Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
32A-178 (8)
82 BRIDGE ST BP-2020-1169 GIS#: COMMONWEALTH OF MASSACHUSETTS Ma Block: 32A- 178 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2020-1169 Proiect# JS-2020-001665 Est.Cost: $101466.00 Fee: $349.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sa. ft.): 20908.80 Owner: WAYFINDERS Zoning: URC(100)/ Applicant. PIONEER VALLEY PHOTOVOLTAICS AT. 82 BRIDGE ST Applicant Address: Phone: Insurance: 311 WELLS ST - SUITE B (413) 772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON.512912020 0:00:00 TO PERFORM THE FOLLOWING WORK.-PV ARRAYS ON ROOF INVERTERS IN ELECTRICAL ROOM - 30.975 dckw POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeTvue: Date Paid: Amount: Building 5/29/2020 0:00:00 $349.00 212 Main Street, Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner i Versionl.7 Commercial Building Permit May 15,2000 / Department use only City of Northampton Status of Permit: �Ay building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability �ghFe-Ui�n Northampton, MA 01060 Two Sets of Structural Plans 4137587-1240 Fax 413-587-1272 Plot/Site Plans AD' oeNs Other Specify APPLICATION TO CONSTRUCT, REPAIR, RENOVATE, CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 82 Bridge Street Map Lot Unit Northampton MA 01060 Zone Overlay District Elm St.District CB District SECTION 2 -PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Sergeant House L.P., c/o Way Finders, Inc. 120 Maple St. 4th Floor,Springfield MA 01103 Name(Print) Current Mailing Address: SEE ATTACHMENT A (413) 233-1724 Signature Telephone 2.2 Authorized Agent: Pioneer Valley Photovoltaics 311 Wells St. Greenfield MA 01301 Name(Print) Current Mailing Address: (413) 772-8788 Signature /" Telephone SECTION 3 -ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 530,439.80 (a) Building Permit Fee 2. Electrical $71,Q26.20 (b) Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) � 7 , 5. Fire Protection 6. Total = 0 +2 + 3+4 + 5) S 101,466.00 Check Number l/ This Section For Official Use Only Building Permit Number Date / !q Issued Signatur Building ommissioner/Inspec or of Buildingsi U Date Versionl.7 Commercial Building Permit May 15,2000 SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations ❑ Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Building❑ Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other ❑ Brief Description The installation of a 30.975 DC kW Roof Mounted Solar Array System Of Proposed Work: SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 ❑ A-2 ❑ A-3 ❑ 1A ❑ A-4 ❑ A-5 ❑ 1B ❑ B Business ❑ 2A ❑ E Educational ❑ 2B I ❑ F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑ H High Hazard ❑ 3A El Institutional ❑ 1-1 ❑ 1-2 ❑ 1-3 ❑ 3B ❑ M Mercantile ❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 0 R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 5B ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS, ADDITIONS AND/OR CHANGE IN USE Existing Use Group: Proposed Use Group: Existing Hazard Index 780 CMR 34): Proposed Hazard Index 780 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(sf) 1 S 15� 2nd 2nd 3rd 3rd 4in 4cn Total Area (sf) Total Proposed New Construction (sf) Total Height(ft) Total Height ft 7. Water Supply(M.G.L. c.40,§ 54) 7.1 Flood Zone Information: F7.3ewage Disposal System: Public ❑ Private ❑ Zone Outside Flood Zone❑ cipal ❑ On site disposal system❑ Version 1.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO Q DON'T KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW t'J YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained © , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Versionl.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE) 9.1 Registered Architect: Not Applicable 0 Name(Registrant): Registration Number Address Expiration Date Signature Telephone 9.2 Registered Professional Engineer(s): William M. Barry PE Structural Name Area of Responsibility 176 Churchill St. , Pitssfield MA 01201 30196 Address Registration Number See PE letter attached (413)443-6591 Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor Pioneer Valley Photovoltaics Not Applicable ❑ Company Name: Daniel Gomez Responsible In Charge of Construction 311 Wells Street, Greenfield MAO 1301 Address (413) 772-8788 Signature Telephone Versionl.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes 0 No O SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Sergeant House Limite Partneship, c/o Way finders, Inc. as Owner of the subject property hereby authorize Pioneer Valley Photvoltaics to act on my behalf, in all matters relative to work authorized by this building permit application. See Attachment A 05/19/2020 Signature of Owner Date Pioneer Valley Photovoltaics as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Daniel Gomez Print Name 05/19/2020 Signature of Owner/Agent Date SECTION 12-CONSTRUCTION SERVICES 10.1 Licensed Construction Suaervisor: Not Applicable ❑ Name of License Holder: Daniel Gomez Gonzalez CS-11266 License Number 311 Wells Street, Greenfield MA 01301 03/14/2021 Address ,l Expiration Date (413) 772-8788 Signature Telephone SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes G) No Attachment A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract price according to the Terms of Payment.I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley Photovoltaics Cooperative,or its designated representative,to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley Photovoltaics Cooperative for marketing purposes.A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. Printed Name Date t C "gin—ature Title Proposal and Agreement N o0015410 Page 7 of 13 Sergeant House Limited Partnership.December 30,2019 City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: 82 Bridge Street, Northampton MA 01060 The debris will be transported by: PV Squared Solar The debris will be received by: WTE Recycling Building permit number: Name of Permit Applicant Daniel Gomez 5/21/20 Ak"x Date Signature of Permit Applicant Commonwealth of Massaichuselt's Division ut Professional Locensure Boaid of Builaing Regulations and Standards i_onstruCtlon 5uperviSOr CS-111266 Expires 030412421 DANIEL GOP�IEZ-GONZALEZ 43 HATFIELD STREET NORTHAP.IPTON MA 01060 Office of Consumer Affairs and Business Regulation 1000 Washington Street- Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration Type: Supplement Card PIONEER VALLEY PHOTOVOLTAICS COOP Registration: 140077 311 WELLS ST SUITE B Expiration: 09/15/2021 GREENFIELD,MA 01301 SCA t-O 20M•05+17 Update Address and Return Card. office of Consumer Affairs 8 Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Suwlemerl Card before the expiration date. If found return to: Registration Expiration Office of Consumer Affairs and Business Regulation 140077 09'15(2021 1000 Washington Street Suitep710 r PIONEER VALLEY PHOTOVOLTAICS COOP Boston,MA 02118 MAYA FULFORD 311 WELLS 5T SUITE 6 -;';�((yrF Y GREENFIELD,MA 01301 Undersecretary 01t vali ithout signal e DATE(MM/DD/YYYY) ACRO® CERTIFICATE OF LIABILITY INSURANCE 12/z7/zols THIS CERTIFICATE IS ISSUED ASA MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Linda Powers,CRIS NAME: Webber&Grinnell A/�No, o Ext): (413)586-0111 A//C,No): (413)586-6481 8 North King Street E-MAIL (powers@webberandgrinnell.com ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURERA: Ohio Casualty/Liberty 24074 INSURED INSURER B: Ohio Security/Liberty 24082 Pioneer Valley PhotoVoltaics Cooperative,Inc. INSURER C: Continental Indemnity/AUW Attn:Kim Pinkham INSURER D: 311 Wells Street,Suite B INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: Master Exp 1-2021 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR AIJUL 5LIBM POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1'000'000 DAMAGE TRENTED 300,000 CLAIMS-MADE X OCCUR PREMISES Ea occurrence $ MED EXP(Any one person) $ 5,000 A BKS57072282 01/01/2020 01/01/2021 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 JECT ❑ X POLICY ❑ PRO LOC PRODUCTS-COMPIOPAGG $ 2,000,000 OTHER: I I $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 Ea accident X ANYAUTO BODILY INJURY(Per person) $ B OWNED SCHEDULED BAS57072282 01/01/2020 01/01/2021 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ X AUTOS ONLY Hx AUTOS ONLY Per accident X $1 K Coll $1 K comp Underinsured motorist BI $ 300,000 X UMBRELLA LIAB OCCUR EACH OCCURRENCE $ 3'000'000 A EXCESS LIAB HCLAIMS-MADE US057072282 01/01/2020 01/01/2021 AGGREGATE $ 3'000'000 DED I I RETENTION$ $ WORKERS COMPENSATION X STATPERUTE EORH AND EMPLOYERS'LIABILITY YIN ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.� EACH ACCIDENT $ 1,000,000 C OFFICER/MEMBEREXCLUE N/A 37-592871-01-03(Ma&NY) 01/01/2020 01/01/2021 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ Business Pers Property $1,750,000 Commercial Property A BKS57072282 01/01/2020 01/01/2021 Installation $25,000 Transportation $75,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Worker's compensation ncludes Ma and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street,Suite 100 Boston,MA 02114-2017 r www mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Leeibly Name (Business/Organization/Individual):Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): 1.[Z]I am a employer with 44 employees(full and/or part-time).* 7. E]New construction 2. 1 am a sole proprietor or partnership and have no employees working for me in any capacity.[No workers'comp.insurance required.] 9. [:]Remodeling 9. El Demolition 3.1 I am a homeowner doing all work myself.[No workers'comp,insurance required.]t 10❑Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.M I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.[:] p Roof repairs These sub-contractors have employees and have workers'comp.insurance.t 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14. Other Solar PV 152,§1(4),and we have no employees.[No workers'comp.insurance required.] IL Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Continental Indemnity/AUW Policy#or Self-ins.Lic.#:37-592871-01-03 Expiration Date:01/01/2021 Job Site Address: 82 Bridge Street, City/State/Zip:Northampton, MA 01060 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce rte ai s nd penalties of perjury that the information provided above is true and correct. Si nate Date: 5/21/2020 Phone#:413-7 -87 8 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: "QU4 a o SERGEANT HOUSE — Northampton - Flat roof mounted PV array subsystem Pitched roof mounted PV --- array subsystem - --- -- —`.. ----------• IL 44 44 41 — --- 0 0 � 411 11 14 14-1 I ; J I ; Utility meter and PV disconnect at ground level Owner: Sergeant House Limited Partnership, PV power-board in c/o Way Finders, Inc. basement mech room Owner contact: Michelle McAdaragh Site Address: 82 Bridge St, Northampton, MA 01060 Phone: (413) 233-1725 e-mail: mmacadarapwayfindersma.org System Size : 30.97 kW DC/ 23.4 kW AC PV Array: (90) SPR modules distributed in two racking subsystems for flat and pitched roofs as shown in layout above Mounting: Ecolibrium ECO2 ballasted system •rr �, for flat roof and Ironridge XR100 on Ecofasten Quickoot bases for pitched roofs ' Roof Structure: Engineered trusses as indicated in structural drawings. See PE letter. Roofing Material: TPO and asphalt shingles U DD (:60 barry engineers and constructors,inc. 176 churchill street, pittstield,massachusetts 01201 413-443-6591 May 14, 2020 Kyle Young Dietz& Co. Architects, Inc 17 Hampden St. Springfield, MA. 01103 Re: Sargent House Solar Panels Dear Kyle: This letter is to confirm that the roof trusses at the Sargent House at 82 Bridge St. in Northampton, Massachusetts have been designed to support the additional loads from the proposed solar panel. This was required in the load tables on the structural drawings and confirmed by our review of the truss shop drawings for the project. Should you have additional questions or need further information,please contact me. Jtk� q WILLAM M. o I, BARRY. P.E. No. 30196 William M. Barry DIETZ 1 3/4X9 1/4 LVL RM (3)7Jf! C 0 . �< COST Architects INCORPORATED 1 1 4X9 1/4 � LSL M SISTER 1 3/4X16 LVL TRUSS SS FRANK a MURRAY -3/4X7 1/4 LVL STREET.SUITE 0 2X5 RAFTERS SPRINGFIELD.MA 01 103 r :. & ADD 1 3/4 (413)733-6798 iL LVL O 15' IST. ARCHITECT 1 3/4X16- LVL RIM 0 r L CONSULT r v6 a �y�** .. r Q'6uw L —— / aVRM,V E. rl I r ft IDIM N 2X6 O 16 3 4X j BEAR. WALL r x x r a W' ' I yl LLJ 1} r i ---Ka=0 -- VJ N d Z r ----- - I I 0 O O LZ r — oz W HI L 0 Q 1 r � o � L . a W Z - r --- — H 11 ILI 0 0 r - I- o L) t Lu 9 r ----- -- I z 0 z ". J 0,l N L -----J -- '• O W v W r a U J = 5 S 1� `> Z B U N-71 41 n 1nI � N I W SISTER 1 3/4X16 LVL TO TRUSS G u z °o -- — Z oS �o u S o 1/2- COX ON / 1 3/4X9 1/4 J O 2X6 O 16 WALLS LVL RIM a � LVL e+s O a \S NOTES 3/4 i i� 1. 1Q- 3/4' COX ON 16' DEEP PARALLEL CHORD 0 WOOD TRUSSES O 16" O.C. PROJECTNO: 21613 2- 2 3/4'COX ON TRUSSES TYPE A O 24' O.C. �� _CADncNAt . •691RVER 3. 3 - 3/ 4' COX ON TRUSSES TYPE B O 24' O.C. DRAWN SY: EW 4. 4 6 1/2' CONC. SLAB ON 3"-16 GAGE COMP. CHKTIEY: vw6 ETAL DECK W/ #4 O 12" O.C. IN FLUTES By owe a Co.wwwcw.ae. N Rly�b RwrwL &*ET TRIE ROOF FRAMING PLAN S-170 ° 0 0 Sub May 3(32)Modules° �►* Ov 33 311 web Sc.Suite 8 ub Array 1(32)Modules Gree%W na 01301 - w:413-772-8788 1"y4*1�. ,r, w.4i3-772-sess commeroalimpvsQuaredcoop ML O PV SYSTEM ROOF ARRAY LAYOUT sivaaasnn. cm o ° O o VALLEY CDC THE SERGEANT HOUSE 82 BRIDGE STREET 01) NORTHAMPTON col MA 01060 PROJECT NO: 21611 DRAWN BY: DG o CHECKED BY: CK SCALE 1/4"=V-0" ORIGINAL SHEET SIZE O ° ARCH D O o el ---- 39eY' --- ---. F.olibYwm Ballast tray Srrutture—".,S l3o'O.C. per roof Structural drawal8 oq7 s Actual bcation to be verified ori sire. ECohbriu n ECOFu tS Per Module Solar Module Sunpower SPR-X22-: a o F,0br1um E-FootSD Base > ev m 0 a } r = z O 0 0 N z z O N VI Q 0 O 0 N E > > a o z PV-3 X SUNP WER SunPower X-Series: X21-350-BLK SunPowerO Residential DC Panel SunPower X-Series panels combine the top efficiency,durability and warranty available in the market today,resulting in more long-term energy and savings.1.2 ;�. Premium Aesthetics �Ar SunPower®SignatureTm Black X-Series panels blend harmoniously into your roof.The most elegant choice for your home. Highest Lifetime Energy and Savings Designed to deliver 60%more energy in the same space over 25 years in real-world conditions like partial shade and high temperatures.z 140% --------- --- Fundamentally Different. Q 130% And Better. ° z°% .. - up to 60% > ,10w 100% More Lifetime ,y 90% Energy sow, Conventional Panel >, 70% N 60% (7 , 1() 1S 10 The SunPower Maxeon®Solar Cell Years of operation • Enables highest efficiency panels available z © Best Reliability, Best Warranty • Unmatched reliability 3 • Patented solid metal foundation With more than 25 million panels deployed around the prevents breakage and corrosion world,SunPower technology is proven to last.That's why we stand behind our panel with the industry's best 25-year Combined Power and Product Warranty, including the highest Power Warranty in solar. aadletocradle 100% 3 9846 As Sustainable As Its Energy a 949 • Ranked#1 in Silicon Valley Toxics 9296SunPowerl Coalition 2015 Solar Scorecard` a 809 More� SR46 More • First solar panels to achieve Cradle toa 869 Power Cradle CertifiedTM'Silver recognition c 649 in Year g `m 82e6 zs • Contributes to more LEED categories 3 80% than conventional panels 6 o o Years of Operation X-Series: X21-350-BLK SunPower°Residential DC Panel Electrical Data Operating Condition And Mechanical Data SPR-X21-350-BLK SPR-X21.335-BLK Temperature -40°F to+185°F(-40°C to+85°C) Nominal Power(Pnom) 350 W 335 W Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) Power Tolerance +5/046 +5/046 Appearance Class A+ Panel Efficiency 21.5% 20.6% Solar Cells 96 Monocrystalline Maxeon Gen III Rated Voltage(Vmpp) 57.3 V 57.3 V Tempered Glass High-transmission tempered anti-reflective Rated Current(Impp) 6.11 A 5.85 A Junction Box IP-65,MC4 compatible Open-Circuit Voltage(Voc) 68.2 V 67.9 V Weight 41 lbs(18.6 kg) Short-Circuit Current(Isc) 6.50 A 6.23 A G5 Frame: Wind:62 psf,3000 Pa front&back Max.System Voltage 600 V UL&1000 V IEC Max.Load Snow:125 psf,6000 Pa front Maximum Series Fuse 15A G3 Frame: Wind:50 psf,2400 Pa front&back Power Temp Coef. -0.29%/°C Snow:112 psf,5400 Pa front Voltage Temp Coef. -167.4 mV/°C Frame Class 1 black anodized(highest AAMA rating) Current Temp Coef. 2.9 mA/I C 46 mm Tests • Certifications 1558 mm #] [1.8 in] Standard Teets UL1703(Type 2 Fire Rating),IEC 61215, [61.3 in] IEC 61730 Quality Management Certs ISO 9001:2015,ISO 14001:2015 EHS Compliance RoHS,OHSAS 18001:2007,lead free, Recycle Scheme,REACH SVHC-163 1046 mm Sustainability Cradle to Cradle CertifiecITM Silver. [41.2 in] "Declare."listed. Ammonia Test IEC 62716 Desert Test 10.1109/PVSC.2013.6744437 Salt Spray Test IEC 61701(maximum severity) PID Test 1000V:IEC 62804,PVEL 600 hr duration Available Listings UL,TUV,MCS,FSEC,CEC G5 FRAME PROFILE G3 FRAME PROFILE InvisiMount-Compatible Not InvisiMount Compatible E cE" E;p E� 1 SunPower 360 W compared to a Conventional Panel on same-sized arrays(260 W,16% v e efficient,approx.1.6 mz),4%more energy per watt(based on PVSyst pan files),0.75%/yr L slower degradation(Campeau,Z.et al."SunPower Module Degradation Rate,"SunPower 30 mm white paper, 2013). [1.2 in) 32 mm[1.3 in]LONG SIDE 2 Based on search of datasheet values from websites of top 10 manufacturers per IHS,as of 22 mm[0.9 in]SHORT SIDE. January 2017. 3#1 rank in"Fraunhofer PV Durability Initiative for Solar Modules:Part 3".Pvfech Power Magazine,2015.Campeau,Z.et al."SunPower Module Degradation Rate,"SunPower white G5 frames have no mounting holes.Please read the safety and paper,2013. installation guide. 4 SunPower is rated#1 on Silicon Valley Toxics Coalition's Solar Scoretard. 5 Cradle to Cradle Certified is a multkattribute certification program that assesses products and materials for safety to human and environmental health,design for future use cycles, and sustainable manufacturing. 6 X-Series and E-Series panels additionally contribute to LEED Materials and Resources credit categories. 7 Standard Test Conditions(1000 W/m=irradiance,AM 1.5,25°Q NREL calibration Standard:SOMS current,LACCS FF and Voltage. 8 Type 2 fire rating per UL1703:2013,Class C fire rating per UL1703:2002. See www.sunpower.com/company for more reference information. For more details,see extended datasheet:www.sunpower.com/solar-resources. Specifications included in this datasheet are subject to change without notice. 02018 SunPower Corporation.All rights reserved.SUNPOWER,the SUNPOWER logo, I I \ / {,� n MAXEON,SIGNATURE and InvisiMount are trademarks or registered trademarks of v v v I\ SunPower Corporation. 1-800-SUNPOWER 527835 Rev A/LTR US sunpower.com RON RI DGE Parts Catalog Flush Mount Flush Mount Overview ad ,F> The IronRidge Flush Mount System is a rail based system for mounting solar modules on pitched roofs. The system utilizes IronRidge XR Rails with a variety of roof attachments to support extreme wind and snow loads. The entire system uses only aluminum and stainless steel components to ensure complete corrosion resistance. w Download AutoCAD File g Download PDF Preview [xauxa wax � q oe F _15 5 .e, xz xc ocEcr xoxvo¢ [ xuc ��[ [ L 0 o[t / on U[mxr n[w xM:[•[V l'J x/xx•[o' IR 1.0 support ironridge.com (800)227-9523 Page 16 v2.05 RON RI DGE Parts Catalog Flush Mount FlashFooU 21 Item Number Description FF2-01-M1 FlashFoot2,Mill FM-FF2-001 Kit,4pcs,FlashFoot2,Mill FF2-01-61 FlashFoot2,Black FM-FF2-001-B Kit,4pcs,FlashFoot2,Black IronRidge FlashFoot2 features a completely redesigned seal that is both elevated and fully encapsulated,protecting against water intrusion.The flashing has a 9"x 12"profile,which minimizes interference with roofing nails.FlashFoot2's alignment markers help to quickly align the flashing with pilot holes.Twisting on the Cap makes FlashFoot2 ready to mount XR Rails.Comes with flashing,lag bolt,and Cap. support I ironridge.com 1 (800)227-9523 Page 17 v2.05 IRONRIDGE FlashFoW2 3 4 2 1 o ITEM NO. DESCRIPTION 1 BOLT LAG 5/16 X 4.75' 2 ASSY, FLASHING 3 ASSY,CAP 4 WASHER, EPDM BACKED FLASHFOOT 2 Part Number Description FF2-01-M1 FLASHFOOT2,MILL FF2-01-B1 FLASHFOOT2,BLACK 1 ) Bolt, Lag 5/16 x 4.75 0.63 26— +� ��— 5/16 THD 7116" Head 4.75 Property Value Material 300 Series Stainless Steel Finish Clear v1.20 IRONRIDGE Parts Catalog Flush Mount Bonding Attachment Hardware $him' 11%- Rr, Item Number Description BHW-SQ-02-A1 Square Bolt Bonding Hardware FM-SQ-BHW-V2 Kit,4pcs,Square Bolt Bonding Hardware BHW-TB-02-A1 1 pc,T-Bolt Bonding Hardware FM-TB-BHW-V2 Kit,4pcs,T-Bolt Bonding Hardware Attachment bonding hardware available in both square bolt and t-bolt options,based on personal preference.Bonding hardware is used to attach and bond the rail to the FlashFoot2,Slotted L-Foot,or a third-party roof attachment.The step nut allows installers to use the same socket as the rest of the system. support I ironridge.com 1 (800)227-9523 Page 20 v2.05 IRONRIDGE Bonding Hardware 3 3 ® ® 2 ITEM NO. DESCRIPTION 1 BOLT,T CSTM, 3/8-16 2 BOLT, BONDING 3/8-16 SQ HEAD 3 NUT, BONDING STEP BONDING HARDWARE Part Number Description BHW-TB-02-A1 T-BOLT,BONDING HARDWARE BHW-SQ-02-A1 SQUARE-BOLT,BONDING HARDWARE 1 ) BOLT, T CSTM, 3/8-16 2) BOLT, BONDING 3/8-16 SQ HEAD 82 1.00 1.00 3/8-16 THD .38 .56 ris � T K.29 �-7 24 3/8-16 THD Property Value Property Value Material 300 Series Stainless Steel Material 300 Series Stainless Steel Finish Clear Finish Clear 3) NUT, BONDING STEP 3/8-16 THD 0.75 7/16'' Head .79 Property Value Material 300 Series Stainless Steel Finish Clear v1.30 RON RI DGE Parts Catalog Rail Assembly XR Rail ■ I XR1000 XR100 XR10 Item Number Description Item Number Description XR-1000-168A XR1000,Rail 168"(14 Feet)Clear XR-10-168A XR10,Rail 168"(14 Feet)Clear XR-1000-204A XR1000,Rail 204"(17 Feet)Clear XR-10-168B XR10,Rail 168"(14 Feet)Black XR-100-168A XR100,Rail 168"(14 Feet)Clear XR-10-204A XR10,Rail 204"(17 Feet)Clear XR-100-168B XR100,Rail 168"(14 Feet)Black XR-10-204B XR10,Rail 204"(17 Feet)Black XR-100-204A XR100,Rail 204"(17 Feet)Clear XR-100-204B XR100,Rail 204"(17 Feet)Black The XR Rail Family offers the strength of a curved rail in three targeted sizes.Each size supports specific design loads, while minimizing material costs.Depending on your location,there is an XR Rail to match.XR1000 is a heavyweight among solar mounting rails.It's built to handle extreme climates and spans 12 feet or more for commercial applications.XR100 is the ultimate residential mounting rail.It supports a range of wind and snow conditions,while also maximizing spans.XR10 is a sleek,low-profile mounting rail,perfectly matched to regions with light or no snow.It achieves 6 foot spans,while also staying light and economical. support I ironridge.com 1 (800)227-9523 Page v2.05 /l IRONRIDGE XR100 Rail See Descri tion / Lenon Rail Section Properties Property Value Total Cross-Sectional Area 0.582 int .66 Section Modulus (X-axis) 0.297 in' .46 Moment of Inertia (X-axis) 0.390 in - Moment of Inertia (Y-axis) 0.085 in" Torsional Constant 0.214 in' Polar Moment of Inertia 0.126 in 1.99 APPROVED MATERIALS: 2.44 6005-T6, 6005A-T61, 6105-T5,6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) .58 i L 1.25 —' Clear Part Black Part Description/Length Material Weight Number Number XR-100-168A XR-100-168B XR100, Rail 168"(14 Feet) 6000-Series 9.55 lbs. XR-100-204A XR-100-204B XR1DO, Rail 204"(17 Feet) Aluminum 11.60 lbs. V1.10 RON RI DGE Parts Catalog Rail Assembly Bonded Splices 'taw..,y.w► �' XR1000 XR100 XR10 Item Number Description XR-1000-SPLC-M1 XR1000 Bonded Splice(Incl.Self-tapping Screws) XR-100-SPLC-M1 XR100 Bonded Splice(Incl.Self-tapping Screws) XR-10-SPLC-M1 XR10 Bonded Splice(Incl.Self-tapping Screws) Multiple sections of XR Rails can easily be spliced and bonded together with our bonded splices.The internal splice bars do not interfere with clamping or mounting locations,and offer a seamless appearance.XR Rail Splices are made with extruded 6000 series aluminum.12-14 x 5/8"self-drilling screws are included. support I ironridge.com 1 (800)227-9523 Page v2.05 IRONRIDGE XR100 Bonded Splice XR-100 RAIL / 12.0 1 XR-100-S P LC-M 1 XR100 BONDED SPLICE (INCL. SELF-TAPPING SCREWS) 2 1) Splice, XR100, Mill 12" long 2) Screw, Self Drilling 1.24 63 1.93 .31 ILI 0.42 .15 �— .93 #12-14 TYPE "B"THREAD Property Value Property Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish Clear V1.0 f E RON RI DGE Parts Catalog Rail Assembly Grounding Lugs Item Number Description XR-LUG-03-A1 Grouding Lug,Low Profile GD-LUG-003 Grounding Lug,Low Profile,2pcs RS-GDLG-002 Grounding Lug,Integrated Grounding,T-Bolt,2pcs A single Grounding Lug connects an entire row of PV modules to the grounding conductor. support I ironridge.com 1 (800)227-9523 Page 11 v2.05 A00' IRONRIDGE Grounding Lug 2 ' 3 4 ITEM NO. DESCRIPTION 1 LUG, GROUNDING, LAY-IN -LOW PROFILE 2 BOLT, 1/4-28 X .750" HEX CS SST 3 NUT, FLANGE HEX 1/4-20 SST 4 BOLT, T CSTM 1/4-20 X 1.188" LOCK SS Part Number Description I I Wire Size Range(AWG) XR-LUG-03-A1 GROUNDING LUG, LOW PROFILE 1 4-10 1)Lug, Grounding 3) Nut, Flange Hex 1/4-20 .63 .63 - E�� 1/4-20 THD CA •59 .26 7116"Head 24 1.75 Property Value Material 300 Series Stainless Steel Property Value Finish Clear Material Tin Plated Copper Finish Clear Matte 4) Bolt, T CSTM 1/4-20 x .750 1 .24 114 20 THD 2) Bolt, 1/4-28 x .750 Hex .61 A 7/16' �—.16 ( 0( Head 1/4-28 THD 26 .75 ���,,,JJJ .75 Property Value Property Value Material 300 Series Stainless Steel Material 300 Series Stainless Steel Finish Clear Finish Clear V1.io RON RI DGE Parts Catalog Rail Assembly Microinverter/ Power Optimizer Bonding Hardware 7 t ! � Item Number Description BHW-M1-01-A1 Microinverter Bonding Hardware,T-Bolt MI-BHW Kit,2pcs, 1/4 x 3/4 Microinverter Mounting,T-Bolt Use IronRidge's Microinverter Bonding Hardware to bond compatible microinverters and power optimizers to the racking system. COMPATIBLE PRODUCTS Enphase-M250-72,M250-60,M215-60,C250-72,5230,S280 Darfon-MIG240,MIG300,G320,G640 Solar Edge-P300,P320,P400,P405,P600,P700,P730,P800p,P800s support I ironridge.com 1 (800)227-9523 Page 12 v2.05 IRONRIDGE Microinverter Bonding Hardware 2 1 Item Number Description Qty.in Kit 1 Bolt,T CSTM 1/4-20 X .75'Lock SS 2 2 Nut, Flange, Hex 1/4-20 SS 2 Microinverter Bonding Hardware Part Number Description BHW-Ml-01-Al Microinverter Bonding Hardware,T-Bolt 1) Bolt, T CSTM 1/4-20 x .75 2) Nut, Flange Hex 1/4-20 ,24 1/4-20 THD .59 1/4-20 THD .61 7/16" .24 .26� '75 Head Property Value Property Value Material 300 Series Stainless Steel Material 300 Series Stainless Steel Finish Clear Finish Clear v1.10 `I 7. k . IRONRIDGE Universal Fastening Object 1 UNIVERSAL FASTENING OBJECT ITEM NO. DESCRIPTION UFO-CL-01-A1 UNIVERSAL MODULE CLAMP, CLEAR UFO-CL-01-Bl UNIVERSAL MODULE CLAMP, BLACK .29 7/16'Head 0.37 COMPATIBLE WITH 30-46mm MODULE FRAMES 01.12 .25 Property Value Material 300 Series Stainless Steel Finish Clear and Black 0.30 ==s More than 22% Efficiency High Performance & Excellent Reliability Captures more sunlight and generates more power than conventional panels. X SERIES Maximum Performance Designed to perform in demanding real-world conditions of high temperatures,partial shade x. from overhead wires,and low light.1,21 Commercial Grade Intended for commercial sites where maximum SPR-X22-360-COM energy production is critical. Highest Efficiency' Generate more energy per square foot X-Series commercial panels convert more sunlight to electricity by producing 38%more power per panel'and 70%more energy per square foot over 25 years.'2.3 Highest Energy Production' Produce more energy per rated watt MaxeoW'Solar Cells:Fundamentally better Engineered for performance,designed for re�iabaity. More energy to power your operations.High year-one performance delivers 8-10%more energy per rated watt.2 This advantage increases over time, Engineered for Peace of Mind producing 21%more energy over the first 25 years to meet your needs.' Designed to deliver consistent,trouble-free .21% 1 zoat energy over a very long lifetime.34 3 More energy p0"h Per Rated Watt c Designed for Reliability '°° Sun Power X-Series 1:5 90% 36%more, 0 The SunPower Maxeon Solar Cell is the only cell year 25 80% built on a solid copper foundation.Virtually w 70% • • nal impervious to the corrosion and cracking that v 60% degrade conventional panels.' N so% 0 5 10 15 20 25 Same excellent durability as E-Series panels. Years #1 Rank in Fraunhofer durability test.' 10% M_ m I ainntaitans High i 100%power maintained in Atlas 25+ 8% Power at High Temps v - comprehensive durability test.10 No Light-Induced m 6% Degradation Q High Average Watts _ 4% - - _ Better Low-Light and Spectral Response w - --- --�High-Pe -. Performance } Anti-Reflective Glass 0% Datasheet • i r iew waw+ 1 SunPowerO X-Series Commercial Solar Panels X22-360-COM SunPow(,r Offers The Best Combined Power And Product Power Warranty Product Warranty ioa% I i SunPowerSimPower mom" Flo>, 85% 80% 7S% 007 0 5 10 15 1.0 25 O 5 10 1S 20 25 Years Years c,nrvxnu,.,,nl ea„el-Lnea,'ware n'Y More guaranteed power:95%for first 5 years, Combined Power and Product defect 25-year coverage 8 -0.4%/yr.to year 25 7 Electrical Data Tests And Cc- SPR-X22-360-COM Standard Tests 13 UL1703(Type 2 Fire Rating),IEC 61215,IEC 61730 Nominal Power(Pnom)l 360 W Quality Certs ISO 9001:2008,ISO 14001:2004 Power Tolerance +5/-3% EHS Compliance ROHS,OHSAS 18001:2007,lead free,REACH Avg.Panel Efficiency- 22.2% SVHC-163,PV Cycle Rated Voltage(Vm ) 59.1 V Cradle to Cradle Certified TM Silver(eligible for LEED Sustainability points)14 Rated Current(Im ) 6.09 A Open-Circuit Voltage(Voc) 69.5 V Ammonia Test IEC 62716 Short-Circuit Current(Isc) 6.48 A Desert Test 10.1109/PVSC.2013.6744437 Max.System Voltage 1000 V UL&1000 V IEC Salt Spray Test IEC 61701 (maximum severity) Maximum Series Fuse 15A PID Test Potential-Induced Degradation free:1000 V9 Power Temp Coef. -0.29%/0 C Available Listings UL,TUV,JET,CEC Voltage Temp Coef. -167.4 mV/IC ConditionOperating La Current Tem Coef. 2.9 mA/0 C Tem erature -40°F to+185°F(-40°C to+85°Q , REFERENCES: Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) 1 All comparisons are SPR-X21-345 vs.a representable conventional panel:250 W,approx.1.6 m2, 15.3%efficiency. Appearance Class B 2Typically8-10%moreenergyperwatt,BEW/DNVEngineering"SunPowerYieldReport,"Jan 2013. Solar Cells 96MonocrstallineMaxeonGen III 3 SunPower 0.25%/yr degradation vs.1.0%/yr conv.panel.Campeau,Z.et a].'SunPower Module Tempered Glass High-transmission tempered anti-reflective Degradation Rate,"SunPower white paper,Feb 2013;Jordan,Dirk"SunPower Test Report,"NREL, Q7-2015. Junction Box IP-65,MC4 compatible 4"SunPower Module 40-Year Useful Life"SunPower white paper,May 2015.Useful life is 99 out of Weight 41 lbs(18.6 kg) 100 panels operating at more than 70%of rated power. 5 Highest of over 3,200 silicon solar panels,Photon Module Survey,Feb 2014, Max.Load Wind:50 psf,2400 Pa,244 kg/m2 front&back 6 1%more energy than E-Series panels,8%more energy than the average of the top 10 panel Snow:112 psf,5400 Pa,550 kg/M2 front companies tested in 2012(151 panels,102 companies),Photon International,Feb 2013. Frame Class 2 silver anodized;stacking ins 7 Compared with the top 15 manufacturers.SunPower Warranty Review,May 2015. 8 Some restrictions and exclusions may apply.See warranty for details. I_ 1559 mm _ 46 mm 9 X-Series same as E-Series,5 of top 8 panel manufacturers tested In 2013 report,3 additional [61.4 in] [1.8 in] panels in 2014.Ferrara,C.,et al."Fraunhofer PV Durability Initiative for Solar Modules:Part 2". �. Photovoltaics International,2014. 10 Compared with the non-stress-tested control panel.X-Series same as E-Series,tested in Atlas 25+Durability test report,Feb 2013. - FRAME PROFILE 11 Standard Test Conditions(1000 W/m�irradiance,AM 1.5,25•Q.NREL calibration Standard: 1046 mm SOMS current,LACCS FF and Voltage. [41.2 in] E 12 Based on average of measured power values during production. ,EE 13 Type 2 fire rating per UL 1703:2013,Class C fire rating per UL1703:2002. 14 See salesperson for details. 32 mm[1.3 int LONG SIDE 04 22 mm 10.9 in)SHORT SIDE 4X398mm (A)Stacking Pins [15.68 in](A) Please read the safety and installation guide. See www.sunpower.com/facts for more reference information. For more details,see extended datasheet:wwwsunpowercom/datasheets. Document#514617 Rev B/LTR US QiDeceinber 2016 SunPower Corporation.All rights reserved.SUNPOWER,the SUNPOWER • . 03/06/16 KKK REV_06C zil� REVEWN DESCRvnoN 4"x8"x16" Ballast Block ," 15%8" 3 V8 NOTES: • WEIGHT: -34 Ibs/ea. • COMPRESSIVE STRENGTH,MIN P.S.I.(AVG.GROSS AREA) -AVG.OF 3 UNITS:4500 CROMWELL -INDIVIDUAL UNITS:4500 CONCRETE PRODUCTS INC. • WATER ABSORPTION MAX(LB/FT') -AVG OF 3 UNITS: 10% PROJECT • DRY CAST BLOCK WITH%"AGGREGATE Tr1LE • NO DIMENSION SHALL VARY MORE THAN 3 PERCENT OVER OR 4x8x16 BALLAST BLOCK UNDER THE SPECIFIED DIMENSION FOR ANY FORM OF UNIT DESIGN BGR m/06/16 FILE No. • ASTM C-139-05 EXCEPT THAT THE UNITS SHALL CONFORM TO CAM NF 05/06/16 SCALE 3'-1'-0' THE DETAILS SHOWN HEREON AND THAT THEIR THICKNESS REVIEW MW 05/06/16 REV. SHALL NOT BE LESS THAN 5" PROJECT No. DRAWING:4x8x16 BALLAST Accessory Frame Bracket For mounting module level electronics to standard module frames ` r ORR W �7, � r•II �µ e �r �� w ,Z ti i I. ,y. Works with: Quick Rack-Rail-Free System Rooftop Racking Systems • C�uic Mount PV`p' Ground Mounted Systems I Ballasted Systems RESPECT THE ROOF ITEM DESCRIPTION QTY. NO. 1 ACCESSORY FRAME CLAMP,UNIVERSAL,5052-H32,MILL 1 2 ACCESSORY FRAME BRACKET,5052-1-132,MILL 1 3 CAP SCREW,SERRATED FLANGE,HEX HEAD,5/16"-18 X 3/4', 1 UNC-2A 18.8SS • 9 • e 1 2 3 Quick Mount W TITLE: QMAFBU: ACCESSORY FRAME BRACKET, UNIVERSAL UN LESS OTHERWISE SPECIFIED: SIZE DRAWN BY: DFM REV DWIENSIOHS ARE IN INCHES TOLERANCES: A DATE: 5/16/2018 2 FRACT ONALS 118 avovlvnAvv AxR croNNTNxTUL TWOPLACEDECRML 1.19 rHE axoaw.TpN coHrAa.¢oNrw oanwvw¢TxE son vaovaarr oa oukxraouanvv u,vvavaooucnoHNaARi ov ATnwxou wnxour m[ DO NOT SCALE DRAWNG THREE PLACE DECWLAL 5094 SCALE:2:3 W5GM:0.19 SHEETI Oft W—.IT--aouica--vv¢11... COPYRIGHT 2016 QUICK MOUNT PV BRACKET CLAMP _MODULE FRAME ACCESSORY FRAME BRACKET A "I s U GROUNDING PINS MODULE LEVEL ELECTRONIC CAP SCREW BRACKET CLAMP MODULE FRAME ACCESSORY FRAME BRACKET I II I II II I II CAPSCREW MODULE LEVEL ELECTRONIC Quick Mount PV TITLE: QMAFBU: ACCESSORY FRAME BRACKET, UNIVERSAL UNLESS OTHERWISE SPECIFIED: SIZE DRAWN BY: DFM REV DWIENSIONS ARE N INCHES TOLERANCES: A DATE: 5/16/2018 2 w.R'T'OrvRCWIvE�aL, TWOPIONALf C H v�eT ovunwrvq[wnnouT n,F DO NOT SCALE DRAWNG TWO PUCE DECOAAL 5.19 wvnrzH rcvxaRONa ouca xTovw vvsaaox¢rt® COPYNGHT02014QYICKMOUNTPV TNREEPIACEDECWAL JM4 ,SCALE:1:2 WEIGM:3.81 SHED 2OF2 131 7.2.3-371 Oct-2018,Rev 3 Accessory Frame Bracket I QMAFBU Quick Start Guide Installation Tools Required:PV wire clips,1/2"socket and torque wrench. 1 1` In a standard landscape or portrait array, the With the cap screw threaded into the bracket, Slide this assembly onto the module frame with Accessory Frame Bracket should be installed at slide the cap screw into the slot on the module the bracket behind the module frame,the module least 5 inches from the edge of the module and level electronic mounting bracketwith the bracket level electronic mounting bracket in front of the at least 1 inch in from the edge of the module behind the module level electronic mounting module frame. junction box. bracket. Place the frame clamp over the edge of the Tighten the cap screw with a half-inch socket and Neatly coil the wires and clip to module frame. module frame, and in front of the module level torque wrench to a torque of 15 foot-pounds. electronic mounting bracket. Slide the assembly up and to the left to engage cap screw into frame clamp slot. Notes: Be sure to comply with all state, local,and module level electronic requirements. Find UL 2703 Installation Instructions here: www.quickmountpv.com/pdfs/OMAFBU UL.pdf For UL 2703 listing,see UL Constructional Data Report here: www.quickmountpv.com/quickrack/pdfs/OMAFB-UL2703-Listing_pdf BI 7.2.3-37_1 Oct-2018,Rev 3 w r. CO 00 The New High Density 5' Racking System- Footpr*int. i o emag P Now you can build more , powerful rooftop solar systems faster and easier , than ever before with AL the new high density _ EcoFoot5D T11 Racking System. � &"L Built on the Industry-Preferred EcoFooto Platform, with More than 20OMW Installed. 18.4% More Power Elegantly Simple Installation Cost-Saving Logistics & Support Small 7x16.7" roof-friendly EcoFoot5D delivers preassembled Stackable bases enable a huge modular Base and dense 9.9" parts and an out-of-the-box, ready- per-pallet shipping capacity. Fewer inter-row spacing enables a to-go installation that is unlike any pallets are required, minimizing tightly packed solar array that other flat-roof racking.The result shipping, storage and onsite crane delivers 18.4% more power than is a seamless installation process use. Dedicated engineering support 10° systems. Whether your roof from start to finish, saving on time prevents issues before they happen is small or large, EcoFoot5D and minimizing job-site impact. and provides quick solutions if provides more power, lowering obstacles arise. cost-per-watt. W. Ecolibrium1qnlar Contact:740.249.1877 1 sales@ecolibriumsolar.com I www.ecolibriumsolar.com The S *Implest Way to Elegant Installation, Right Out of the Box. Organized Work Flow and Preassembled Parts C ., �'• When you're on the roof,you need ready-to-go components t and a simple install.That's why installers prefer the 1 '�, 1• EcoFoot Modular Platform: Bases self-align and parts are preassembled so no PV panel preparation is required,which enables non-stop installation from box to roof. Only with EcoFoot Modular • • • Now, EcoFoot5D delivers the elegant installation process IV �• ' only EcoFoot modular systems provide and packs the array with 18.4%more power than a 10' system. `. Installer-centric design provides unsurpassed advantages: �. : .. • Simple, preassembled parts • Self-aligning Bases fall in line as modules are placed • w • Low-effort roof layout,just two chalk lines required _ _ Innovative • No PV panel prep, non-stop install from box to roof Pr , • Six simple installation steps EcoFoot Modular Platform. No training required - 5-minute learning curve 290kW of Bases Delivered on 1 Standard Pallet. Efficient Logistics On and Off the Roof Increase Your Bottom Line From shipping to deployment,the EcoFoot5D System reduces your shipping,storage and roof-loading i needs significantly.The result?Creating " i Unbeatable SolarMore profit perjob. • Stackable Bases and low Racking for Commercial • • - part count streamline logistics —:. Since 2010, • • Solar • 290kW of Bases delivered revolutionized • • _with the on 1 standard pallet FAST• • •• Modular • Small footprint minimizes Platform •flat-roofarrays • . contact with roof • • • .• •• • Slip sheet costs are low, With • _ _• on • drainage is excellent • Lightweight and roof-friendly pitched roofs nationwide,we bring • Ideal for residential and the beauty of • to solar. commercial flat roofs • Suited for mild or extreme roof undulations Streamline logistics with up to 290kW of Bases per pallet. Max Out Your Roof* . -,Ums,,,- 5 Simple Components. 1 Sweet System. Mid-Support i Ballast Tray A C-7 � EcoFoot5D Base Preassembled Universal Clamp Wind Deflector Wire Management in a Snap. Ballast Placement that Beats All. Accessible & Protected Ergonomic, Cost-Saving and Fast Simply snap wire clips into Base to route wires between rows. Place ballasts between rows for easy reach. • No UV exposure: row-to-row wires covered by Ballast Tray • No awkward under-module access • Easy access to wires during install and throughout • Rapid Ballast Tray install,sliding into Base retention clips the life of the system with removable Wind Deflector • Ballast Tray strong enough to walk on,even and in-row ballast placement when loaded with ballast blocks sit • Minimal roof contact means smaller slip �_ sheets, lowering costs Um6eabalsle 6 Simple Installation Steps. Step 1 Step 2 Step 3 Install Clamps in Bases-No Tools Required. Only Two Chalk Lines Needed. Secure PV modules onto Bases. Drop preassembled Measure&markMI: Space modules Clamps into Base, ` 2 chalk lines, using alignment push in Clevis Pins, ♦ " v Bases self-align marks on Clamps, Base is ready to r as modules drop torque Nut provided install. ti into place. to 14 ft-lbs. Step 4 Step 5Step 6 Install Mid Support. Install Ballast Tray and place ballast blocks. Install Wind Deflector. Press the Upper and Slide Tray into ,.'" Place Wind Deflector Lower Mid-Supports retention clips on into slot on Base, onto the module Base,east/west. attach using Rocker frame. Place ballast blocks Nut provided. without reaching using 1 sturdy,walk-on tray. Technical Specifications. Validation Summary. Clamping range:32-50mm Roof pitch: 0°-7° • Certified to UL2703 Fire Class A Dimensions: Ballast requirements: 4"x 8"x 16" for Type I and II modules 16.7"L x 7"W x 6.2"H Wind tunnel tested: 150 mph • Certified to UL2703 Grounding and Bonding Typical system weight: 2.4-7.7 psf Warranty: 25 years • SEAOC seismic compliant Module orientation: Landscape Slip sheets: not required by Tilt angle: 5' Landscape Ecolibrium Solar. If required by Module inter-row spacing: 9.9" roofer, use 7"x16.7" under Base; 2"x3" under Mid-Support. Get the EcoFoot5D Advantage. Ecolibrium Solar provides engineering support for your project from concept to completion. Contact us for a specific project bid,to schedule a product demo, or to learn more about simple,fast and cost-effective EcoFoot5D High Density 5' Racking. Call 740.249.1877 or email Sales@EcolibriumSolar.com Ecolibrium Sola. 740.249.1877 1 sales@ecolibriumsolar.com I www.ecolibriumsolar.com I Boulder,CO Athens,OH ©2017 Ecolibrium Solar,Inc.,EcoFoot5D is a trademark of Ecolibrium Solar,Inc.Registration pending. EcoFoot and Ecolibrium Solar are registered trademarks of Ecolibrium Solar,Inc. 1 3 0"18 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 553 through 5560 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work, earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List, ordering o Daily check-in o Customer interaction and training activities