Loading...
36-180 (7) 103 DUNPHY DR BP-2021-0053 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block:36- 180 CITY OF NORTHAMPTON Lot:-001 PERSON'S CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: shed BUILDING PERMIT Permit# BP-2021-0053 Proiect# JS-2021-000082 Est.Cost: Fee: $30.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: Homeowner as Contractor Lot Size(sq.ft.): 14984.64 Owner: PATEL SONIYA M&MAHESH zoning: Applicant: PATEL SONIYA M & MAHESH AT. 103 DUNPHY DR Applicant Address: Phone: Insurance: 103 DUNPHY DR FLORENCEMA01062 ISSUED ON.7/20/2020 0:00:00 TO PERFORM THE FOLLOWING WORK:8X12 SHED POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 7/20/2020 0:00:00 $30.00 212 Main Street, Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner -� City of Northampton y` Massachusetts o n r t " DSPARTAlSNT OF BUILDING INSPECTIONS 212 Main Street • Municipal Building E oro ' Northampton, MA 01060 „ C== D O y p CESSORY STRUCTURE PERMIT APPLICATION (For freestanding structures less than 200 sq. ft., at least 5 feet from any other structure) Check# PLEASE TYPE OR PRINT ALL INFORMATION 1. Name of Applicant: 5D I LY P I^- l ' P0-'-F[--- L Address: I A P I� Telephone: 413 " 5 6(0+90. 2. Own#rofVvnpeetjq 50v�----- Address: 5 G w e Telephone: 3. Status of Applicant:3e::�b ner_Contractor 4. Structure Location: Ls�)Cd Parcel IQ:Zoning Map# �Parcel # , lJ a District(s) (TO BE FILLED IN BY THE BUILDING DEPARTMENT) 5. Usvi�of Property:Single r Two Family: Multifamily: Commercial: 6. Description of Proposed Structure: One StoryShed under 2"sq.ft- frestanding Deck under 200 sq.ft.,less than 30"above grade: SIZE OF STRUCTURE: Other(describe): 7. Attached Plans:Sketch Plaw'�Site Plan Plot Plan 8. Does the site contain a brook, body of water or wetlands? NOIZDON'T KNOW YES IF YES: Has a permit been, or need to be, obtained from the Conservation Commission? Needs to be obtained Obtained , Date issued CONTINUED ON NEXT PAGE qr f 9. ALL INFORMATION MUST BE COMPLETED; PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION. This column to be filled in by the Building Department Existing Proposed Required by Zoning Lot lize Frontage N/A N/A N/A Front: Setbacks: Side: g� Rear: Height V % Open space: (Lot area minus bldg and paved parking) 10.Certafication: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. DATE: °� APPLICANT'S SIGNATURE NOTE: Issuance of a permit does not relieve an applicant's burden to comply with all zoning requirements and obtai4 all required permits from the Conservation Commission, Department of Public Works and other applicable permit granting authorities DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41F42AA 50, �16_ TUFF SHED' .. ���6� ���� �� ....... IIU A Ir ' VVIIrl I I W awlxr imu L11 TYPES OF 811.1111ILDiNG PURt,HA FS 3 There are two main types of TUFF SHED building purchases. Your building will be here before you know it. Most purchases are new buildings,with components Now it's time to prepare the site and yourself for the fabricated at our factories,then transported to the upcoming installation: customer's site where the building is assembled and • Prepare the Job Site—Clean the site of all debris(i.e.old installed. tree stumps,trash,dog waste,etc)and a pathway to and , A small percentage of purchases are buildings that have from where the delivery vehicle parks. been used as displays.In these cases,the fully assembled • Review Access to Delivery Area—For new buildings, building is picked up,then transported to the customer's installers will need to carry building components in large site where it is delivered into place via tilt-bed trailer. sections to the assembly/installation site. If fence gate This document outlines what to expect with both types of has a top"bar",please measure the height and width of purchases. the gate opening and provide us with this info prior to Items that are specific to display buildings are installation. notated with this icon. • Identify and Mark Underground Utilities-When choosing the location of the building,the customer must take into account any underground utilities that may be impacted i • r.rr. a-ev..e.:vim r-r+.c -.y_: by the delivery or installation of the building. It is the You've decided on the building style,size and design. customer's responsibility to have marked all underground Important planning remains for you and for us,including: utilities that will affect the delivery/installation site. • Review your Building Order—This tells us how to fabricate Remember that these buildings and delivery trucks are your building,where to place items and what colors to use heavy,and that if your building was purchased with earth for shingles and paint(if you've selected this upgrade). anchors,that these anchors will be driven into the ground Ifyou Purchased a Display Building—Display at a typical depth range of up to three feet deep.Many buildings are sold in"as is"condition, and can include municipalities will help you locate underground electrical, wear and tear that ranges from minor blemishes natu raI gas,fiber optic,cable TV and sewer.They general I to more significant issues such as damaged trim, will not be able to help you mark location of sprinkler missing shingles or bent or dented floor joists. heads, underground irrigation,or septic tanks/drain fields. Display purchases are discounted to reflect their , For display building purchases, the building will be condition. We recommend inspecting the building delivered into place via a heavy-duty truck and long, first-hand to determine for yourself if the display's tilt-bed trailer. The truck and trailer MUST have a clear condition is acceptable. 12'wide, relatively straight path from paved road, • Vents-We strongly recommend adding vents to your as trailers are unable to make tight turns,similar to building.Along with paint and roofing,there may be no a boat trailer or camper. Itis vitally important that other feature that can help your building perform better there are NOT obstacles which cannot be navigated • Insulation-If you are planning to insulate or finish the around,such as fences, trees, branches,playsets or inside of your building,we need to know so that we can underground septic systems. design the building to perform as an insulated structure. Don't Over-Irrigate Prior to Delivery—This is • Building Permit(s)/HOA Requirements—Customers especially true ifyour building is a display building, need to confirm with their HOA and/or municipality for as our delivery vehicles are heavy,and can leave tire appropriate building permit and setbacks requirements. tracks when driving across grass or other vegetation. .,,, Ak-1- • Srherlulinn—IfwPhaven'tsr.hpdiilpdalrPadv.nivPlis DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41F42AA • Pre-fabrication-For new building purchases,we will ; beg iri pre-fabricating your building several days in advance of the installation. For many installs,we begin 3 pre-fabrication 5 business days before installation.Our outbound locations may begin manufacturing 10-12 business days before installation.At this time,we will begin placing the rough openings for items like doors, windows and vents. Restocking/Rescheduling Fee-If changes or cancellation occurs within pre-fabrication period,a i ,�,w.,rP - ::;;r; s :-- .. restocking/rescheduling or cancellation fee may apply.At this point,building materials have already been ordered, Buildings used as displays will be leveled by placing inventoried and have potentially been pre-fabricated, concrete blocks and wooden shims under the specific to your design. perimeter floorjoists only. Display buildings may also include wood skids under the floor joists, which will not be removed or leveled upon delivery.See figure 3. Check out our video at tuffshed.com/leveling It's important that buildings are constructed on a level site. Providing a clean and level site is the customer's responsibility.However,for a reasonable fee,TUFF SHED can help create a level building foundation by adding concrete .. j blocks and wood shims beneath the structure. 1 TUFF SHED does NOT dig into the ground to level a building. If a small amount of leveling is necessary(up to 4"),it will be provided by TUFF SHED at no charge.If more substantial leveling is required,the customer must choose between paying TUFF SHED an additional fee for leveling using — �- - ----- the concrete block and wood shim method,or having the ground leveled by someone other than TUFF SHED. i"YOUR SITE TUFF SHED charges for leveling vary by severity of site ' OW OiIr a3 °r ' LEVEL condition and building size.See Figure 1. To accomplish this,you will need wood stakes and a string up to 2W&t >2W&t bubble level and long piece of nylon string,OR a carpenter's Inches 5"-8"Out $150 Bid Only level and a long,straight 2x4.The string or 2x4 must be Out of 9"-12"Out $200 Bid only longer than the distance from the high point corner to the Level >12"Out Bid Only Bid Only other three corners. Determine where the building will be placed,then drive a stake into each of the four corners and determine which of the corners appear to be the highest and the lowest points. At the high point stake place the string or 2x4(short-edge _ W down)on the ground and fasten it(i.e.tie or clamp)to the #y high point stake. �r Then position the opposite end of the string or 2x4 at the I <Pnas-.renyofsLrt�ce-arri,T� low point stake.Using the string or 2x4 and the level, raise or lower the string or 2x4 at the low point stake until the Blocking up or"shimming"a building is not always the best level bubble floats exactly centered between the two vertical solution from an appearance standpoint. Please consider lines in the center glass vile. Now measure the distance from the appearance and your long term satisfaction in the the ground to the bottom edge of the string or 2x4.This is 1....1 .Jt.-......4.... .V_ . ._,.. 16._ �.,.._���... .J_-!-!-- r_..I�.... n DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41 F42AA process for the other two corners, measuring again from the • Please have someone over the age of 18 at home. high point corner,writing down your measurements. • An out of level site will force our installers to stop work and Now you can determine the distance your build site is out of collect an additional leveling fee prior to resuming. level and select a method to level the site. • Our installers will need a power source so they can plug in High Point Low Point the compressors that power their tools. Stake Stake . Inspect the building before the installers leave for the day. out�- Inchesn • It may surprise you—but like most home builders,the weather seldom interferes with installation. String String Level Rain,snow,and sleet will most likely not prevent installation and will not damage the structure during installation.Ask for details. The type of roof truss that comes standard with your building will vary by the roof type,pitch(steepness)and If you have selected the paint upgrade on a new building, building width.This is especially important on buildings then TUFF SHED will paint your building.Here's our -starting at 12'wide as these trusses include a bottom painting process: chord or collar tie(see diagrams below)that can impact the • Before being transported to the building site,the first amount of usable space overhead, coat of paint is applied at our factories by roller to exterior .See truss examples here and contact the TUFF SHED factory siding and trim surfaces. with questions. • The second coat of paint is applied during on-site installation.A Seasonal Second Coat Paint Discount is available in select winter markets during cold/wet months, If this discount has been applied to your order,then the installers will not apply the second coat of paint to your �r-+rreons building during installation regardless of weather at the time of install. _._.____.__ __._____ ___ • Customers who have received our Seasonal Second Coat Paint Discount will be provided with siding and trim paint, a roller and two small brushes.These customers should apply the second coat of paint to their building on a dry day when the temperature is higher than 35 degrees. Display buildings received the first and second coats m of paint prior to being put into service as a display.No additional painting will be included in the purchase. Your TUFF SHED building will need routine care& maintenance to ensure the building withstands things like weather and wear&tear over time: ,,,� ;;, , „ ;;;�; ,,;,;; • Keep your Building on the Level-When normal __..r., ground settling occurs,it can affect your TUFF SHED --Your TUFF SHED building is about to become a reality. building,making it difficult to open,close or latch the Important details for installation day: door.This is not a warranty issue,but in most cases, • Our installers will arrive on the site,unload materials and the building can be easily re-leveled by the customer components,and begin to assemble your building. or for a reasonable fee by TUFF SHED. � Ifyoupurchased adisplay building, our delivery driver • Protect your Floor—Do not add ru bber mats or vi nyl will arrive on the site,reviewyour desired building flooring inside as they can create a serious moisture and wJ� i DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41F42AA • Redirect Water—Water is the enemy of most structures. Talo care to redirect water from your building whenever • Most of our sheds include 16-gauge, hot-dipped possible. Rainwater runoff from other structures and galvanized steel floorjoists,which are designed to be misdirected irrigation systems can damage your placed directly on any firm,level surface. TUFF SHED building,and is not covered by warranty. • White"Chalking"on the Steel—This appearance is normal • Re-paint Regularly—Painting is one of the easiest ways and does not affect the performance of the steel or the to protect the exterior wood surfaces of a TUFF SHED 40-year industry-rating on the material. building.Your building's warranty coverage requires that the building be re-painted every five years. We recommend using high quality materials like Glidden Paints. EV t, �t W • Exposed Steel—These ioists are designed to withstand V- ____ ____ � the elements and are exposed after installation. . ----- - = Some customers prefer to cover the steel with"skirting" made from siding.While we can add a skirting,we don't recommend it,since wood siding material contacting the ground can wick up moisture into the building. _ . .. . _ _ • Small Rectangular Holes in the Steel—During production, Wondering about the appearance of a certain feature small vent holes are punched into the steel.These holes of your TUFF SHED building? allow for airflow beneath the building.Snap-in screen This information can help you better understand why vents are available as an inexpensive upgrade. -some components look the way they do. • We use dimensional lumber for wall and roof framing that has been dried,then stored in a controlled environment Display buildings are sold in 'as is"condition, which (our factories)prior to installation. It is unlikely that this can vary,ranging from minor blemishes like faded wood will have a uniform appearance,and may have paint to more significant issues such as damaged blemishes or"waning and knots".This is normal and will trim,missing shingles,and dented or bent floorjoists, not affect the structural integrity of the building. • It's not a mistake that nails are poking through the roof on the inside of your building.This is necessary due to - binding codes requiring shingle nails to"pierce the roof decking material"and does not affect the performance of y ' the roof. t --_.. .. n — f • We strive to make the building weathertight.But they are _ not airtinht Air and mina nan infiltrate vni it hi d1 dinn aq DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41F42AA Sonja patel TUFFSHER 103 dunphy drivebay state village florence MA 01062 Q-610470 Wall D µ Wall A _ M°� Wall C Wall B Base Details Options Details Jobsite/Installer Details Building Size&Style Vents Do you plan to insulate this building after Tuff Shed SR-600-8'wide by 12'long 16"x8"Wall Vent-White installs it? Door No 4'x 67"Single Shed Door,Left Hinge Is there a power outlet within 100 feet of installation Placement location? Paint Selection Yes Base:Brick Dust,Trim:Delicate White The building location must be level to property install the Roof Selection building.How level is the install location? Nickel Gray 3 Tab Within 4"of level Drip Edge Will there be 18"of unobstructed workspace around the White perimeter of all four walls? Yes Can the installers park their pickup truck&trailer within approximately 200'of your installation site? Yes Substrate Shed will be installed on? Grass DocuSigned by: Customer Signature: I�' Date: 741542020 94347F375550445.. DocuSign Envelope ID:4F73DD86-7290-439A-AOA7-4C28D41 F42AA TUFF SHED' Sales Order Location: CHICOPEE 1#660 14133550262 Scheduled Date: 12/31/2040 Factory Location: Derry j#660 1603-421-6873 Created Date: 07/14/2020 John O'Keefe i(781)708-6217 sonja Patel Prepared by: jokeefe@tuffshed,com Customer p. (413)306-8439 1 c. soniyapatell4l4@gmaii.com SF SO 00355478 Special Instructions: HD Store If Customer PO JDE SO 1523143 103 dunphy drivebay state village Serial Number: Ship to Address florence,MA 01062 u5 SR-600 8 x 12 1.00 PAINT SR-600 MR-450 KR-600 8'WIDE 1.00 16"x8"Wall Vent-White 1.00 DocuSigned by: ��---u4347F3L5550445 7/15/2020 Customer Signature Date � p-�--DS