Loading...
007_606555_CPE EstimateProject Preliminary Design Estimate 102.55 ARBORIST HR *$125.000 24.000 $3,000.00 102.521 TREE AND PLANT PROTECTION FENCE FT *$10.000 900.000 $9,000.00 104.TREE REMOVED - DIAMETER 24 INCHES AND OVER EA $2,500.000 5.000 $12,500.00 103.TREE REMOVED - DIAMETER UNDER 24 INCHES EA $800.000 5.000 $4,000.00 102.51 INDIVIDUAL TREE PROTECTION EA *$220.000 10.000 $2,200.00 100.SCHEDULE OF OPERATIONS - FIXED PRICE $30,000 LS *$30,000.00 0 1.000 $30,000.00 102.001 TREE TRIMMING CREW DAY *$2,000.000 2.000 $4,000.00 101.CLEARING AND GRUBBING A $25,000.00 0 1.500 $37,500.00 120.EARTH EXCAVATION CY $25.000 13900.000 $347,500.00 151.GRAVEL BORROW CY $40.000 3800.000 $152,000.00 146.DRAINAGE STRUCTURE REMOVED EA $500.000 12.000 $6,000.00 141.1 TEST PIT FOR EXPLORATION CY $80.000 250.000 $20,000.00 121.CLASS A ROCK EXCAVATION CY $63.000 2100.000 $132,300.00 144.CLASS B ROCK EXCAVATION CY $130.000 300.000 200.000 $65,000.00 142.CLASS B TRENCH EXCAVATION CY $30.000 300.000 500.000 $24,000.00 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total Thursday, November 21, 2019Measure System:E Description:NORTHAMPTON- ROUNDABOUT CONSTRUCTION AT INTERSECTION ROUTES 5/10 (NORTH KING STREET) & HATFIELD STREET Date: District:2 Extended Description: The proposed project will improve safety and operations at the intersection of Routes 5&10 and Hatfield St. Poor geometry and excessive delays to the side street traffic will be eliminated by construction of a modern roundabout at this northern gateway to the City of Northampton. Project:606555 Project Preliminary Design Estimate 221.FRAME AND COVER EA $800.000 16.000 $12,800.00 222.1 FRAME AND GRATE - MASSDOT CASCADE TYPE EA $855.000 21.000 $17,955.00 222.2 FRAME AND GRATE - MASSDOT DROP INLET EA $865.000 3.000 $2,595.00 220.7 SANITARY STRUCTURE ADJUSTED EA $400.000 7.000 $2,800.00 220.8 SANITARY STRUCTURE REMODELED EA *$750.000 4.000 $3,000.00 223.1 FRAME AND GRATE (OR COVER) REMOVED AND STACKED EA *$112.000 16.000 $1,792.00 184.1 DISPOSAL OF TREATED WOOD PRODUCTS TON *$275.000 1.000 $275.00 201.CATCH BASIN EA $3,000.000 19.000 $57,000.00 202.MANHOLE EA $3,800.000 12.000 $45,600.00 220.6 SANITARY STRUCTURE REBUILT FT *$400.000 20.000 $8,000.00 156.CRUSHED STONE TON $43.000 100.000 $4,300.00 170.FINE GRADING AND COMPACTING - SUBGRADE AREA SY $4.000 12700.000 $50,800.00 220.2 DRAINAGE STRUCTURE REBUILT FT $400.000 50.000 $20,000.00 220.3 DRAINAGE STRUCTURE CHANGE IN TYPE EA $1,000.000 4.000 $4,000.00 220.5 DRAINAGE STRUCTURE REMODELED EA $800.000 5.000 $4,000.00 204.GUTTER INLET EA $1,800.000 2.000 $3,600.00 206.1 DROP INLET, TYPE AF EA $4,000.000 3.000 $12,000.00 220.DRAINAGE STRUCTURE ADJUSTED EA $400.000 24.000 $9,600.00 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total Project Preliminary Design Estimate 241.12 12 INCH REINFORCED CONCRETE PIPE FT $70.000 1900.000 $133,000.00 227.31 REMOVAL OF DRAINAGE PIPE SEDIMENT FT $12.000 250.000 $3,000.00 242.12 12 INCH REINFORCED CONCRETE PIPE FLARED END EA $880.000 2.000 $1,760.00 241.15 15 INCH REINFORCED CONCRETE PIPE FT $80.000 170.000 $13,600.00 224.12 12 INCH HOOD EA $430.000 23.000 $9,890.00 227.3 REMOVAL OF DRAINAGE STRUCTURE SEDIMENT CY $250.000 20.000 $5,000.00 224.15 15 INCH HOOD EA $550.000 1.000 $550.00 309.DUCTILE IRON FITTINGS FOR WATER PIPE LB $7.500 1000.000 1000.000 $15,000.00 302.12 12 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $125.000 615.000 1400.000 $251,875.00 345.61 6 INCH TEMPORARY WATER MAIN LS *$40,000.00 0 1.000 $40,000.00 302.06 6 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $120.000 35.000 15.000 $6,000.00 269.06 6 INCH SLOT- PERFORATED CORRUGATED PLASTIC PIPE (SUBDRAIN) FT $45.000 840.000 $37,800.00 302.10 10 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $150.000 50.000 $7,500.00 302.08 8 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $130.000 20.000 60.000 $10,400.00 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total Project Preliminary Design Estimate 381.3 SERVICE BOX ADJUSTED EA $160.000 7.000 6.000 $2,080.00 384.CURB STOP EA $600.000 1.000 $600.00 402.DENSE GRADED CRUSHED STONE FOR SUB-BASE CY $70.000 910.000 $63,700.00 376.3 HYDRANT - REMOVED AND STACKED EA *$1,000.000 1.000 1.000 $2,000.00 381.SERVICE BOX EA $350.000 1.000 $350.00 415.PAVEMENT MICROMILLING SY *$7.500 8900.000 $66,750.00 430.CEMENT CONCRETE BASE COURSE SY $68.000 110.000 $7,480.00 347.15 1-1/2 INCH COPPER TUBING TYPE K FT $75.000 150.000 $11,250.00 350.06 6 INCH GATE AND GATE BOX EA $1,750.000 2.000 1.000 $5,250.00 350.08 8 INCH GATE AND GATE BOX EA $2,100.000 1.000 $2,100.00 376.HYDRANT EA $4,500.000 2.000 1.000 $13,500.00 347.075 3/4 INCH COPPER TUBING TYPE K FT $100.000 50.000 $5,000.00 347.1 1 INCH COPPER TUBING TYPE K FT $75.000 40.000 30.000 $5,250.00 350.10 10 INCH GATE AND GATE BOX EA $2,900.000 1.000 $2,900.00 363.1 1 INCH CORPORATION COCK EA $600.000 1.000 2.000 $1,800.00 363.15 1-1/2 INCH CORPORATION COCK EA $400.000 6.000 $2,400.00 375.10 10 INCH INSERTION VALVE AND BOX EA *$15,000.00 0 1.000 $15,000.00 350.12 12 INCH GATE AND GATE BOX EA $3,500.000 4.000 1.000 $17,500.00 358.GATE BOX ADJUSTED EA $200.000 4.000 1.000 $1,000.00 363.075 3/4 INCH CORPORATION COCK EA $600.000 2.000 $1,200.00 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total Project Preliminary Design Estimate 450.231 SUPERPAVE SURFACE COURSE - 12.5 POLYMER (SSC - 12.5 - P) TON $97.000 1700.000 $164,900.00 450.32 SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0) TON $100.000 900.000 $90,000.00 450.42 SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) TON $105.000 1800.000 $189,000.00 450.GRAVEL FOR SURFACING CY *$50.000 80.000 $4,000.00 509.GRANITE TRANSITION CURB FOR WHEELCHAIR RAMPS - STRAIGHT FT $50.000 150.000 $7,500.00 440.CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL LB $0.400 12700.000 $5,080.00 443.WATER FOR ROADWAY DUST CONTROL MGL $50.000 13.000 $650.00 451.HMA FOR PATCHING TON $175.000 100.000 230.000 $57,750.00 506.GRANITE CURB TYPE VB - STRAIGHT FT $35.000 7200.000 $252,000.00 506.1 GRANITE CURB TYPE VB - CURVED FT $45.000 330.000 $14,850.00 507.GRANITE CURB WITH BEVELED EDGE FT *$75.000 300.000 $22,500.00 482.3 SAWCUTTING ASPHALT PAVEMENT FT $2.000 3600.000 $7,200.00 452.ASPHALT EMULSION FOR TACK COAT GAL $7.500 2170.000 $16,275.00 453.HMA JOINT SEALANT FT $1.250 4600.000 $5,750.00 472.ASPHALT MIXTURES FOR TEMPORARY WORK TON $180.000 500.000 $90,000.00 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total Project Preliminary Design Estimate 701.1 CEMENT CONCRETE SIDEWALK AT DRIVEWAYS SY $65.000 10.000 $650.00 701.2 CEMENT CONCRETE WHEELCHAIR RAMP SY $80.000 190.000 $15,200.00 698.4 GEOTEXTILE FABRIC FOR PERMANENT EROSION CONTROL SY *$4.000 1100.000 $4,400.00 701.CEMENT CONCRETE SIDEWALK SY $50.000 2100.000 $105,000.00 701.992 STAMPED AND COLORED CONCRETE SY *$250.000 500.000 $125,000.00 703.HOT MIX ASPHALT DRIVEWAY TON $170.000 310.000 $52,700.00 514.GRANITE CURB INLET - STRAIGHT EA $400.000 13.000 $5,200.00 570.2 HOT MIX ASPHALT CURB TYPE 2 FT $9.000 700.000 $6,300.00 697.1 SILT SACK EA *$120.000 40.000 $4,800.00 509.1 GRANITE TRANSITION CURB FOR WHEELCHAIR RAMPS - CURVED FT $60.000 60.000 $3,600.00 620.13 GUARDRAIL, TL- 3 (SINGLE FACED) FT $30.000 540.000 $16,200.00 630.1 HIGHWAY GUARD REMOVED AND STACKED FT $6.000 600.000 $3,600.00 666.CHAIN LINK FENCE REMOVED AND RESET FT $35.000 210.000 $7,350.00 627.83 GUARDRAIL TANGENT END TREATMENT, TL- 3 EA $3,450.000 1.000 $3,450.00 628.21 TRANSITION TO NCHRP 350 GUARDRAIL EA $1,500.000 1.000 $1,500.00 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total Project Preliminary Design Estimate 734.SIGN REMOVED AND RESET EA *$325.000 3.000 $975.00 715.1 MAIL BOX REMOVED AND RESET EA *$145.000 2.000 $290.00 748.MOBILIZATION LS $110,919.3 40 1.000 $110,919.34 740.ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE A) MO *$2,500.000 30.000 $75,000.00 710.3 BOUND - LETTERED GRANITE EA $575.000 10.000 $5,750.00 711.BOUND REMOVED AND RESET EA $500.000 3.000 $1,500.00 710.4 BOUND - PLAIN GRANITE EA $520.000 2.000 $1,040.00 751.LOAM BORROW CY $50.000 800.000 $40,000.00 806.3 3 INCH ELECTRICAL CONDUIT TYPE RM - GALVANIZED STEEL FT $75.000 100.000 $7,500.00 804.3 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC - (UL) FT $39.000 30.000 $1,170.00 811.22 ELECTRIC HANDHOLE - SD2.022 EA $1,100.000 1.000 $1,100.00 765.SEEDING SY $2.000 5800.000 $11,600.00 756.NPDES STORMWATER POLLUTION PREVENTION PLAN LS *$5,000.000 1.000 $5,000.00 804.15 1-1/2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC - (UL) FT $20.000 600.000 $12,000.00 767.121 SEDIMENT CONTROL BARRIER FT *$6.500 3550.000 $23,075.00 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total Project Preliminary Design Estimate 853.21 TEMPORARY BARRIER REMOVED AND RESET FT $10.000 1800.000 $18,000.00 853.2 TEMPORARY BARRIER (TL-2) FT $50.000 600.000 $30,000.00 852.SAFETY SIGNING FOR TRAFFIC MANAGEMENT SF $20.000 490.000 $9,800.00 853.1 PORTABLE BREAKAWAY BARRICADE TYPE III EA $130.000 10.000 $1,300.00 813.81 SERVICE CONNECTION (UNDERGROUND) LS $7,500.000 1.000 $7,500.00 821.01 14 FOOT ORNAMENTAL LIGHT POLE W/BASE (BLACK) EA *$2,500.000 14.000 $35,000.00 813.30 WIRE TYPE 7 NO. 10 GENERAL PURPOSE FT $1.500 1800.000 $2,700.00 851.1 TRAFFIC CONES FOR TRAFFIC MANAGEMENT DAY $100.000 240.000 $24,000.00 812.09 LIGHT STANDARD FOUNDATION PRECAST EA *$1,250.000 14.000 $17,500.00 832.WARNING- REGULATORY AND ROUTE MARKER - ALUMINUM PANEL (TYPE A) SF $10.000 370.000 $3,700.00 847.1 SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST ASSEMBLY - STEEL EA $125.000 44.000 $5,500.00 824.01 RECTANGULAR RAPID FLASH BEACON EA *$15,000.00 0 3.000 $45,000.00 823.01 70 WATT EQUIV. LED LUMINARIE W/ DECR. HOUSING EA *$750.000 14.000 $10,500.00 823.60 HIGHWAY LIGHTING LOAD CENTER LS $20,000.00 0 1.000 $20,000.00 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total Project Preliminary Design Estimate 867.206 6 INCH REFLECTORIZED YELLOW LINE (POLYUREA) (RECESSED) FT *$1.900 6300.000 $11,970.00 866.212 12 INCH REFLECTORIZED WHITE LINE (POLYUREA) (RECESSED) FT *$5.000 730.000 $3,650.00 864.01 PAVEMENT ARROW AND LEGENDS REFLECTORIZED WHITE - INLAY TAPE SF $50.000 400.000 $20,000.00 853.411 TEMPORARY IMPACT ATTENUATOR FOR SHOULDER, INCAPABLE OF REDIRECTION, REMOVED AND RESET EA $1,000.000 2.000 $2,000.00 854.016 TEMPORARY PAVING MARKINGS - 6 INCH (PAINTED) FT $0.250 13700.000 $3,425.00 866.206 6 INCH REFLECTORIZED WHITE LINE (POLYUREA) (RECESSED) FT *$1.900 5900.000 $11,210.00 853.41 TEMPORARY IMPACT ATTENUATOR FOR SHLDR, INCAPABLE OF REDIRECTION EA $3,750.000 3.000 $11,250.00 856.12 PORTABLE CHANGEABLE MESSAGE SIGN DAY $22.000 1440.000 $31,680.00 859.REFLECTORIZED DRUM DAY $0.250 18000.000 $4,500.00 854.036 TEMPORARY PAVING MARKINGS - 6 INCH (TAPE) FT $1.500 6000.000 $9,000.00 856.ARROW BOARD DAY $10.000 720.000 $7,200.00 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total Project Preliminary Design Estimate 986.2 MODIFIED ROCKFILL CY *$125.000 30.000 $3,750.00 874.4 TRAFFIC SIGN REMOVED AND STACKED EA *$35.000 6.000 $210.00 904.4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE CY $1,250.000 17.000 $21,250.00 874.2 TRAFFIC SIGN REMOVED AND RESET EA *$100.000 2.000 $200.00 867.212 12 INCH REFLECTORIZED YELLOW LINE (POLYUREA) (RECESSED) FT *$5.000 890.000 $4,450.00 874.STREET NAME SIGN EA $100.000 3.000 $300.00 Total Amount $3,510,911.34 $8,000.00 $308,560.00 $3,827,471.34 Item #Description Units Type Unit Price FA - Congestion Mitigation/Air Quality (CMAQ) NFA - Site Specific NORTHAMPTON - Other - Municipality (Non- Participating) Total