered into place via a heavy-duty truck and long,
first-hand to determine for yourself if the display's tilt-bed trailer. The truck and trailer MUST have a clear
condition is acceptable. 12'wide, relatively straight path from paved road,
• Vents-We strongly recommend adding vents to your as trailers are unable to make tight turns,similar to
building.Along with paint and roofing,there may be no a boat trailer or camper. Itis vitally important that
other feature that can help your building perform better there are NOT obstacles which cannot be navigated
• Insulation-If you are planning to insulate or finish the around,such as fences, trees, branches,playsets or
inside of your building,we need to know so that we can underground septic systems.
design the building to perform as an insulated structure. Don't Over-Irrigate Prior to Delivery—This is
• Building Permit(s)/HOA Requirements—Customers especially true ifyour building is a display building,
need to confirm with their HOA and/or municipality for as our delivery vehicles are heavy,and can leave tire
appropriate building permit and setbacks requirements. tracks when driving across grass or other vegetation.
.,,, Ak-1- • Srherlulinn—IfwPhaven'tsr.hpdiilpdalrPadv.nivPlis
DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41F42AA
• Pre-fabrication-For new building purchases,we will ;
beg iri pre-fabricating your building several days in
advance of the installation. For many installs,we begin 3
pre-fabrication 5 business days before installation.Our
outbound locations may begin manufacturing 10-12
business days before installation.At this time,we will
begin placing the rough openings for items like doors,
windows and vents.
Restocking/Rescheduling Fee-If changes or
cancellation occurs within pre-fabrication period,a i
,�,w.,rP - ::;;r; s :--
..
restocking/rescheduling or cancellation fee may apply.At
this point,building materials have already been ordered, Buildings used as displays will be leveled by placing
inventoried and have potentially been pre-fabricated, concrete blocks and wooden shims under the
specific to your design. perimeter floorjoists only. Display buildings may also
include wood skids under the floor joists, which will
not be removed or leveled upon delivery.See figure 3.
Check out our video at tuffshed.com/leveling
It's important that buildings are constructed on a level
site. Providing a clean and level site is the customer's
responsibility.However,for a reasonable fee,TUFF SHED can
help create a level building foundation by adding concrete .. j
blocks and wood shims beneath the structure. 1
TUFF SHED does NOT dig into the ground to level
a building.
If a small amount of leveling is necessary(up to 4"),it will be
provided by TUFF SHED at no charge.If more substantial
leveling is required,the customer must choose between
paying TUFF SHED an additional fee for leveling using — �- - -----
the concrete block and wood shim method,or having the
ground leveled by someone other than TUFF SHED.
i"YOUR SITE
TUFF SHED charges for leveling vary by severity of site ' OW OiIr a3 °r ' LEVEL
condition and building size.See Figure 1. To accomplish this,you will need wood stakes and a string
up to 2W&t >2W&t bubble level and long piece of nylon string,OR a carpenter's
Inches 5"-8"Out $150 Bid Only level and a long,straight 2x4.The string or 2x4 must be
Out of 9"-12"Out $200 Bid only longer than the distance from the high point corner to the
Level >12"Out Bid Only Bid Only other three corners.
Determine where the building will be placed,then drive a
stake into each of the four corners and determine which of
the corners appear to be the highest and the lowest points.
At the high point stake place the string or 2x4(short-edge
_ W down)on the ground and fasten it(i.e.tie or clamp)to the
#y high point stake.
�r Then position the opposite end of the string or 2x4 at the
I <Pnas-.renyofsLrt�ce-arri,T� low point stake.Using the string or 2x4 and the level, raise
or lower the string or 2x4 at the low point stake until the
Blocking up or"shimming"a building is not always the best level bubble floats exactly centered between the two vertical
solution from an appearance standpoint. Please consider lines in the center glass vile. Now measure the distance from
the appearance and your long term satisfaction in the the ground to the bottom edge of the string or 2x4.This is
1....1 .Jt.-......4.... .V_ . ._,..
16._ �.,.._���... .J_-!-!-- r_..I�.... n
DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41 F42AA
process for the other two corners, measuring again from the • Please have someone over the age of 18 at home.
high point corner,writing down your measurements. • An out of level site will force our installers to stop work and
Now you can determine the distance your build site is out of collect an additional leveling fee prior to resuming.
level and select a method to level the site. • Our installers will need a power source so they can plug in
High Point Low Point the compressors that power their tools.
Stake Stake . Inspect the building before the installers leave for the day.
out�-
Inchesn • It may surprise you—but like most home builders,the
weather seldom interferes with installation.
String String Level Rain,snow,and sleet will most likely not prevent
installation and will not damage the structure during
installation.Ask for details.
The type of roof truss that comes standard with your
building will vary by the roof type,pitch(steepness)and If you have selected the paint upgrade on a new building,
building width.This is especially important on buildings then TUFF SHED will paint your building.Here's our
-starting at 12'wide as these trusses include a bottom painting process:
chord or collar tie(see diagrams below)that can impact the • Before being transported to the building site,the first
amount of usable space overhead, coat of paint is applied at our factories by roller to exterior
.See truss examples here and contact the TUFF SHED factory siding and trim surfaces.
with questions. • The second coat of paint is applied during on-site
installation.A Seasonal Second Coat Paint Discount is
available in select winter markets during cold/wet months,
If this discount has been applied to your order,then the
installers will not apply the second coat of paint to your
�r-+rreons
building during installation regardless of weather at the
time of install.
_._.____.__ __._____ ___ • Customers who have received our Seasonal Second Coat
Paint Discount will be provided with siding and trim paint,
a roller and two small brushes.These customers should
apply the second coat of paint to their building on a dry
day when the temperature is higher than 35 degrees.
Display buildings received the first and second coats
m of paint prior to being put into service as a display.No
additional painting will be included in the purchase.
Your TUFF SHED building will need routine care&
maintenance to ensure the building withstands things
like weather and wear&tear over time:
,,,� ;;, , „ ;;;�; ,,;,;; • Keep your Building on the Level-When normal
__..r., ground settling occurs,it can affect your TUFF SHED
--Your TUFF SHED building is about to become a reality. building,making it difficult to open,close or latch the
Important details for installation day: door.This is not a warranty issue,but in most cases,
• Our installers will arrive on the site,unload materials and the building can be easily re-leveled by the customer
components,and begin to assemble your building. or for a reasonable fee by TUFF SHED.
� Ifyoupurchased adisplay building, our delivery driver • Protect your Floor—Do not add ru bber mats or vi nyl
will arrive on the site,reviewyour desired building flooring inside as they can create a serious moisture and
wJ� i
DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41F42AA
• Redirect Water—Water is the enemy of most structures.
Talo care to redirect water from your building whenever • Most of our sheds include 16-gauge, hot-dipped
possible. Rainwater runoff from other structures and galvanized steel floorjoists,which are designed to be
misdirected irrigation systems can damage your placed directly on any firm,level surface.
TUFF SHED building,and is not covered by warranty. • White"Chalking"on the Steel—This appearance is normal
• Re-paint Regularly—Painting is one of the easiest ways and does not affect the performance of the steel or the
to protect the exterior wood surfaces of a TUFF SHED 40-year industry-rating on the material.
building.Your building's warranty coverage requires
that the building be re-painted every five years.
We recommend using high quality materials like
Glidden Paints.
EV
t,
�t
W • Exposed Steel—These ioists are designed to withstand
V- ____ ____ � the elements and are exposed after installation.
. ----- - = Some customers prefer to cover the steel with"skirting"
made from siding.While we can add a skirting,we don't
recommend it,since wood siding material contacting the
ground can wick up moisture into the building.
_ . .. . _ _ • Small Rectangular Holes in the Steel—During production,
Wondering about the appearance of a certain feature small vent holes are punched into the steel.These holes
of your TUFF SHED building? allow for airflow beneath the building.Snap-in screen
This information can help you better understand why vents are available as an inexpensive upgrade.
-some components look the way they do.
• We use dimensional lumber for wall and roof framing that
has been dried,then stored in a controlled environment
Display buildings are sold in 'as is"condition, which (our factories)prior to installation. It is unlikely that this
can vary,ranging from minor blemishes like faded wood will have a uniform appearance,and may have
paint to more significant issues such as damaged blemishes or"waning and knots".This is normal and will
trim,missing shingles,and dented or bent floorjoists, not affect the structural integrity of the building.
• It's not a mistake that nails are poking through the roof
on the inside of your building.This is necessary due to -
binding codes requiring shingle nails to"pierce the roof
decking material"and does not affect the performance of y '
the roof.
t
--_.. ..
n
—
f
• We strive to make the building weathertight.But they are
_ not airtinht Air and mina nan infiltrate vni it hi d1 dinn aq
DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41F42AA Sonja patel
TUFFSHER 103 dunphy drivebay state village
florence MA 01062
Q-610470
Wall D
µ
Wall A _ M°� Wall C
Wall B
Base Details Options Details Jobsite/Installer Details
Building Size&Style Vents Do you plan to insulate this building after Tuff Shed
SR-600-8'wide by 12'long 16"x8"Wall Vent-White installs it?
Door No
4'x 67"Single Shed Door,Left Hinge Is there a power outlet within 100 feet of installation
Placement location?
Paint Selection Yes
Base:Brick Dust,Trim:Delicate White The building location must be level to property install the
Roof Selection building.How level is the install location?
Nickel Gray 3 Tab Within 4"of level
Drip Edge Will there be 18"of unobstructed workspace around the
White perimeter of all four walls?
Yes
Can the installers park their pickup truck&trailer within
approximately 200'of your installation site?
Yes
Substrate Shed will be installed on?
Grass
DocuSigned by:
Customer Signature: I�' Date: 741542020
94347F375550445..
DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41 F42AA
TUFF SHED'
Sales Order
Location: CHICOPEE 1#660 14133550262 Scheduled Date: 12/31/2040
Factory Location: Derry j#660 1603-421-6873 Created Date: 07/14/2020
John O'Keefe i(781)708-6217 sonja Patel
Prepared by: jokeefe@tuffshed,com Customer p. (413)306-8439 1 c.
soniyapatell4l4@gmaii.com
SF SO 00355478
Special Instructions: HD Store If
Customer PO
JDE SO 1523143
103 dunphy drivebay state village
Serial Number: Ship to Address florence,MA 01062
u5
SR-600 8 x 12 1.00
PAINT SR-600 MR-450 KR-600 8'WIDE 1.00
16"x8"Wall Vent-White 1.00
DocuSigned by:
��---u4347F3L5550445 7/15/2020
Customer Signature Date
� p-�--DS