Loading...
17C-103 (8) 17STILSON AVE BP-2019-1418 GIS 0: COMMONWEALTH OF MASSACHUSETTS MaR.Block: 17C- 103 CITY OF NORTHAMPTON Lot-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Cateeorv:SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit 4 BP-2019-1418 Proiect 4 JS-2019-002278 Est.Cost:$18798.00 Fee:$75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sa.ft.): 9886.12 Owner: STORPER BARBARA F Zoning:URB(100V Applicant. PIONEER VALLEY PHOTOVOLTAICS AT. 17 STILSON AVE ApplicantAddress: Phone: Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON:611712019 0:00:00 TO PERFORM THE FOLLOWING WORK:ROOF MOUNTED SOLAR, 11 PANELS 3.96 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy signature: FeeTvoe: Date Paid: Amount: Building 6/17/20190:00:00 $75.00 212 Main Street, Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner 17 STILSON AVE BP-2019-1418 GIs#: COMMONWEALTH OF MASSACHUSETTS MamBlock: 17C- 103 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGLLcc.1144/2�A) Categom SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2019-1418 Proiectk JS-2019-002278 Est.Cost:$18798.00 Fee:$75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sp.ft.): 9888.12 Owner: STORPER BARBARA F Zoning:URB000 Applicant: PIONEER VALLEY PHOTOVOLTAICS AT: 17 STILSON AVE ApplicantAddress: Phone., Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON.611712019 0:00:00 TO PERFORM THE FOLLOWING WORK:ROOF MOUNTED SOLAR, 11 PANELS 3.96 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House4 Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeTVpe: Date Paid: Amount: Building 6/17/20190:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner File 4 BP-2019-1418 APPLICANT/CONTACT PERSON PIONEER VALLEY PHOTOVOLTAICS ADDRESS/PHONE 311 WELLS ST-SUITE B GREENFIELD (413)772-8788 PROPERTY LOCATION 17 STILSON AVE MAP 17C PARCEL 103 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee PaidC� Buildin¢Permit Filled out Fee Paid Tweof Construction: ROOF MOUNTED SOLAR 11 PANELS 3.96 KW New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 111266 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO,RAIATION PRESENTED: Approved_Additional permits required(age below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance' Received&Recorded at Registry of Deeds Proof Enclosed _Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay 2 c- m Sigfia'fare of Building Official Date Note: Issuance of a Zoning permit does not reBeve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission, Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. 11C- ion Department use only City of Northampton Status of Permn'. Building Department Curb Cut Dnveway Permit 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability Northampton, MA 01060 Two Sets of Structural Plans phone 413-587-1240 Fa Z C' �in r�pe, APPLICATION TO CONSTRUCT,ALTER IF EPAII ,RENOVATE OR DEMOL SH A DNE OR TWO FAMILY DWELLING JUN 1 0 2019 SECTION 1 -SITE INFORMATION 1.1 Property Address'. se ion to be completed by office DER OF BUILDING INSPECTIONS NORTHA T N,MA01000 Lot-Unit 17 STILSON AVE, FLORENCE MA 01062 Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: COADY ROBYN B&NORMAN J 17 STILSON AVE,FLORENCE MA 01062 Name(Print) Currant Meiling Address: (347)585-1176 See attachment (A) Teklewne Signature 2.2 Authorized Aaent: Pioneer Valley PhotoVoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Print) Current Melling Address: 4413-772-8788 Signature TekPhone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $4,767 (a)Building Permit Fee 2. Electrical 14,031 (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee �\^ 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) $18,798 Check Number 0 Z This Section For Official Use Only Building Perms NumberDate Issued: Signature: E G- 1y-ZD)q Building Commissionernnspeclor of Buildings Dele yau4 A ��o PV Squared Salarl www.Pvsquared.coop Phone:413-772-87881 Fax:413-772-8668 311 Wells St,Ste.81 Greenfield,MA 01301 : .o•'� MA Elec Uc.A13764I MA HIC 140077 I Dear Town Inspections Officials, Please see our enclosed Ipplications to permit a Solar Photovoltaic System in your jurisdiction. As you are lily aware , PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in regnfield We have installed thousands of PV Systems out of our eld Greenfi , MA Headqua rs since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations.Our worksite guidelines are created with the Intention of exceeding all safety,electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines,including electrical engineering,structural engineering,civil engineering,electricians,construction supervisors, roofers,and their associated helpers. We are a company that values training and education.We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30,2009 Massachusetts Board of State Examiners of Electricians(BSEE)judgements,and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electriclan's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review,as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that Is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This wlumn w be fillM in by Building Department Let Size Frontage —� Setbacks Front O Side i.:_-1 RL_ L:—1 R: Rear Building Height Bldg.Square Footage % C. Open Space Footage P,uterea minus bldg&Wved .. #ofPuking Spaces 0 Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book F-- Pagel and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES © NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Stonn Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicablel Now House ❑ Addition ❑ Replacement windows Alteratlon(s) Rooting El Or Doore 0 Accessory Bldg. ❑ Demolition ❑ New Signs lot Decks (p Siding[O] Other[CM Bnef Description of Proposed )k J1_1d"r a A 3' &It Work; PV array will be installed on the south facing roof of the building, filling in areas left o en ba first PV sysn m. Altemtio�W e�Jng bedroom_1e`es No Adding new bedroom Ya X No Attached Narrative Renovating unfinished basement _Ya X tb Plans Attached Roll -Sheet 6a. If New house and or addition to exletina housing- complete the following: a. Use of building :One Family Two Family Other b. Number of rooms in each family unit Number of Bathrooms c. Is there a gamge attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodsloves Number of each g. Energy Conservation Compliance. Masscheok Energy Compliance form attached? h. Type of construction I. Is construction within 100 fl.of"lands?_Yes _No. Is construction within 100 yr. floodplain_Yes No j. Depth of basement or cellar floor below finished grade It. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank CitySewer Private well City water Supply SECTION 7e-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Robyn and Norman Coady as Owner of the subject Property hereby authorize PV Squared to act on my behalf,in all matters relative to work authorized by this building permit application. 5/28/2019 Signature of Owner Date i PV Squared ,as ermer/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Chris Krezmiem PNMNnee _ 5/28/2019 of Ownwl DMs SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor. Not Applicable ❑ Name of License Holder:Daniel Gomez Gonzalez CS-111266 License Number 43 Hatfield Street , Northampton MA 01060 03/14/2021 Address Expiration Date ' �"'-'--0 413-772-8788 Signature Telephone 2.Registered Homa Improvement Contractor: Not Applicable ❑ Pioneer Valley Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Wells Street, Suite B. Greenfield. MA. 01301 09/15/2019 Address Expiration Date Telephone 413-772-8788 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.a.152,¢28C(8)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... El No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 1083.5.1. Definition of Homcowmer.Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A Person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for ell such work Performed under the building permit As acting Construction Supervisor your presence on thcjob site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts Gencral Laws Annotated,you may be liable for persons) you hire to perform work for you under this permit The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature ATTACHMENT A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT 1 hereby agree to the Project as set out above,and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement.I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVohaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes.A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. h 3/8/2019 Printed Name Date ignature Title ftbr C aM lg b,ii.q a0N19 .... aobM CoaAY'febrvary3],3019 - ® Comrnonweallh of Massachusetts Division of Professional Licensure Board of Building Regulations and Standards Construdlon Supervisor CS-111266 Eaplres 03114/2021 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060 Commissioner l ' Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Type Supplement cam PIONEReylstratlon 140077 311 WELLS ST SU PHOTOVOLTAICS COOP Espnatlon: 09115;2019 311 WELLS ST A 0130 GREENFIELD.MA 01301 y s UWate ABdress alq Return Caranr . HOME mer Mun4 CO:;R CTO HOME IMPROVEMENT YENT CORIRgCTORp^ Rglre then vend fordale euel use oMy TYPE:,Lcko ECard Mce MeeiphNmndtle. aw Burelurn at eEidern, A Exp09 f,112. 10 Park Cemumer Affairs170erM BuslnessRryulalian 14OR1) 3915/Ypl9 fOPpY%ue-SUIle 5T1p PIONEER VALLEY PHOTOVOLTAIC.$CJUI' Basten.M90116 1 CHRISTOPHER KREZMIEN {,.y09 — 011 WELLS ST SUITE ` GREENFIELD.MA 01301UnderaBcrelary NLA Valld withot nature The Commonwealth of Massachusetts Department of IndustrialAccidents I Congress Street,Suite 100 Boston,MA 02114-2017 www.massgov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Aoolicant Information Please Print Lceiblv Name(Business/Organimtionrtndividuaq:Pioneer Valley Photovoltaics Cooperative Inc.DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are yon as emph,yerT Chuck the appropda[e box: Type of project(required): LE11 maa employer with 48 employes(fall md/orpan-timet. 7. ❑New construction 2.❑Iam a sole proprierormparmeMip and have no employees working fornwin 8. Remodeling my capacity.[No were ri comp.insurance required] 9. Demolition 3.E]I an a homeowcer doing all work myself.[No workers'comp.insurance required]t 4.01..h nneowmr and will be hiring conMet.to evident dl work or my,poverty. I will 10❑Building addition ensure thrall cunmmma either have wmkvs'compmaation humor«or are ole 11.❑Electrical repairs or additions proprietors with an employma. 12. Plumbing repairs or additions So I son.general cmtrucmr and I have hired me sub-co mann lismi or,We se =torched sheet. I3.�ROof repairs Thesub-conbacmrs base employees and have workers comp,msurmce. 6.❑Wereacorporation andibofficershaveexe Wthea rightofexempdmper MGL c. 14.QOther Solar PV 152,U(4tardwelavesoemployess.[Noworears comp.insnsmectax muck] •My applicmt that checks box#1 must also fill ouos bel t the servos showing their workers comm pensation policy inforation. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside cmmctors most submit a new affidavit indicating such. lConmcmrs that check this box must amehad an additional sheet showing the name of the sub-controm rs and state whether or not hose curno,have employees. If the sub-contactors have employees,Wry must provide their workerscompe policy number. I am an employer that is providing workers'tompensalion insurance for my employees. Below is the policy and job site informaaom lasurenc,Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lic.#:BKS57072282 Expiration Data:01/0112020 Job Site Address:17 STILSON AVE Cit,/Statet2ip:FLORENCE MA 01052 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fore up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. 7 do hereby cc r t e a' ndpena/Res ofperjury that the information provided above is true and correct Si natu . D,,,: 5/28/2019 Phone#-413-7 -808 Official wetonto Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: COBd CERTIFICATE OF LIABILITY INSURANCE °ATE,MM,20,YYYYI lznerzote THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(B),AUTHORMED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: N the certificates holder is an ADDITIONAL INSURED,the policy(Nn)must heva ADDITIONAL INSURED provisions or be endorsed. N SUBROGATION IS WAIVED,subject to the terms and conditions a the policy,certain policies may require an endorsemNlt A statement on this certificate doss not carder rights to the wrM W holder In WHO of such endorsement(s). PamucER ME LIMO Pwwra,CRIS WeDDerIlGrinnell WE., (413)5880111 (/13)5888131 8 NOM King SbeN =93.93. 1ps rsdl" mndgnnrleE. NBVRERa"fFg10Nq COVE1MOE MAL. NorNamplOn MA WORD wINBRA: CMO CssuaityAlmrly 24074 INSURED slelsNa s: Ohio Secur3yADerty 24082 Plower VelkV PhobcWH sCOOpe ".Inc. MNgRaq: Corulmnbl makennllylAIAN AM:Kim Pinkmm MMU p: 311 Wella Bases,SuIM B ImMlml E: Greenfield MA 01301 Mg F: COVERAGES CERTIFICATE NUMBER: Master Expl-2020 REVISION NUMBER: THIS IS TO CERTIFYTNATTHE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUEDTO THE INSURED NAMEDABOVE FORTHE POLICY PERIOD INDICATED. NOTWITHSTANDINGANY REOUIREMENT TERM OR CONDITION OFANY CONTRACT OR OTHER DOCUMERT WITH RESPECTTO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAYPERTUN,THE INSURANCEAFFORDED BYTHE POLICIES DESCRIBED HEREIN IS SUBJECTTOALLTHE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILm FE OF IINSURANCEman ILIJCV NI1BEe WDbVM1YMAMAI LYIB COMMERCMLOENEMALWBMJIY EIGX OCN E B 1.000.000 _ auwsAwoE ®OCCUR PREAREFERIEs. i 300.000 _ IEOEu S 5.000 A BK3570T2232 0Iannoig olith[020 FERaONLLBADv IwURY S 1,000.000 GM%AGOREL MLIMRNhFBFER OFNERALAGGREGATE L 2,000.0OO PCIICY❑P� JECT LCC FROg1LT5-COAiIOPAGG 2,000.000 OTXER'. a MROMONU I-ABILITYNEDAREAR INEDSINGLELIMn S I,Dgg•ggD ANVAUTO BODIY NJ°RY(Fxynm) S B wNU90NLv As osMLFn BAS5M72282 01101/2019 01101/2020 Bova,lNJuRY IFer uJeM1I) S ..D LY uDNONTMiO PRaPERrvDAMA E F AUTOS ONAUn19 G1Y Vmxt¢eM 31Kca1 SIKcpnw Ulkennsuled mplNM BI s 300.000 UMMELI p E/�CX2CIIwIB1aE 3A00.000 A Excess LJAB nes US05707 32 0110114019 0110120go ADDREOm, F 3AOOAW mD I latirsHrocs S WU .caMPEM . P ME AND F.LOY LMBLT1.000.000 Am•pICPPoETpL9MrNER7kCUlrvE Y/M El FACXACCIDBrt C WICEpAE REXCLUDE% O MIA WC/ROR81'R 011012019 011018040 lYmeFMryMMp E1.G9FA9E-FAEMiOYFE I.000.OW mavuamr u 1.000.000 NRIICNWOPEROU.SWY.V E.L.MBEA4E-f Lmr Bum.Pers Pmyerty $1,750,000 A CotmwrctalPropMty BKS5707221ZNYR 01101/2019 011012020 Installation 550,000 Transportation (75,000 OEKRIFTION pFpEM1MNB/LOCATNNB/VEXMLEI MCOR01p1.AMImM MmMrBUFMIA mry NNM[M XmpFepw lF nyYlM) Workers c mnMm mludes Ma.CT,and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRAMN DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPREBENTA IVE 11�- ©19118-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD + I TSA TAS T TTPT9 TA�TITIT�T T�YT��TTi� 1A 1� 1 7 Vreeland Design Associates An integrative approach to design engineering and site planning Date: June 14,2019 To: Adam Thurrell Pioneer Valley Photovoltaics Cooperative 311 Wells Street, Suite B Greenfield,MA 01301 From: David Vreeland, P.E. Vreeland Design Associates Re: Robyn Coady, 17 Stilson Ave,Florence,MA: Structural assessment of existing roof to support proposed solar array. I have reviewed the details of the existing roof framing in the areas of the proposed PV panel installations. The existing rafters of the 1900 2-story farmhouse are full dimension 2x6 installed at 19"-21"on-center, spanning I I'-6"at approximately a 10/12 pitch. In 2015 16 PV solar panels were installed on the south facing roof of the main house. 11 addition PV solar panels are to be installed,2 panels where a chimney used to be and a row of 9 panels along the eave section of the roofjust below the existing array. The roofing is composite asphalt shingles. I have reviewed the mounting details for the proposed solar array.Based on my calculations and a PV solar panel unit weight of 46t lbs,with the attachment points of the array placed at a maximum of 4' on center and staggered to minimize the load to any one rafter,the existing roof framing is adequate to support the proposed PV solar array and the snow and wind load requirements of the current MA State Building Code. Please contact me if you have any questions or need additional information. Sincerely, H oFDAVI ,t{io_ t c V REEL N SL CIVIL y No.66317 As David Vreeland, gFcrsrF* Vreeland Design AssociatesQ"' ENS 116 River Road, Leyden, MA 01337 Phone: (413) 624-0126 Email: dvreeland@verizon.net Fax: (413) 624-3282 PROJECT INFORMATION: &QUA R • Owner. Robyn Coady • Address: 17 Stilson Ave Florence,MA 01062 M . • • Phone: 347-585-1176 wsvwre'sour 311 WN ureec s'"8 • Email: robyncoady®gmaii.com .11 MAo+3oi • System Size: 3.96 kW DC-STC iiemavm • Modules: SunPower SPR-X22-360 x>e: Coady#2 • Rail: Ironridge XR100 • Bases: Ecofasten Quikfoot "uitr9"A"e • Snow Load: 40 lbs rkre.re.run+as3 • Wind Speed: 117 mph A�ks. ROOF STRUCTURE: 40e 2"x6"full rafters CID 2031" ROOF MATERIAL: Existing array Asphalt Shingles Array to be installed. PROJECT NOTES: 1. Framing location to be verified on site. 2. Slide rail assembly as needed to avoid interfering with splices or bases. Part Make/Model QtY 3. Unless otherwise noted bases are staggered and spaced not more than 48"O.C. Base Ecofasten Quikfoot 26 4. Additional or alternative bases may be used Flashing Ecofasten Quikfoot 26 to meet actual roof conditions. L-Foot Ecofasten SCL-101-3 26 mce Site Plan Fastener GRK RSS 5/16"X 3-1/8" 52 _- Sealant Geocel 2 17'XR1 DO Rail, Black Ironridge XR-100-2046 5 roar +ss49 Rail Splice Ironridge XR-100-SPLC-M7 2 ey: IG Rail Clamp,Black Ironridge UFO-CL-01-B7 26 oAn: aenm9 Rail Stopper,Black 46mm Ironridge UFO-STP-46MM-B q stser� N.uak Rail Cap Ironridge XR-100-CAP 2 SUE' Optimizer Bolt Ironridge Ml-BHW 11 PV-01 Mechanical Balance of System(MBOS) R arum B°�4A \ f # Root-380' 40'2"x6"full k May 37317}{` rafters @ 20±1" w SQV,1Z 311 W4,W1.1 S..e Grten ,MA01301 04516'a0'v1PMrM —, xb Coady l2 San: 17 SI Ave So Rorerc4 AIA01062 Q N i ITI61046: o a Existing Array -2 f1 -1 11Ka L-feet above rail at May added to existing bottom of array only. array,shown In Wit red. Below rail otherwise. 16" &Array Layout ins' 41)(i 2" I - - — # miE, Array Layout RAIL SPECIFICATIONS NI Eow: 12249 Make&Model: Ironridge XR100 Av: 1c Clamp Torque: 901n-lbs m L-Foot Torque: 2501n-lbs DATE. 4rtrza19 Max Span: 70" _ _ _ s LE: ins.-I Max Cantilever. 23" 11%6(46mm) SIN strs .u- MODULE SPECIFICATIONS: PR-X PV-02 Make 6 Model: SUnPower SPR-X22-360 - Clamp Range: 2'to 16"on all sides a 114--1-0- Module Size: 61-5/16"x 41-3/16"x 1-13/16"(46mm) D"2of21 • . - More than 22% Efficiency High Performance& Excellent Durability Ideal for roofs where space is at a premium or where future expansion might be needed. 49 Maximum Performance SERIES Designed to deliver the most energy in demanding real-world conditions,in partial shade and hot rooftop temperatures}0^ Premier Technology Engineered with the newest and most powerful saa-xzz-dao Maxeon technology,X-Series brings unmatched power and performance to your home. Highest Efficiency' Generate more energy per square foot X-Series residential panels convert more sunlight to electricity by producing 38%more power per panel'and 70%more energy per square foot over 25 years.'u' Highest Energy Production' Produce more energy per rated watt Maxii Solar Cells:Wndamenrally better High year-one performance deliers 8-10%more energy per rated watt.' Engineered for performance,designed for durability This advantage increases over time,producing 21%more energy over the first 25 years to meet your needs' Engineered for Peace of Mind Designed to deliver consistent,trouble-free uovn -21% 3 En ri ' energy over a very long lifetime. ^ .or. wan c ,wvn Designed for Durability w, The SuoPower Maxecn Solar Cell is the only cell 809° built on a solid copper foundation.Virtually Corventional impervious to the corrosion and cracking that A fi016 degrade conventional panels.' ° s 10 11 20 n Same excellent durability as E-Se ries panels. 0% reap: #1 Rankin Fraunhofer durability test? 3 P..e,:t'x�en;eme. 10096 power maintained in Atlas 25+ no uanrmd—a comprehensive durability tesC° °.x.am0ol Hgd Pvenge Wanz w L.,Ii and SPeLIral PesPon e 2% ni Pe Vreeland Design Associates An integrative approach to design engineering and site planning Date: Match 14,2015 To: Carl Siebing Pioneer Valley PhotoVoltaics Cooperative 311 Wells Street, Suite B Greenfield,MA 01301 From: David Vreeland, P.E. Vreeland Design Associates Re: Robyn Coady, 17 Stilson Ave,Florence,MA: Structural assessment of existing roof to support proposed solar array. 1 have reviewed the details of the existing roof framing in the areas of the proposed PV panel installations. The existing rafters of the 1900 2-story farmhouse are full dimension 2x6 installed at 19"-21"on-center,spanning 1 P-6'at approximately a 10/12 pitch.The existing roofing is asphalt shingles. 1 have reviewed the mounting details for the proposed array. Based on an approximate PV panel unit weight of 41f lbs,with the attachment points of the array placed at a maximum of 42"on center and staggered to minimize the load to any one rafter,the existing roof framing is adequate to support the proposed PV array. Please contact me if you have any questions or need additional infonnation. Sincerely, HOF , i DAVID EELAN 4 VA.� VRCIVIL CIVIL No.18317 David Vreeland,PE e Vreeland Design Associates °j r eNALE 116 River Road, Leyden, MA 01337 Phone: (413) 624-0126 Email: dvreeland@verizon.net Fax: (413) 624-3282 SunPower Offers The Best Combined Power And Product Warranty - Power Warranty Product Warranty any a. o : ta 11 zo Ynal Moreguarantead paver.95%for fust 5 years. Combined Power and Product defect 25-year coverage -0.4961yr.to year 257 Nat includes panel replacement cm SPR-M360 Standard Tetsla ULt]03(Type 2 Fire Rati ),IEC 61215,IEC 61730 Nominal Power(Pral 360 W QualityCento 1509001.2008,15014001:2004 Power Toleranw +5/4% RoHS,OHSAS 18001200],lead free,REACH A 1z.Panel Marital 222% EHS Compliance SVHC.163,W Cycle Rated Voh eNm ) 60F6 SustaInalall Cradle to Cradle(eligible for LEEOpoll-I Rated Current(11 1 5,94A Ammorl IEC 62716 Open Circuit Volt (Vol 69.5V Desert Tet 10.1109INSC.20136144437 Short-Circuli Current ill 6.48A Salt Spray Tart IEC 61701(maxlmurn sever' May.S tem Voltage 600V UL&1000 V IEC PIDTest Potential-Induced Degradation free:1000N Maximum Series Fuse 15A Available Litins UI,TUV JET,CEC Power Tem Caen, -0.30%/°C _ Vbha eTem Coe( 1674 mV/°C x a e Current Temp Coen,. 95 mA/°C Temperature -00^F to+185-F(-40°C to X85°q Impact Resistance 1 inch(25 mm)diameter hail at 52mph(23 m/s) MERERENCEs. Appearance Class Aa 1 All mmpanwm are SMuf2I Ms A,a representoryo conventional para:25OW.Alai l6art, 153.eakkory Solar Cells 96 Monounratalline Maxeon Can 111 211.11y8-10b moreenual per wav,I'..Engroarro uraaer nNa Pepou,nan 1o13. Tempered Glass High transmission tempered anti reflecil 35unromar 025"dquandarm va.1lial oonu panty.GTIRau,Z.at 4. innawAr MMuk oegraeaion wuJ wnPoxr venue paper Feo 2013.Jordan oxk YunPmrer Tout aepm NREL junction Box IP 65,MC4 compatible on eau Wei ht 411bs(18.6 kill OYunWrrtrMMuk 4UVear useNl Ne'SunPwerwlika paper.Mry2015.USNul Yle593wlol WnR 62 psi 3007 Pd 3D5 kg/INhM[&LW.1( ICO parl rgeraung at more train.of rmea paver. Max.Load swgnmalmrer3,zoosakonsokrpanelz melon ModJesursry.Fei2o14 Snow:125 psf,6000 Pa,611 failfront a les more energy Iran sSerin panel ivs more a—,man Ile—.10 a me lop is p,wl Frame Class 1 black anodized(highest AAMA rating) rdnpanasfeoed in 3012 IF 51 parAl 102 rompsieal,Mayon lnlernoal ren 2013. I Compared Mh the lop 15 manufarwrers.sun P Aver Warranty Ropy.ac,2015. M mm 9 Some rnlM'cns and a aclhn—ray apply Re warmry for Mali. 1558 farm � [18inn] 9 xsenea sane aa E.Serkx 5 of lop a[anal manuracon—lerad in 2013 rep ry 3 anduMal -I pantls In.14.Ferrara r_el al.'kaunlwler I DundlrtnAe y Ianlar scar M.J.:Pan 2'. (61 3 in] rrhnu plla-luny".mra1,2014. 'rental PROFlLf 10 Compared.Ino nonan—nand On Vd parer.A S -same as E Series bund In Ana, 2 Catchy real rgwn.Fen 2013. 11 SMMard Test Cor Testi(1 WO w/nt Irradbnce,M115.25°q NREL PillSlarryin 1Oul turn E- SCMsrurrenLuccSFFand Vdrage [41.2 in) �' 12..on arcrage a anis ind urpr Values our,p.d.t.. 13 Type 2 fine rating can ULI M3'.2013,CIas C fireralingpaur ULOa3:2W2. ar°M t<Xesakspersen of delaYz Please read lnesalelyandmaallarbn guide. Sre xv:xsnpvrecmmHa°n Iw mo¢relererce iMomarnn. W una, i,see exNMeddTaaM1eel:VMw.sunpwer.wunhdan ri ooNmenr#51 Air 6 P A/LTN_US /lr IRONRIDGE XR100 Rail See Descri tion / Length Ral Sectbn les Property Volae Total Cross-Seclbml Areo 0.582 '� Section Modulus IX-O)&) 0.297 in' '46 Moment of Inertio %-ends 0.390 In' Moment of Inertb(Y-axis) 0.0&5 n4 Tanbwl Constant 0.214 is' Polar Moment of Inertia 0.1260 APPROVED MATERIALS: 244 1'� 6005-T6.6005A-T61,6105-T5.6N0146 234 (34,000 PSI YIELD STRENGTH MINVALIM) .58 1.25 Clear Part 91ccX Pail Number Number Dwc pt'un/Lenplh Materbi Weld XR-100-132A XR-100-132B %R100, Rat 137(l 1 Feet) 7.50 bs. XR-100.160A I XR-100-1688 XRI00. Ra0168 14 Feet Win° 9.55 bs. XR-10610M XR-100-2018 XRI00 Ra1204"117 Feetl 11.60 bs. Vt.l //r IRONRIDGE XR100 Bonded Splice XR-100 RAIL 12.0 1 XR-100-SPLC-BD KIT, XR100 BONDED SPLICE 2 1) Splice, XR100, MITI 12" long 2) Screw, Self Drilling 1.24 _I .63 93 31 0.42 .15 93 #12-14 T1'PE'B'THREAD Properly Value Properly Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Will Finish Clear v1.0 V Z Q U I k FOO t PRODUCT GUIDE O Exploded Product View/B.O.M. - 1 Installation Instructions-2 Cut Sheets-3 Specifications-4 V 1 1 W W �— <,�%EcoFasten Solar V QuikFoot_ Product Guide Exploded Product View, Bill of Materials - Materials Needed For Assembly 7 Item No. Description of Material/Part Quantity 1 QuikFoot Base Plate 1 6 2 Fastener(Length to be determined) 2 ^� 5 3 QuikFoot Flashing 1 4 EPDM Washer 1 0 5 L-102-3'Bracket'(other options available) 1 ' w 4 6 5/16'EPDM Bonded 18.8 55 Washer 1 v1 7 3/8"Stainless Steel Hex Nut 1 3 Required Tools w Z o — ^ f V • J 877-859-3907 EmFastm SdaPm content prd ed under mpyrigM.AN rigMs reserved.10419114 EWFa SWrp wz an amaxea"a wU5.PateMa8161,522828.15],700 B28.181.398 828166.713 828,148.299 B2 B,Mato B24245.451 B28.272174828.2E5.557 B2 QuikFoot- Product Guide Cut Sheets:QF-AL-Base 2X 0J.33in [8.38mm] r � E S: E V1 �-o N N N h W jl O d Q 1 .50in [38.10mm] 3/8"-16 Stud E E O ^ M a V n Q F-M : 1 .5' QF-L : 1.75'EEL--A ��- 977-0543947 EmFantm Sabra canleM pMetletl vMer capyrgMatlglMe meervetl.1U98t11 EmruYn Sdtrpoaman paeeaee b ere Movwq V.S.P�Mlb:9.15t.5II B39.1se.M0 Bz B,tetd9881 e.tBe.lt30?a,t48.x9902 e309.9H ez e.N5.4s4 B]e1]I t]4 BI e1t5.55)81 QuikFoot— Product Guide Cut Sheets: QFL-812 - R.38in [9.53mm] .032in [0.81mm] V1 CIO 12.00in [304.80mm] w 0 W3.00in [76.20mm] .SOin 8.00in [ 12.70mm] [203.20mm] 8]7-859-391] EWFMWM SdaFAlmnleMproletletl copJBpKAIrWbreaerwd.l0 16 32 6 E¢ .0 SWrpW em pmkCetl b,l Ua US,PaMN'.8.151.522B28.153,MB2U.18139892 8.IN 713 528.1"299826299.910B23245d54828272.174 B28.II5.557 B2 QuikFoot— Product Guide Cut Sheets: Bracket Options-SCL-101-3 3/8' — — A 16 SERRATIONS 1 7/8" R1/16" 1/4" ro 3/4,. 1/ib" 7 r 1 R.005 d R.010 2X R.OI 4 - 4 60.100°006 / 3/8"± 002 1/ 1/8„ 0 7/8" X 820 DETAELA SCALE 3:i 877-85&3947 EWFWWSd r-M oMeMprolatletiv cov^m.PlIrgM9re5en9tl.l0 14 3] Em mamn Sder pmGwz m pmb by em lu8a wU.S.Paa,ms:8.151,52]B28.153}53 B28,131,398028]51113 B2 S14SM B2 SM.914 82 8.245.454 B2 S. M.1]4 B28,225,552 82 QuikFoot- Product Guide Specifications PART 1 -GENERAL 1.1 SUMMARY 1.3 SUBMITTAL A WORK INCLUDES A Submit manufacturers written specifications. B. Base plate is 6000 series aluminum with one I. QuikFoot base plate attachment bracket that B. Submit standard product cut sheets PEM Type Press-In Stud 18.8 SS. attaches directly to the roof deck C. Submit installation instructions. C Fasteners to be compatible with chosen roof 2. Provide appropnate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values for the roof system. ultimate and allowable load values specific to as shown in load test data. B. RELATED SECTIONS the roof deck specified for the project. D. Counter flashing is.032gauge aluminum em- 1.Section 07600:Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500:Roofing 1.4 QUALITY ASSURANCE plate 3.Division 1:Administrative and Procedural Installer to be experienced In the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4.DMsion73hermai and Moisture Protection the area of the project. 1.2 SYSTEM DESCRIPTIONA Bracket is mill finish aluminum A COMPONENTS: 1.5 DELIVERY/STORAGE/HANDLING B. Base flashing-Black-kynar painted 1. QuikFoot system consists of aluminum Inspect material upon delivery.Norl"nufacturer bracket and base plate with(1)stainless steel within 24 hours of any missing or defective items PART 3-EXECUTION Stud,(1)stainless steel nut,(1)EPDM washer Keep material dry,covered,and o0 the ground until L and(1)bonded stainless steel and EPDM installed' 3.1 EXAMINATION \� washer. A Substrate:Inspect structure on which brackets 2. Fasteners PART 2-PRODUCTS are to be installed and verify that R will with- A.Tobe t. stand bracket.metal compatible with QuikFoot 2.1 MANUFACTURER any additional loading that may be incurred, II Tom, B.Fasteners should be selected for compa[- EcoFasten Solar• ibilrtywith the roof deck. 289 Harrel Street Morrisville,VT 05661 B. Notify General Contractor of any deficiencies O CFastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the www.ecofastensola¢om U system.See test data at C comet roofing material has been installed 2.2 MATERIALS correctly ly poor to installing solar attachment wwwecofastensolaccom A. Attachment Bracket brackets. 3. Sealant(if required by roof manufacturer): to be roof manufacturer approved. 6000 Series Aluminum(choose one) 3.2 INSTALLATION 4. Aluminum counter-flashing 1.CP-SQ-Slotted A Comply with architectural drawings and project 5. Aluminum attachment bracket 2.F-111-A engineers recommendations for location of 3.Pd.CSK system.Comply with Manufacturers written in- B. DESIGN REQUIREMENTS: 4.SCL-101-3 stallation instructions for installation and layout. 1. Bracket spacing to be recommended by 5.L-102-3' project engineer. 6.L-102.6' 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. It is important to design new structures or 8.Custom assess existing structures to make sure that they can withstand retained loads. 877-85"W E601'a6Yfn Solaro All Content protected oder rnpyrigM.A6 rights nesened.1WWI4 at EttFarlen Srly Padr3e�s ptYfld by for MOmiq U.S.PaYmb:8.151.5]3 112 9.153.?M 828.181.398 IN 8.166.713 828.146.399 32 8209914 B2 8 245 454 82 8 27}.174 B28 M5.557 B3 3/8" - A 46 SERRATIONS M �I h 1 7/8" Rl/16" 1/4" ao 3/4" � 1/16" � R.005 R.O10 2X R.01 4 4 60.`00/ 0 3/8"±.002 1/ 1/8" A = +/_ .1 0 7/8" X 82° DEFAIL SCALE A .XX = +/- .01 .XXX= +/- .005 289 Harrel Street i _ g?a Morrisville, VT 05661 SCL-101 -3 �._EcoFasten Solar Toll Free Phone 1.877. . 947 Q Toll Free Fax 1.888.788766.99994 rnArERuAr: 6000 SERIES ALUMINUM Q web www.ecofastensolar.com e-mail info@ecofastensolar.com SCALE: I:1 1/6/2012 SHEET 1 OF I Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT#9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this polity sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. 043 §§3 through §660 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy tf 9 Installation Crew Operating Policy Pioneer Valley Photovoltaics Cooperative POLICY DOCUMENT p9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy q 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared Installation: • All Material Handling tasks o Module prep and moving o Ladder lift setup o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not Including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Groundmountarray o Site work,earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall,hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wif options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List,ordering o Daily check-in o Customer interaction and training activities Mamachuseus Electric Company&Nantucket Electric Company(d/b/a National Grid) M.D.P.U. 1320 Certificate of Completion for Simplified Process Interconnections Installation Information: ❑Check if owner-installed Interconnecting Customer: ROBYN COADY Contact Person: Mailing Address: 17 STILSON AVE Cit, FLORENCE State: MA Zip Code 01062-1303 Telephone(Daytime):347-585-1176 (Evening): Facsimile Number: E-Mail Address:robyflcoady@91118il.C,OR1 Address of Facility (if different from above): Electrical Contractor's Name(if appropriate): PV Squared Mailing Address: 311 WELLS ST. SUITE B City: GREENFIELD State: MA Zip Code: 01301 Telephone(Daytime): 413-772-8788 (Evening): SAME Facsimile Number: 413-772-8668 E-Mail Address: Interconnection@pvsquared.coop License number: A13764 Date of approval to install Facility granted by National Grid: 3.21.2019 Application ID number: 00213989 p eCtiOn' The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County): Signed(Local Electrical Wiring Inspector,or attach signed electrical inspection): Name(printed): Date: License q: As a condition of interconnection you are required to send/e-mail a copy of this form along with a copy of the signed electrical permit to National Grid: National Grid Attn: Distributed Generation 40 Sylvan Rd Waltham, MA 02451 E-mail: distributed.eeneration(a),nationalerid.com Maasaehusem:hno'//www nationaleridus coni/maswlear c/honie/enerneff/distributed eenemlim.aso Nantucket:hna'//xww nationals dus com/nanmcket/home/encr eff/distributed eenemtion.aso Page I of I