Loading...
Form 8a Engineer Certification.pdfBucky Sparkle, PE 378 Main St., #2, Easthampton, MA 01027 617.271.4004 or zengineerbucky@gmail.com 12 September 2019 City of Northampton Conservation Commission c/o Sarah LaValley, Conservation, Preservation and Land Use Planner Northampton Office of Planning and Sustainability City Hall 210 Main Street, 2nd Floor Northampton MA, 01060 413-587-1263 SLaValley@northamptonma.gov Project:Prospect Woods – Warburton Way Owner:Prospect Woods Homeowner’s Association Subject:Statement of Substantial Compliance – DEP File #WE 246-0707 References:1. Plans entitled “Prospect Woods Pavement Rehabilitation: Warburton Way, Northampton, MA” prepared for Prospect Woods Homeowner’s Association prepared by The Zengineer dated 10/7/16 2. Notice of Intent for “Prospect Woods Pavement Rehabilitation: Warburton Way, Northampton, MA” prepared by The Zengineer dated 6/28/17 Order of Conditions:Issued 8/30/17 Inspections:Final Cover – 7/31/19 Installer:Marion Excavating Co., Inc., PO Box 13, 510 New Ludlow Road, South Hadley, MA 01075, 413-536-1267 Per 310 CMR 10.05(9)(d) Certificates of Compliance, I hereby certify that, based on the visual observations and plan information noted above, to the best of my knowledge and belief, the subject project has been constructed within acceptable construction tolerances, and in substantial conformance with the Amended Order of Conditions. Brightly, Bucky Sparkle, PE The Zengineer 1 of 1