Guidance on generic notice of intent for public worksDEP WESTERN REGION Fax
n
aand resource are affected (e.g. .culvert replacement in temporary stream); anticipated
date of completion.
Descrivzio_h of any method currently used. nv the DPW to track roadwork. projects_
Dis,osal of waste material (what, where and how) as typical for the DPW. Waste
disposal shall be compliant with .41 federal; state and local requirements_
Q A statement that project limits of work will he within the town right -of only. 11 the
DPW will need to unde_rt•ze work on property other than the public A ay, a procedure
for accessing private property .shoulci. be d aibeti. It is not the 4 ntion of the GNOI
process zocess to allow for private landowners to avoid. indisi "u s under the Wetlands
protec+son Act and associated Regulations-
Nov 20 2001 11:43
S. Work Protocol
What steps are taken when] .n what sequence; see recommendations under Work Protocol,
see Section b below. The Wcrlc Protocol is one of the most important components of the
GNOI. Any and all individual maintenance projects undertaken under the GNOI, though
diverse in character (e.g. road 'grading, catch basin cleaning, vegetation management, etc.)
most follow the Work Protocol. The. Work Protocol establishes the process through which
vetlar:td resource protection is achieve .d..
4. Schematic Plans:
Include any schematic or conceptual plans ,hat the local DPW crew can refer to during
routine maintenance ac*i'Jities; many DPWs won't have these available. Examples can be
found in published EOEA and DEP guidance documents, as listed in the APPE ICIES TO
GENJ-iC NOTICE OF TN7NT (Section It below), including:
Ditch (repair and cleaning)
U Culvert replacement in temporary stream.
Culvert raainiet'sance
End wall repair
o Re- grading road surfaces and cro »ring
Q Re-paving roads (inc;.udinQ pothole rzpv
n CzzttirLg egetafion along tights of-way
o Catch basin clearing
G
Securing site at esicl of day /project
Guard zrai cosutruction
E. APPENDICES TO GElv l.0 0Q c ;E Gl: INTENT•
The follo Ong E0F_A and DEP Manuals can be used as guidance during implementa of
maintenance projec undertaken under the Generic Order.of Conditions:
1_ MA DEP Stormwater Policy. Volume •se` sections on Mrinferlance and Maintenance
Criteria for the following structures and oth
a Extended Detention-Basins
Q Wet Retention Ponds
n Cat+ r fr sa:e =twater W�ttc rid.
Water Quality Swales
For WEi O internal. rev ONLY (12-20 00)
NOT FOR INT NAL OR EXTERNAL. DISTEI'SUTION
P. 04