Form 8a Engineer Certification.pdfBucky Sparkle, PE
378 Main St., #2, Easthampton, MA 01027
617.271.4004 or zengineerbucky@gmail.com
12 September 2019
City of Northampton Conservation Commission
c/o Sarah LaValley, Conservation, Preservation and Land Use Planner
Northampton Office of Planning and Sustainability
City Hall
210 Main Street, 2nd Floor
Northampton MA, 01060
413-587-1263
SLaValley@northamptonma.gov
Project:Prospect Woods – Warburton Way
Owner:Prospect Woods Homeowner’s Association
Subject:Statement of Substantial Compliance – DEP File #WE 246-0707
References:1. Plans entitled “Prospect Woods Pavement Rehabilitation: Warburton Way,
Northampton, MA” prepared for Prospect Woods Homeowner’s Association
prepared by The Zengineer dated 10/7/16
2. Notice of Intent for “Prospect Woods Pavement Rehabilitation: Warburton
Way, Northampton, MA” prepared by The Zengineer dated 6/28/17
Order of Conditions:Issued 8/30/17
Inspections:Final Cover – 7/31/19
Installer:Marion Excavating Co., Inc., PO Box 13, 510 New Ludlow Road, South Hadley,
MA 01075, 413-536-1267
Per 310 CMR 10.05(9)(d) Certificates of Compliance, I hereby certify that, based on the visual
observations and plan information noted above, to the best of my knowledge and belief, the subject
project has been constructed within acceptable construction tolerances, and in substantial
conformance with the Amended Order of Conditions.
Brightly,
Bucky Sparkle, PE
The Zengineer 1 of 1