Loading...
Mail - CarportLouis Hasbrouck <lhasbrouck@northamptonma.gov> Carport 1 message Louis Hasbrouck <lhasbrouck@northamptonma.gov>Thu, Aug 8, 2019 at 12:05 PM To: chrislarareo@gmail.com Cc: Kevin Ross <kross@northamptonma.gov>, Carolyn Misch <cmisch@northamptonma.gov> Chris, The car port won't meet setback requirements; it's too close to the side lot line. The city map shows your attached garage right on the side lot line. Even with the allowance for the existing non-conformity, the carport would need to be at least 10' from the side lot line. I attached a screen shot of the city map. I can't see a way you could make this work. Louis Hasbrouck Building Commissioner City of Northampton Town of Williamsburg (413) 587-1240 office (413) 587-1272 fax 19 Baker Hill map.pdf 678K