Loading...
101 Riverside PB 2018Planning - DecisionCity of Northampton Hearing No.:PLN-2018-0042Date: March 26, 2018 APPLICATION TYPE:SUBMISSION DATE: PB Intermediate SitePlan2/8/2018 Applicant'sName:Owner'sName: NAME: NAME: VERIZON WIRELESSNationalGrid ADDRESS:ADDRESS: 99 EAST ST25 ResearchDrive TOWN:STATE:ZIP CODE:TOWN:STATE:ZIP CODE: EASTHARTFORDMA06108WESTBOROUGHMA01582 PHONE NO.:FAX NO.: PHONE NO.:FAX NO.: 413) 737-1131 EMAIL ADDRESS: EMAIL ADDRESS: Site Information:Surveyor'sName: STREET NO.:COMPANY NAME: SITE ZONING: 101RIVERSIDEDR URB(100)/ TOWN:ADDRESS: ACTION TAKEN: FLORENCEMA01062 Approved MAP:BLOCK:LOT:MAP DATE: SECTION OF BYLAW: 23D049001 Chpt. 350- 11: SitePlanApproval TOWN:STATE:ZIP CODE: Book:Page: 2338214 PHONE NO.:FAX NO.: EMAIL ADDRESS: NATURE OF PROPOSED WORK: INSTALLAWIRELESSTELECOMMUNICATIONSANTENNAANDRELATEDEQUIPMENTON ANANEXISTINGUTILITYPOLEwithinthe right-of-waynear101RiversideDrive HARDSHIP: CONDITION OF APPROVAL: FINDINGS: ThePlanningBoardapprovedtherequestfornewtelecommunicationsequipmenttobelocatedonanexistingnationalgridutilitypole basedontheinformationsubmittedwiththeapplicationasfollows: Coveragemaps, constructiondrawings , sitejustification TheBoardgrantedthesiteplanbasedupondetermining thecriteriahadbeen metin boththesiteplanstandards350-11.6andthe permittingfortelecommunicationfacilities. A. Therequesteduse protectsadjoiningpremisesagainstseriouslydetrimentaluses. Thisisanexpansionoftheexistingutilitypole installedonthestreet. B. Therequestedusewillnotchangeexistingvehiculartrafficmovementorsafetyon thestreet. C. Thesitewillfunctionharmoniouslyinrelation tootherstructuresandopenspacesto thenaturallandscape, existingbuildingsand othercommunity assetsin theareaasitrelatestolandscaping, drainage, sight lines, buildingorientation, massing, egress, and setbacks. Addedequipmenttothepolewillnotchangethefunctionofthepoleasapieceof infrastructureforvariousutilities. D. TherequestedusewillnothaveaneffectontheCity'sresources, includingtheeffect ontheCity'swatersupplyanddistribution system, sanitary andstormsewagecollectionandtreatmentsystems, fireprotection, streetsandschools. E. .Therequesteduse meetsanyspecialregulationssetforthinthischapterasitrelatestotelecommunicationsfacilitiesin350-10.9for colocationand aestheticstothemaximumextentwhichispracticaland technologicallyfeasible, toensure compatibilitywithsurrounding landuses. Thisshallinclude, butnotbe limitedto, thefollowingitems: COULD NOT DEROGATE BECAUSE: FILING DEADLINE:MAILING DATE:HEARING CONTINUED DATE:DECISION DRAFT BY:APPEAL DATE: 3/1/20183/15/20184/5/2018 REFERRALS IN DATE:HEARING DEADLINE DATE:HEARING CLOSE DATE:FINAL SIGNING BY:APPEAL DEADLINE: 3/8/20184/14/20183/22/20184/5/20184/15/2018 FIRST ADVERTISING DATE:HEARING DATE:VOTING DATE:DECISION DATE: 3/8/20183/22/20183/22/20183/26/2018 SECOND ADVERTISING DATE:HEARING TIME:VOTING DEADLINE:DECISION DEADLINE: 3/15/20187:00 PM6/20/20186/20/2018 MEMBERS PRESENT:VOTE: Euripedes DeOliveiravotes to GeoTMS® 2018 Des Lauriers Municipal Solutions, Inc. Planning - DecisionCity of Northampton Hearing No.:PLN-2018-0042Date: March 26, 2018 Alan Versonvotes toGrant Dan Feltenvotes toGrant John Lutzvotes toGrant Mark Sullivanvotes toGrant MOTION MADE BY:SECONDED BY:VOTE COUNT:DECISION: Mark SullivanDan Felten4Approved MINUTES OF MEETING: AvailableontheCity'swebsite atwww.northamptonma.gov I, CarolynMisch, asagenttothePlanningBoard, certifythatthis isatrueandaccuratedecisionmadebythePlanningBoardandcertify thatacopyofthisandall planshavebeenfiledwiththeBoardandtheCityClerkonthedateshownabove. Icertifythatacopy ofthisdecisionhasbeen mailedtotheOwnerandApplicant. NoticeofAppeal Anappealfromthe decisionof thePlanningBoardmaybemadebyanypersonaggrievedpursuanttoMGLChapt. 40A, Section17as amendedwithintwenty (20) daysafterthedateofthefilingofthenoticeofthe decisionwiththe CityClerk. Thedateislisted above. Such appealmaybemadeto theHampshireSuperiorCourtwithacertifiedcopyoftheappealsenttotheCityClerkoftheCity ofNorthampton. GeoTMS® 2018 Des Lauriers Municipal Solutions, Inc.