Loading...
10 Hawley ZPA 2019 File#MP-2020-0007 APPLICANT/CONTACT PERSON ROMAN CATHOLIC BISHOP OF SPRINGFIELD ST JOHN CANTIUS ADDRESS/PHONE 65 ELLIOTT ST PROPERTY LOCATION 10 HAWLEY ST MAP 32A PARCEL 171 001 ZONE CB THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid T eof Construction: ZPA-DEMO BUIING AND REDEVELOP PROPERTY WITH 23-3 STORY LD TOWNHOUSE LIVING UNITS New Construction Non Structural interior renovations Addition to Existing Accessory Structure iiuildina Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PR.�NTED: Approved // Additional permits required(see below) 1 2- PLANNING PLANNING BOARD PERMIT REQUIRED UNDER: § I� r ryka,,� $A-e- Intermediate Project:—Site Plan AND/OR S 1 Permit with Site Plan Major Project: Site Plan AND/OR Special Permit with Site Plan n .3 72 a L-- ZONING BOARD PERMIT REQUIRED UNDER: § — Finding 1� Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed "-///Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health �/Permit Permit from Conservation Commission from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management 1 Date Signature of Building Official Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all Zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact the Office of Planning.&Development for more information. ti t� v , x All t'ti r 1„ ., d gig't 2 -t:, ., y}} yy y .5 too On oil! K' Jj .# } � Y File No. i/1'1 t�-� ��- � _ . 1 7-7 == FF ZONING PERMIT APPLICATION (§10.2) �g ldin Please type or print all information and return this f Boil g Inspector's Office with the $3o filing fee (check or mdney order)�paygble to the city of Northampton DFPT.OF RUILDING INSPECTIONS NORTHAMrION,PAA 01060 1. Name of Applicant: O'Connell Development Group --Y Way,- Y -- 800 Kell Wa Holyoke, MA 01040 Telephone: (413) 534-0243 2. Owner of Property: Roman Catholic Bishop of Springfield, St.John Cantius Address: 65 Elliott Street, Springfield, MA 01105 Telephone: (413) 732-3175 3. Status of Applicant: Owner Contract Purchaser X Lessee Other (explain) 4. Job Location: 10 Hawley Street, Northampton, MA 01060 Parcel Id: Zoning Map# 32A Parcel# 171 District(s): Central Business In Elm Street District In Central Business District X (TO BE FILLED IN BY THE BUILDING DEPARTMENT) 5. Existing Use of Structure/Property: Former Catholic Church Structure, Rectory, Community Center Structure 6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary): Demolition of Rectory and Community Center Building. Reuse of Church Structure, Redevelopment of Property with (23)-3-Story Townhouse Living Units. 7. Attached Plans: Sketch Plan Site Plan X Engineered/Surveyed Plans X 8. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW X YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW X YES IF YES: enter Book Page and/or Document# 9.Does the site contain a brook, body of water or wetlands? NO X DON'T KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , date issued: (Form Continues On Other Side) W:\Documents\FORMS\original\Building-Inspector\Zoning-Permit-Application-passive.doc 8/4/2004 10. Do any signs exist on the property? YES NO X IF YES, describe size, type and location: Are there any proposed changes to or additions of signs intended for the property? YES NO X IF YES, describe size, type and location: 11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan of development that will disturb over 1 acre? YES X NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building Department EXISTING PROPOSED REQUIRED BY ZONING Lot Size 79,393.4 SF 79,393.4 SF Frontage 206.8' 206.8' Setbacks Front 14.8' 18.6' (new), 14.8' (ex) Side L: 21.2' R: 19.8' L: 22.2' R: 22.4' L: R: Rear 121.5' 21.9' Building Height 60'+/- Steeple 60' +/- Steeple + 40' new townhouses Building Square Footage 6,618 (church) 9,231 (C.C.) 55,200 SF + 6,618 (church) 4,030 (rectory) %Open Space: (lot area minus building Et paved 46 % 55 % parking #of Parking Spaces 10-spaces striped + No exterior spaces 30 +/- unstriped #of Loading Docks 0 0 Fill: N/A N/A (volume Et location) 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. r c Date: August 27, 2019 Applicant's Signature Vt V08 NOTE:Issuance of a zoning permit does not relic a an applicant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health,Conservation Commission, Historic and Architectural Boards,Department of Public Works and other applicable permit granting authorities. W:\Documents\FORMS\original\Building-Inspector\Zoning-Permit-Application-passive.doc 8/4/2004