Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
23D-149 (31)
125 HINCKLEY ST BP-2020-0895 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block:23D- 149 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2020-0895 Proiect# JS-2020-001526 Est.Cost:.$34479.00_ Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sq.111 54450.00 Owner: LUCEY BARBARA Zoning: URB(100)/ Applicant: PIONEER VALLEY PHOTOVOLTAICS AT: 125 HINCKLEY ST Applicant Address: Phone: Insurance: 311 WELLS ST - SUITE B (413) 772-8788 Workers Compensation GREEN FIELDMA01301 ISSUED ON:2/10/2020 0:00:00 TO PERFORM THE FOLLOWING WORK.-ROOF MOUNTED SOLAR, 30 PANELS 9.81 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Sianature: FeeType: Date Paid: Amount: Building 2/10/2020 0:00:00 $75.00 212 Main Street, Phone(413)587-1240, Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner RSG So L,6 ,z i-, Department use only City of North mpt n FEB Stat of Permit: Building Department 5 2026 Cury Cut/Driveway Permit ` 212 Main Stre Sever/Se Ptic Availability Room ' QO o Nop i j tDtNG W er/W II Availability �. Northampton, MA OTO HAMpTpN►M pEC �FWA SJetof Structural Plans Of phone 413-587-1240 Fax 413-587-1272 Plans Other Specify APPLICATION TO CONSTRUCT,ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office Map Lot Unit 125 Hinckley St. Florence, MA Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Barbara Lucey 125 Hinckley St. Florence, MA Name(Print) / Current Mailing Address: Telephone Signature 2.2 Authorized Agent: Pioneer Valley Photovoltaics 311 Wells St. Greenfield, MA 01301 Name(Print) Current Mailing Address: ac 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 9,212 (a) Building Permit Fee 2. Electrical 25,267 (b) Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) #7S- 5. Fire Protection 6. Total = 0 +2+ 3+4 + 5) $34,479 Check Number y n Q/ This Section For Official Use Only Building Permit Number: ,�Y 0- d `7� Date Issued: Signature: a (.� Lel Building Commissioner/Inspector of Buildings Date buildingpermits @ pvsquared.coop EMAIL ADDRESS (REQUIRED; EITHER HOMEOWNER OR CONTRACTOR) Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: Rear �� 0 Building Height Bldg. Square Footage % Open Space Footage (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DON'T KNOW O YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO Q DON'T KNOW O YES Q IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained O Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading, excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5- DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing ❑ Or Doors D Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [[] Siding [O] Other[[ZI] Brief Description of Proposed Installation of racking system for solar PV Work: Alteration of existing bedroom Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes x No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Barbara Lucey as Owner of the subject property PV Squared (Pioneer Valley Photovoltaics) hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. See Attachment A See Attachment A Signature of Owner Date PV Squared as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Bill Killough-Hill Print Nam Signature of Owner/Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder Daniel Gomez Gonzalez License Number 43 Hatfield St. Northampton, MA 01060 CS-111266 Address Expiration Date 03/14/2021 Signature �/r��� Telephone 413-772-8788 9. Registered Home Improvement Contractor: Not Applicable ❑ Pioneer Valley Photovoltaics Cooperative Company Name Registration Number 311 Wells Street, Suite B, Greenfield, MA, 01301 140077 Address Expiration Date 413-772-8788 Telephone 09/15/2021 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L. c. 152, §25C(6)) _7 Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes.......7 No...... ❑ City of Northampton J Massachusetts? '<< DEPARTMENT OF BUILDING INSPECTIONS z 212 Main Street •Municipal Building uti Cam w+" 1 Northampton, MA 01060 Debris Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. The debris from construction work being performed at: 125 Hinckley St. Florence, MA (Please print house number and street name) Is to be disposed of at: PV Squared Solar 311 Wells St. Greenfield, MA (Please print name and location of facility) Or will be disposed of in a dumpster onsite rented or leased from: (Company Name and Address) S ature of Permit Applicant or Owner Date If, for any reason, the debris will not be disposed of as indicated, the Applicant or Owner shall notify the Building Department as to the location where the debris will be disposed. DocuSign Envelope ID: 2EEAE7D2-975A-4046-B4ED-8463AA5BC183 Attachment A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley Photovoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley Photovoltaics Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. Barbara Lucey 11/25/2019 1 1:52 PM EST Printed Name Date bay by: bay carx WA� System Owner Signature Title Make a Payment Online Proposal and Agreement#00015433 Page 6 of 12 Barbara Lucey-November 24,2019 PROJECT INFORMATION: SQ Uq Q RSO • Owner: Barbara Lucey • Address: 125 Hinckley Street Florence, MA 01062 _t _ <RT a S_ • Phone: (413)230-4203(mobile) PV Squared Solar 311 Wells Street,Suite B • Email: bJIUCey@COfilC3St.net Greenfleld,MA01301 design@pvsquared.coop • System Size: 9.81 DC-STC 413-772-8788 JOB: ---- • Modules: SunPower SPR-E20-327 • Rail: Ironridge XR100 PV System to Existing PV --- • Bases: Ecofasten Quikfoot be installed System SITE: 125 Hinckley Street • Snow Load: 40 lbs Florence,MAO 1062 • Wind Speed: 117 mph REVISIONS: ROOF STRUCTURE: Site Plan A No Scale • 18° Engineered AJM 20 Joists @ 16"OC Description Item Qty QF-AL-M QuikFoot AL Base 66 ROOF MATERIAL: QFL-BLK-812 QuikFoot Flashing BLACK 66 • Asphalt shingles SCL-101-3-ANODZD Slotted L-Foot Sin BLACK 66 GRKRSS2 5/16x3-1/8in fastener 132 PROJECT NOTES: PROFLEX26100 GEO-CEL clear 4 XRL100-168BLK Ironridge XR100 Rail 168 BLACK 10 1. Framing location to be verified on site. XRL100-204BLK Ironridge XR100 Rail 204 BLACK 5 2. Slide rail assembly as needed to avoid SPLIC2 Ironridge XR100 Splice 10 interfering with splices or bases. 3. Unless otherwise noted bases are staggered UFO-CL-001-8 Ironridge Universal Module Clamp BLACK 72 and spaced not more than 48" O.C. UFO-STP-46MM-B Ironridge Stopper Sleeve 46mm BLACK 24 4. Additional or alternative bases may be used XR100ENDCAP (1 Pair UR)IR XR100 End Cap Rail 12 to meet actual roof conditions. IRN 29-50TB-005 1/4-20 x 3/4 T-Bolt OPT mount kiT 30 TITLE: Site Plan IRN GD-LUG-003 Ironridge Low Profile Grounding Lug 6 ---- TW029-4000-077 Ironridge Plastic Clip 60 FDN#: 12424 DCS-1307 Wire Management Clip 120 BY: JG ASG SSM-R2 BAR SSM-R2 Snowguard Bar(2") 3 DATE: 1/31/2020 ASG SSM-R2 BRKT SSM-R2 Snowguard Bracket 5 ASG SSM-R2 SPLICE SSM-R2 Snowguard Splice 2 SCALE: No Scale SIZE: 8-1/2"x 11" ASG SSM-R2 STRIP SSM-R2 Snowguard Color Strip ELK 22' ASG SSM-R2-END SSM-R2 Snowguard End Bracket 2 PV-01 B Mechanical Balance of System(MBOS) (Sheet 1 of 2) 1"space between rows. 3" Between Array Edges J Sau4R* Stagger edges to 1. Array 249Y6" Existin g Array a //�•1\\ 10 increase snow retention. �qr PV Squared Solar 311 Wells Street,Suite B Greenfield,MA 01301 design@pvsquared.coop i 413-772-8788 JOB: M SITE: 125 Hinckley Street m I >= Florence,MA 01062 O Q O REVISIONS: d' 1 ) 1 2 SSM-R2 Snowguard along bottom edge. Array Layout 2„ 4116" —* 16" TITLE: Array Layout RAIL SPECIFICATIONS _ FONn: lzaza Make&Model: Ironridge XR100 _ BY: JG Clamp Torque: 80 in-lbs DATE: 1/31/2020 L-Foot Torque: 250 in-lbs kD Max Span: 65" __ SCALE: As Shown Max Cantilever: 21" SIZE: 8-1/2"x11 — — 113/16" MODULE SPECIFICATIONS: (46mm) PV-02 ` ,_O Make&Model: SunPower SPR-E20-327 r V Clamp Range: 2"to 16"on all sides SPR-E20-327 Dimensions Module Size: 61-5/16"x 41-3/16"x 1-13/16"(46mm) B 1/4"=r-0" (Sheet 2 of 2) Serial No: � RF Q ir PV Squared Solar 311 Wells Street,Suite B Greenfield,MA 01301 design@pvsquared.coop 413-772-8788 JOB: ---- SITE: 125 Hinckley Street Florence,MA 01062 REVISIONS: TITLE: Module Map FDN#: 12424 BY: JG DATE: 1131/2020 SCALE: No Scale SIZE: 8-1/2"x 11" STRING INFORMATION: Strings: 2x15 Inverter: (1)SolarEdge SE10000H-US PV- 1 O Optimizer: (30)SolarEdge P400 Module: (30)SunPower SPR-E20-327 (Sheet i of 1) -- � ROOF FRAMING PLAN DESIGN ASSUMPTIONS -------------------- Loads: -------------conpctor List------------- TIC Live: 35 Psf B/C Live: 0 P!f los qty Modal xuw• yine wr fasteners Itw/taws mad Mer tsetawr.thiP/i+ek� TIC Dead: 15 PSI B/C Dead: 5 psi slop r tail Lad Case: Snots r xoM sae. w a —1-T-1Z-------------- ^" ection Criteria: xi fa LSSUa310 18 i' It ndx1.5` p 18.4 cladf5.pdt "^""� L1360 Live L/240 70Ca1 .... ________ __------ _-_----------[�------y._._�_-___—-----__------— __—----,_--�--------__-------------�________________________ .-.+.. Building Code: IBC/IAC fAlloxable Stress De Design ass—continuous lateral bracing for both edges. AN ADDITIONAL. 5 LBS OF DEAD LOAD ZS ADDED FOR SOLAR LOADING R8 R8 0 1/21 X 3- 2" VWIMUH CUM 1 :1-1) 3-1/2' ------- Floor Framing Material ------- B S TZ md I-goo so WID02.3 lom CA alp eapna L��y,aw�. Type Q<Y• Product Length II " ____ __ ___ R2 1 19"AJS 20 30. 0• G3p,V 3-!/Z X -1 - �4P R4 2 22. 0• TM mm I"B B S BT 1/ 5-1/4- R6 1 20. 0• 8 ID .! RB 4 v 16' 0• v Total length: 158. 0• s 8 31 31 ------- Roof Framing Material ------- G2 i I i 11 3 1 if I Vlf if If if 1-3 1 if If If 11 If 4,B�Po4 BgIL WALL Type ay_ Product Length TTJL Rl 30 14• AJS 20 30. 0• PLB 2)(6.BTWS.BOIL R3 14 v v 22'.0- TO 2• 0"TO OR L Its 2B 20• 0• R7 17 16. 0• Rq 1 30, 0• I Nil 1 v 6. 0• R4 R10 I 5. 0• R12 1 2' 0" v Total length: 2063' 0• ------- Bass,a Ledger Material ------- Type Qty. Product Length • ____ Length R4 G1 3 1-3/4x14 VERSA-LAM 2.0 3100 SP 22' 0• G2 3 22. 0• G3 2 7. 0• v G4 2 v 16. 0• Total length: 178. 0- ------- Post Material ------- Lit B C301Type Qty. Product Length P1 3 Column by others ' 0• .t t...:r e.. �.. Total length: 3"0-0 L s e L ------- Miscellaneous Material! ------- R8 iks I Type Qty. Product Length ------ ---- ------- ------ ARX 1R/L1 v 14"AJS 20 84. 0• I A%% fR/L1 v 100. 0"Total length: 184. 0• All product nanes are tradewarls of-their respective owners 0' 01 40 0^ Thi.layout has Man.—ted u.inq the rotor--from the pl.n p—lded, all/or ver hal int ormat fon i rk Miles Inc. NOTES fr em the general eoncr•etoc.r.k Mile>•.sup.no re.pon•lall ity los tai.layout if Ifl alt erN during conscr ucti on of any et tM.ruecurai member.shoxn.re net —li M r.k.Mile. € f �� � F It is the r!,o,.ibility of tM nuildisq a tr•etor/onN[to instal,all/ r oversee cM insc•llacion 21 West St. of all its engineered Meod ewgaonent.c • Lire cae8r11anw"ith tM m.nufacturers specificeti,,—f.ny [f f i q �haemes aremadetdthisProlactaf< of ovr layeK collect R1t Mile. i A - West Hatfield Ma. c G.I.•�r.� CS Structure"'i 2016.5.1 tBuild 2f WrightBuildersHinekleyTrace- 9-29-16 knuBeamEl 2016.5.0.2 1213 m Mater : ials Database 1555 p 2 of 10 Member Data Description:Call Member Type: Joist Application: Roof Comments: Top Lateral Bracing: Continuous Slope: -6.50 / 12 Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Snow Load: 35 PSF Deflection Criteria: L/240 live, U180 total Dead Load: 15 PSF Deck Connection: Nailed Filename: C:\KMW\JOBS\ 1241 O 1241 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Girder SPF Plate(425psi) N/A N/A 405# 2 12' 4.062" Wall SPF Plate 425 si N/A 1.500" 405# Maximum Load Case Reactions Used for applying point loads(or line loads)to carrying members Snow Dead 1 272#(204plf) 133#(990f) 2 272#204 If 133#99 If Design spans 13' 3.125' Product: 14" AIJS 20 16.0" O.C. PASSES DESIGN CHECKS Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Lateral support is required at each bearing. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 1180.'# 6092.'# 19% 6.12' Total Load D+S Shear 3564 20611 170% 0' Total Load D+S End Reaction 405.# 1437.# 28% 12.34' Total Load D+S TL Deflection 0.0791" 0.8841" L/999+ 6.12' Total Load D+S LL Deflection 0.0532" 0.6631" U999+ 6.12' Total Load S Control: Max End React. DOLS: Live=1001/ Snow=1151/. Root=125% Wind=1601/ Web stiffener and minimum bearing length requirements at hangared connections depend on the connection style and are not included in this design. OF MgSSq�yG CHRISTOPHER G DUDEK �, CIVIL v No.29566 o e FF � -T AL All product names are trademarks of their respective owners Doug Hodgins rk Miles Inc. Copyright(C)2016 by Simpson Strong-re Company Inc.ALL RIGHTS RESERVED. 21 West.St. "Passing isdefined as when the member,floorjoist,beam orgirder,shown on thisdrawing meets applicable design criteria for Loads,Loading Conditions,and Spans listed on this sheet.The design must be reviewed by a qualified designer or design professional as required for approval.Thisdesign assumes product installation according to the manufacturers specifications. West Hatfield Ma. AC`OR�® CERTIFICATE OF LIABILITY INSURANCE DATE //22019019 Y) 12//2727 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Linda Powers,CRIS NAME: Webber 8 Grinnell PHONE (413)586-0111 FAx (413)586-6481 AIC No Extl: AIC,No 8 North King Street E-MAIL (powers@webberandgrinnell.com ADDRESS: INSURERS)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURERA: Ohio Casualty/Liberty 24074 INSURED INSURER B: Ohio Security/Liberty 24082 Pioneer Valley PhotOVOItaics Cooperative,Inc. INSURER C: Continental Indemnity/AUW Attn:Kim Pinkham INSURER D: 311 Wells Street,Suite B INSURER E Greenfield MA 01301 INSURER F COVERAGES CERTIFICATE NUMBER: Master Exp 1-2021 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR TYPE OF INSURANCE POLICY EFF POLICY EXP LIMITS LTR INSD WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE TO CLAIMS-MADE � OCCUR PREMISES Ea occurrence) 300,000 MED EXP(Any one person) $ 5,000 A BKS57072282 01/01/2020 01/01/2021 PERSONAL a ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMITAPPLIES PER: GENERAL AGGREGATE $ 2,000,000 X POLICY D PRO LOC [PRODUCTS $ 2,000,000 JECT OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 Ea accident X ANYAUTO BODILY INJURY(Per person) $ B OWNED SCHEDULED BAS57072282 01/01/2020 01/01/2021 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY Hx AUTOS ONLY PeraccdentX $1 K toll $1 K comp Underinsured motorist BI $ 300,000 X UMBRELLA LIAB OCCUR EACH OCCURRENCE $ 3,000,000 A EXCESS LIAB CLAIMS-MADE US057072282 01/01/2020 01/01/2021 AGGREGATE $ 3'000'000 DED RETENTION$ $ WORKERS COMPENSATIONPERX STATUTE EORH AND EMPLOYERS'LIABILITY YIN ANY PRO PRI ETOR/PARTN E R/EXECUTIVE E.L.EACH ACCIDENT $ 1������ C OFFICER/MEMBEREXCLUDED? NIA 37-592871-01-03(Ma&NY) 01/01/2020 01/01/2021 (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ Business Pers Property $1,750,000 Commercial Property A BKS57072282 01/01/2020 01/01/2021 Installation $25,000 Transportation $75,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Worker's compensation ncludes Ma and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD \ The Commonwealth of Massachusetts Department of Industrial Accidents I Congress Street,Suite 100 Boston,MA 02114-2017 r www massgov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Lezibly Name(Business/Organization/Individual): Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): 1.[Z]I am a employer with 48 employees(full and/or part-time).* 7. ❑New construction 2.❑1 am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 9. El Demolition 3.a I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 10 ❑Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.❑I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.❑ repairs re airs These sub-contractors have employees and have workers'comp.insurance.: 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.❑✓ Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Continental Indemnity/AUW Policy#or Self-ins.Lic.#:37-592871-01-03 Expiration Date:01/01/2021 Job Site Address:125 Hinckley St. City/State/Zip:Florence, MA 01062 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce r t e alAs and penalties of perjury that the information provided above is true and correct Si natu - —" Date: 112212020 Phone#:413-7f2-87 8 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Commonwealth of Massachusetts Division of Professional Licensure Board of Building Regulations and Standards Const`AtCtidrl `Sdp�rvisor K CS-106329E�ires03/14/2020 Ile l f MAYA FULFORD i 159 CLARK DRIVE 1 GIULFORD VT 05301 ' t�1 ,r>r�'`,�J S;S�A Commissioner CEL I40LbFZ -EO-- Wf--z, 4AvFz- 1GWr O i�rz 0)4 F-I LE. Office of Consumer Affairs and Business Regulation 1000 Washington Street - Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration Type: Corporation Registration: 140077 PIONEER VALLEY PHOTOVOLTAICS COOP r Expiration: 09/15/2021 311 WELLS ST SUITE B GREENFIELD, MA 01301 a o w t a i v�0 �M 5V SCA, a 20M-W17 Update Address and Return Card. Ax" ��irliQC/tUdP.r.�l Office of Consumer Affairs&Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Corporation before the expiration date. If found return to: Registration Expiration Office of Consumer Affairs and Business Regulation 140077 09/15/2021 1000 Washington Street -Suite 710 PIONEER VALLEY PHOTOVOLTAICS COOP Boston,MA 02118 EVAN D.DICK 311 WELLS ST SUITE Bj�n GREENFIELD,MA 01301 Undersecretary Not valid without signature S U N P43WE R* SOLAR PANELS MORE ENERGY FOR Lir-:, - HIGH PERFORMANCE & EXCELLENT DURABILITY ddmliL x � for,* SERIES • 20.4% efficiency Ideal for roofs where space is at a premium or where future expansion might be E20 327 PANEL needed. • High performance HIGH EFFICIENCY6 Delivers excellent performance in real world Generate more energy per square foot conditions, such as high temperatures, clouds and low light.1,2,3 E-Series residential panels convert more sunlight to electricity producing 36% more power per panel,' and 60% more energy per square foot • Proven value over 25 years.3,4 Designed for residential rooftops, E-Series panels deliver the features, value and HIGH ENERGY PRODUCTION' performance for any home. Produce more energy per rated watt High year one performance delivers 7-9% more energy per rated Watt.3 This advantage increases over time, producing 20% more energy over the first 25 years to meet your needs.4 0 120% More Energy _ 110% Per Rated Watt Maxeone Solar Cells:Fundamentally better. ° 100% 8%more,year] Engineered for performance,designed for durability. 90% 35%more, 0 o year 25 Engineered for peace of mind >, so% Designed to deliver consistent, trouble-free C 70% Conventional energy over a very long lifetime.°,5 a`a, 60% r Designed for durability N s0% The SunPower Mo s to axeon Solar Cell is the Years is zo 25 only cell built on a solid copper foundation. O 10% ��ERGY pF� Virtually impervious to the corrosion and 3 J Maintains High F cracking that degrade Conventional Power at High Temps s°�° / Panels.4,5 o J No Light-Induced / vHOTON 0 6% Degradation ?�'-FiELOj�, #1 Ranked in Fraunhofer durability test.10Q { High Average Watts 100% power maintained in Atlas 25' rn 4% Better Low-Light and comprehensive PVDI Durability test." Spectral Response Lu 2% -� High-Performance o Anti-Reflective Glass 0% www.sunpower.com SUNPOWER E-SERIES • AR PANELS MORE E14ERGY. FUR 11 SUNPOWER OFFERS THE BEST COMBINED POWER AND PRODUCT WARRANTY POWER WARRANTY PRODUCT WARRANTY 100 95% 90% 85% 75% 0 5 10 15 20 95 0 5 10 5 c0 ,.. Years Yenr_ More guaranteed power: 95%for first 5 years, Combined Power and Product defect 25 year coverage -0.4%/yr.to year 25.8 that includes panel replacement costs. ELECTRICAL DATA OPERATING CONDITION AND MECHANICAL DATA E20.327 E19-320 Temperature -40°F to+185°F (-40°C to+85°C) Nominal Power 12(Pnom) 327 W 320 W Max load Wind:50 psf, 2400 Pa, 245 kg/m2 front 8r back Power Tolerance +5/-0% +5/-0% Snow: 112 psf,5400 Pa,550 kg/m2 front Avg.Panel Efficiency13 20.4% 19.8% Impact resistance 1 inch (25mm)diameter hail at 52 mph(23 m/s). Rated Voltage(Vmpp) 54.7V 54.7 V Appearance Class A Rated Current(impp) 5.98 A 5.86 A Solar Cells 96 Monocrystalline Maxeon Gen II Open-Circuit Voltage(Voc) 64.9 V 64.8 V Tempered Glass High transmission tempered Anti-Reflective Short-Circuit Current(Isc) 6.46 A 6.24 A Junction Box_ IP-65 Rated Max.System Voltage 60_0 V UL& 1000 V IEC Connectors MC4 Compatible Connectors -- Maximum Series Fuse 15 A Frame Class 1 black anodized (highestAAMA rating) - - - Power Temp Coef. -0.38%/°C Weight 41 lbs(18.6 kg) Voltage Temp Coef. -176.6 mV/°C TESTS AND CERTIFICATIONS Current Temp Coef. 3.5 mA/°C Standard tests UL1703 (Type 2 Fire Rating),IEC 61215, IEC 61730 REFERENCES: Quality tests ISO 9001:2008,ISO 14001:2004 1 All comparisons are SPR-E20-327 vs.a representative conventional panel:250W, EHS Compliance RoHS,OHSAS 18001:2007,lead free approx. 1.6 m2, 15.3%efficiency. Ammonia test IEC 62716 2 PVEvolution Labs"SunPower Shading Study,"Feb 2013. Salt Spray teat IEC 61701 (passed maximum severity) 3 Typically 7-9% more energy per watt, BEW/DNV Engineering "SunPower Yield - -- -- --- -- Report,"Jan 2013. PID teat Potential-Induced Degradation free: 100011110 4 SunPower 0.25%/yr degradation vs. 1.0%/yr conv. panel. Campeau, Z. et al. Available listings UL,CEC,CSA,TW,JET,KEMCO,MCS,FSEC "SunPower Module Degradation Rate," SunPower white paper, Feb 2013;Jordan, Dirk"SunPower Test Report,"NREL,Oct 2012. 5"SunPower Module 40-Year Useful Life"SunPower white paper, Feb 2013. Useful life is 99 out of 100 panels operating at more than 70%of rated power. 6 Second highest, after SunPower X-Series, of over 3,200 silicon solar panels, Photon Module Survey, Feb 2014. 1046 mm 7 8%more energy than the average of the top 10 panel companies tested in 2012 [41.2 in] (151 panels, 102 companies),Photon International,Feb 2013. 8 Compared with the top 15 manufacturers. SunPower Warranty Review, Feb 2013. 9 Some exclusions apply.See warranty for details. 10 5 of top 8 panel manufacturers from 2013 report were tested, 3 additional 46 mm ►I If 1559 mm --► silicon solar panels for the 2014. Ferrara, C., et al. "Fraunhofer PV Durability [1.8 In] [61.4in] Initiative for Solar Modules:Part 2".Photovoltaics International,77-85. 2014. 11 Compared with the non-stress-tested control panel. Atlas 25+ Durability test report, Feb 2013.from 2013 report were tested, 3 additional silicon solar panels for the 2014. Ferrara, C., et al. "Fraunhofer PV Durability Initiative for Solar Modules:Part 2". Photovoltaics International,77-85. 2014. 12 Standard Test Conditions(1000 W/m2 irradiance,AM 1.5,25°C). 13 Based on average of measured power values during production See http://www.sunpower.com/facts for more reference information. For more details,see extended datasheet:www.sunpower.com/datosheets.Read safety and installation instructions before using this product, www.sunpower.com mDecember 2014 SunPower Corporation.All rights reserved.SUNPOWER,the SUNPOWER logo,MAXEON,MORE ENERGY.FOR LIFE.,and SIGNATURE are trademarks or registered trademarks ra emar of SunPower Corporation.Specifications included in This dotasheet are subject to change without notice. Document A 504860 Rev D/LTR-US IRONRIDGE XR100 Rail See Descri tion / Length Rail Section Properties Property Value Total Cross-Sectional Area 0.582 int .66 Section Modulus (X-axis) 0.297 in', .46 Moment of Inertia (X-axis) 0.390 in Moment of Inertia (Y-axis) 0.085 in Torsional Constant 0.214 in' Polar Moment of Inertia 0.126 in" 1.99 APPROVED MATERIALS: 2.44 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) .58 I2S Clear Part Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132''(11 Feet) 7.50 lbs. XR-100-168A XR-1OD-168B XR100, Rail 168''(14 Feet) 6000-Series 9.55 lbs. XR-100-204A XR-100-204B XR100, Rail 204" (17 Feet) Aluminum 11.60 lbs. V1.1 IRONRIDGE XR100 Bonded Splice XR-100 RAIL i 12.0 1 XR-100-SPLC-BD KIT, XR100 BONDED SPLICE 2 1) Splice, XR100, Mill 12" long 2) Screw, Self Drilling 1 (3F 1.24 63 1.93 .31 0.42 .15 93 #12-14 TYPE "B"THREAD Property Value Property Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish Clear V1.0 QuikFootPRODUCT GUIDE Exploded Product View/B.O.M. - 1 Installation Instructions - 2 Cut Sheets - 3 Specifications -4 f �I 01 I. , .1111::. I r •, I� 1 1 p Iv 1 I i� 7 i1' i E 1 t x ! (�, ��• T f l A 41 I�j! Q)tEcoFasten 1 x i S ° V 1 QuikFoot— Product Guide Exploded Product View, Bill of Materials Materials Needed for Assembly 7 _ Item No. Description of Material/Part Quantity 0 6 1 QuikFoot Base Plate 1 i 2 Fastener(Length to be determined) 2 5 L 3 QuikFoot Flashing 1 4 EPDM Washer 1 O5 L-102-3"Bracket*(other options available) 1 r w 4 6 5/16"EPDM Bonded 18.8 SS Washer 1 1 7 3/8"Stainless Steel Hex Nut 1 3 Q, Required Tools o V � 877-859-3947 EcoFasten Solar All content protected under copyright.All rights reserved.10/09/14 1.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 132 6,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 132 8,209,914 132 8,245,454 132 8,272,174 132 8,225,557 B2 QuikFoot— Product Guide Cut Sheets: QF-AL-Base 2X 0 .33in [8.38mm] GD OE E OOE c) N L-0 N U� CO C14 Lr) 0 w O � 1 .50in V [38.10mm] 3/8"-16 Stud ■�■ E E O� � � �? Q F-M : 1 .5" u QF-L : 1 .75" 877-859-3947 EcoFasten Solar All content protected under copyright.All rights reserved.10/09/14 3.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 6,225,557 B2 QuikFoot— Product Guide Cut Sheets: QFL-812 R.38in [9.53mm] .032in [0.81 mm] VIM* 0 a� 12.00in [304.80mm] w 0 V �o 3.00in [76.20mm] .50in 8.00in [ 12.70mm] [203.20mm] 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.10/09/14 32 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 rf" _ 1- QuikFoot— Product Guide Cut Sheets: Bracket Options-SCL-101-3 3/8" � A 46 SERRATIONS LOL r i 17/8" Rl/16 _ 3/4" 1/16" R.005 r/ R.OI 0 C� 2X R.OI 60.000 / / 3/8"±.002 Y 1/8, ' 0 7/8" X 820 DETAIL A SCALE 3:1 877-859-3947 EcoFasten Solar All content protected under copyright.All rights reserved.10/09/14 3.7 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 82 8,153,700 B2 8,181,398 132 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 132 8,225,557 B2 QuikFoot- Product Guide Specifications PART 1 -GENERAL 1.1 SUMMARY 1.3 SUBMITTAL A. WORK INCLUDES A. Submit manufacturer's written specifications. B. Base plate is 6000 series aluminum with one 1. QuikFoot base plate attachment bracket that B. Submit standard product cut sheets. PEM Type Press-In Stud 18.8 SS. attaches directly to the roof deck. C. Submit installation instructions. C. Fasteners to be compatible with chosen roof ® 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values for the roof system. ultimate and allowable load values specific to as shown in load test data. B. RELATED SECTIONS the roof deck specified for the project. D. Counter flashing is.032 gauge aluminum em- 1.Section 07600:Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500:Roofing 1.4 QUALITY ASSURANCE plate O 3.Division 1:Administrative and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4.Division7:Thermal and Moisture Protection the area of the project. 1.2 SYSTEM DESCRIPTION A. Bracket is mill finish aluminum A. COMPONENTS: 1.5 DELIVERY/STORAGE/HANDLING B. Base flashing-Black-kynar painted 1. QuikFoot system consists of aluminum Inspect material upon delivery.Notify manufacturer bracket and base plate with(1)stainless steel within 24 hours of any missing or defective items. PART 3-EXECUTION stud,(1)stainless steel nut,(1)EPDM washer Keep material dry,covered,and off the ground until and(1)bonded stainless steel and EPDM installed. 3.1 EXAMINATION washer. A. Substrate:Inspect structure on which brackets 2. Fasteners PART 2-PRODUCTS are to be installed and verify that it will with- A.To be of metal compatible with QuikFoot stand bracket. 2.1 MANUFACTURER any additional loading that may be incurred. B. Fasteners should be selected for compat- EcoFasten Solar 289 Harrel Street,Morrisville,VT 05661 B. Notify General Contractor of an deficiencies O ibility with the roof deck. fY Y C.Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the www.ecofastensolar.com V system.See test data at C. Verify that roofing material has been installed 2.2 MATERIALS correctly prior to installing solar attachment www.ecofastensolar.com A. Attachment Bracket brackets. 3. Sealant(if required by roof manufacturer): 6000 Series Aluminum(choose one) to be roof manufacturer approved. 3.2 INSTALLATION 4. Aluminum counter-flashing 1.CP-SQ-Slotted� A. Comply with architectural drawings and project Y 5. Aluminum attachment bracket 2. F-111-A � 3.P-3-CSK engineers recommendations for location of / B. DESIGN REQUIREMENTS: 4.SCL-101-3 system.Comply with Manufacturers written in 1. Bracket spacing to be recommended by 5. L-102-3" stallation instructions for installation and layout. project engineer. 6.L-102-6" 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. It is important to design new structures or 8.Custom assess existing structures to make sure that they can withstand retained loads. 877-859-3947 EcoFasten Solar"All content protected under copyright.All rights reserved.10/09/14 4.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 132 8,153,700 132 8,181,398 132 8,166,713 132 8,146,299 B2 8,209,914 132 8,245,454 132 8,272,174 B2 8,225,557 132 3/8" A 46 SERRATIONS �o L 1 7/8RI /16" " 1 /4" 00 3/4.. � 1 /16" R.005 R.010 2X R.01 I 60.000 3/8"-.002 �✓ 1 /8" 0 7/8" X 820 DETAIL A .X = +/- .1 SCALE 3:1 .XX = +/- .01 .XXX= +/- .005 289 Harrel Street V ; Morrisville, VT 05661 S C�--101 -3 QSolaro Toll Free Phone 1.877.859.3947 Toll Free Fax 1.888.766.9994 MATERIAL: 6000 SERIES ALUMINUM web www.ecofastensolar.com e-mail info@ecofastensolar.com SCALE: 1:1 1/6/2012 SHEET 1 OF 1 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, [earner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 553 through 5560 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work, earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List, ordering o Daily check-in o Customer interaction and training activities &QUq � R� a0. , PV Squared Solar I www.pvsquared.coop Phone:413-772-8788 1 Fax:413-772-8668 311 Wells St.,Ste. B I Greenfield,MA 01301 ti�ig7 ..ams OSP MA Elec. Lic.A13764 I MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Maya Fulford Installation Manager