WORK SITE SHEET DATE: 5/23/2019 & 5/24/2019
Daniel Hathaway Woodworking Delivery Address
2 Old Goshen Rd 18 Hillside Rd
Williamsburg, MA 01096 Northampton, MA
Type of project: 3 Season Room
Qty Category Galv. Black Fixed H. Ad . H Ext.
5 P2-8G X 6X6
1 P2-12G 10' X 6X6
Installer: ❑ Michel ❑ Sylvain ❑ Cod ❑ Keven ❑ Dave ❑ Richard ■ Paul
SKETCH OF WORKSITE
B A C K
OF
HOUSE
3 5
MAPPING OF POSTS
Rotary Head: ❑Gearbox [1212-125 ■212-200 ❑212-250 ❑ A 50
# PSI Depth #Type Bearing # PSI Depth #Type Bearing
1 1500 5'-9" P2-8G 9188 LBS
2 1500 6'-0" P2-8G 9188 LBS
3 1500 5'-8" P2-8G 9188 LBS
4 1500 5'-8" P2-8G 9188 LBS
5 1500 5'-9" P2-8G 9188 LBS
6 1500 7'-10" P2-12G 10' 9188 LBS
Signature of installer: Xlwl,GZe.
Page 1 of 2
This process for the above listed project involved the screwing of specifically
designed and engineered posts applicable for this project. PSI readings were
taken on each individual post during the installation and with the use of a
correlation table these measurements are listed and described below:
• PSI/Torque: Pounds per square inch /The rotational pressure taken to
drive the post
• Depth: The distance downward from its top surface.
• Type: Piers are categorized for each individual specific project
• Bearing: Downward pressure post can withstand
• Pinned: Bored into solid immoveable rock reaching maximum compression
and tension. Once the post was driven one additional test was performed, the
percussion test. This test involves striking the post with a sledge hammer, 5
times per set, while being measured for resistance. Once there is zero
downward moment the post and pressures are verified.
• Uplift: The force required to pull the post out of the ground, the uplift value is
half of the bearing.
Page 2 of 2
technoMetalPost of Connecticut Invoice
766 Marion Road
Cheshire, CT 06410 Date Invoice #
5/28/19 11850
Bill To Ship To
Daniel Hathaway DBA 18 Hillside Road
Daniel A. Hathaway Woodworking Northampton, MA
2 Old Goshen Road
Williamsburg, MA 01096
P.O. No. Terms Rep Project
5-23/5-24 Paul
Item Description Qty Rate Amount
Service Installed piers to support a 3 season room( 05/23/2019) 5 220.00 1,100.00
Service Installed piers to support a 3 season room 10'-0" long ( 1 260.00 260.00
05/24/2019)
Give us a call and we'll support your world Total
$1,360.00
WW W.technometalpost.com
Payments/Credits -$1,360.00
Balance Due $0.00