Loading...
994 Perc 2019 City of Northampton Board of Health 2019 ` 212.Main Street Northampton, MA 01060 P 413-587-1214 Fee Collected': Perc Test Date: i[E APPLICATION MUST BE SUBMITTED 10 BUSINESS DAYS PRIOR TO THE SCHEDULING OF A PER S�`� Application for Percolation ("Pere") Test Ivy Date of Application: 'L � Home Owner Name: Address: '4l City/Town/State/Zip Code: I inn SOIL EVALUATOR, LICENSE NUMBER: R.S.)(, Engineer❑ wi ADDRESS PHONE io g E-MAIL p EXCAVATOR (back-hoe opemtor) ADDRESS PHONE PLEASE MAKE ALL CHECKS PAYABLE TO THE CITY OF'NORTHAMYTON CHECK LIST C54-4ew Construction ❑ Repair/Upgrade ***Number of Lo s to be Perc Tested New Construction only- Give Lot Numbers*** ❑ Dig Safe Sign-Off: Gas/Electrical ❑ 'french Permit/Info Sign Off from DPW 587- For Board of Health Use Only CITY of NORTHAMPTON PUBLIC HEALTH DEPARTMENT Public Health Director—Merridith O'Leary P Municipal Building—212 Main Street—Northampton, MA 01060 Phone (413)587-1215—Fax(413)587-1221 http://www.northamptonma.gov/245/Health Perc Test/Soil Evaluation Form Property Address:oa4 FID 6(4tc ::� _ ... Owner's Name: Date: Performed by: �bl'l1, ' L�.W L- W OOa� N 3 � J Witnessed by: C ► l�`Y,SIfGi qqu � 3 , No. of Bedrooms: I � Y,•�- P 3 Garbage Grinder? �Yes E/ `No,. Fee Paid? Yes' - To Sketch of property,and(location of deep holes/perc(s) � r Percolation T}}est Pere Hole# 1 2 3 4 J Ele� : 3� `�Elev: Elev: Elev: ,a Start pre-soak :z® End pre-soak , 3 t Time @ 12" i z Time @1c� {}#9 Time @ 6" Q I � R r:x ...r,. :� rY=; t3� '. �1 �:: � rr '3..e'" y3 �� 7 t Elapsed�.time .( l _ I _ :R - s .L A "� 9"-6" Rate (min/in) n .' g�ccss d S ear c d Qn I Dca bt i RCo F0 ( 1 DESIGN CALCULATIONS Lift Pump Station 108B Florence Road Florence MA 01062 Bedroom Count: 3 Daily Flow: 330 gallons per day I Pump Chamber: 1,000 gallon concrete tank Dimensions 7.30 feet length 4.30 feet width 4.65 feet depth to inlet invert Invert Elevation: 99.5 feet Alarm level: 97.8 feet Pump On Level: 97.4 feet Pump Off Level: 96.1 feet Reserve Capacity: 1.2 days Head Calculations: 90°bends: 0 ea.= 0 feet 45°bends: 2 ea.= 8 feet tees: 0 ea.= 0 feet unions: 1 ea.= 2 feet check valves: 1 ea.= 15 feet pipe length: 10 ft.= 10 feet total length: 35 feet Force Main Dia: 2 inch dia. Pipe volume: 2 gallons per cycle Friction Head: head/100": 3.1 ft.= 1 feet Static Head: rise: 5 feet Total Head: 40 feet Dosings 2 cycle(s)per day, from pump curve-, Liberty Pump FL-32M 1/2 hp,208 V. Note: Utilize above pump,as available from Underground Supply Co.,or approved equa y=mx+b intercept: 42 slope: -0.32 Flow Rate-, 29 gallons per minute Run Tim ei 5.7 minutes Total Pumped Volume, 165 gallons per cycle Florence Rd.-lot, Northampton Pump Chamber Bouyancy Calculations: Pump Tank Weight: 18,765 pounds Surface Area of Tank: 40 square feet Soil Bury Depth: 13 inches Depth of Tank in Groundwater: 41 inches Volume Displaced: 1,027 gallons Weight Displaced: 8,423 pounds I Net Bouncy Calculation: -342 pounds lift Weight.of Concrete: 150 :pound per cubic foot Volume of Counterweight: 0.0 cubic feet concrete = 0 bags redi-mix stacked no more Thickness of Counterweight: 0.0 inches average than 1 bag high of wss,�c / Tt1 DMAE& LEVE #1172 z EO S���p� Homestead Inc. «Updated» 4/16/19 Florence MAW, Northampton Volume and Flotation Calculations Septic Tank .Calculations Nominal Volume: 1,500 gallons Underground Supply Inc. Stock Number ST-1500 Septic Tank Dimensions: Mi imum Requirements Width: 68 inches outside measurements Height: 68 inches outside measurements Length: 126 inches outside measurements Height of Outlet Invert: 51 inches inside measurements Wall thickness: 0.33 inches Wall Taper: 4 inches Net Working Volume: 201 cubic feet Surface Area of Tank: 60 square feet Gross Displacement Volume: 320 cubic feet Gross Displacement Volume: 2627 gallons Tank Bouyancy Calculationi: Elevations GroundSurface: 101 .8 Tank Surface: 100.6 Septic Tank Outlet Invert: 99.8 Seasonal High Groundwater: 28 inches below grade 99.5 Septic Tank Weight: 11,670 pounds Top of Tank: 14 inches below grade Soil Bulk Density: 85 pounds per cubic foot Weight of Overburden: 6,069 pounds Total System Weight: 17,739 pounds Tank in Groundwater: 54 inches Volume Displaced: 0 gallons Weight Displaced: 17,230 pounds Net;Bouncy Calculation: -509 pounds lift Weight of Concrete: 150 pound per cubic foot Volume of Counterweight: -3.4 cubic feet concrete = c- Thickness of Counterweight: 0.0 inches averageOF�ISs�c Z+>s yG o TM01111UE #1172 a 9FP�'��RED S Homestead Inc. 4116119 DESIGN CALCULATIONS I Lift Pump Station 1081 Florence Road Florence MA 01062 Bedroom Count: 3 Daily Flow: 330 gallons per day Pump Chamber: 1,000 gallon concrete tank Dimensions 7.30 feet length 4.30 feet width 4.65 feet depth to inlet invert Invert Elevation: 99.5 feet Alarm level: 97.8 feet Pump On Level: 97.4 feet Pump Off Level: 96.1 feet Reserve Capacity: 1.2 days Head Calculations: 90°bends: 0 ea.= 0 feet 45°bends: 2 ea.= 8 feet tees: 0 ea.= 0 feet unions: 1 ea.= 2 feet check valves: 1 ea.= 15 feet pipe length: loft.= 10 feet totaI length: 35 feet Force Main Dia: 2 inch dia. Pipe volume: 2 gallons per cycle Friction Head: head/100": 3.1 ft.= 1 feet Static Head: rise: 5 feet Total Head: 40 feet Dosing: 2 cycles)per day from pump curve: Liberty Pump FL-32M 1/2 hp,208 V. Note: Utilize above pump,as available from Underground Supply Co.,or approved equal. y=mx+b intercept: 42 slope: -0.32 Flow Rate: 29 gallons per minute Run Time: 5.7 minutes Total Pumped Volume: 165 gallons per cycle I