Hyundai Building PlansProject
number
PLAN LIST
EXHIBIT 'D'
LOCUS PLAN
PROJECT CONTACTS
FURNITURE UPDATES
11/26/2013 3:23:09 PM11-26-13
TITLE SHEET
12009
PROPOSED HYUNDAI DEALERSHIP
347 KING STREET
347 KING STREET
NORTHAMPTON, MA 01060
PROPOSED HYUNDAI DEALERSHIP
Drawing List
Sheet
Number Sheet Name
Current
Revision
Date
T1 TITLE SHEET 11-26-13
--ARCHITECTURAL
A1.0 BUILDING CODE REVIEW 08-01-13
A1.1 FLOOR PLAN 10-08-13
A1.2 ENLARGED FLOOR PLAN- FRONT 10-24-13
A1.3 ENLARGED FLOOR PLAN- PARTIAL REAR 11-06-13
A1.4 FIXTURE PLAN (FOR REFERENCE ONLY)11-26-13
A1.5 ACCESSIBILITY STANDARDS 11-26-13
A1.6 DEALER SOLUTIONS PLAN 01-31-13
A1.7 PLAN DETAILS 06-11-13
A2.1 EXTERIOR ELEVATIONS 09-17-13
A2.2 INTERIOR ELEVATIONS 10-11-13
A3.1 BUILDING SECTIONS (1)08-20-13
A4.1 TYPICAL WALL TYPE DETAILS 08-20-13
A4.2 WALL SECTIONS 06-11-13
A4.3 WALL SECTIONS 06-11-13
A4.4 INTERIOR WALL SECTIONS & ELEVATIONS 11-06-13
A5.1 EXTERIOR SECTION DETAILS 06-11-13
A5.2 EXTERIOR SECTION DETAILS (2)06-11-13
A6.1 DOOR & WINDOW SCHEDULES 10-08-13
A7.1 ROOM FINISH SCHEDULE & DETAILS 10-22-13
A8.1 REFLECTED CEILING PLAN 11-15-13
A9.1 ROOF PLAN 08-29-13
SK-2 REAR ROOF EDGE PLAN DETAIL 08-29-13
SK-3 BASE FLASHING DETAIL 09-11-13
SK-4 SERVICE WRITE UP KEY CABINET 09-27-13
SK-5 SHOWROOM KEY CABINET 09-27-13
SK-6 CEILING CLOUD LOCAL 11-25-13
---STRUCTURAL
S1.1 FOUNDATION PLAN 05-01-13
S1.2 ENLARGED PARTIAL FOUNDATION PLAN 05-01-13
S1.3 ENLARGED PARTIAL FOUNDATION PLAN 05-01-13
S2.1 FOUNDATION DETAILS (1)04-16-13
S2.2 FOUNDATION DETAILS (2)05-01-13
S3.1 PIER DETAILS (1)05-01-13
S3.2 PIER DETAILS (2)06-11-13
----PLUMBING
P1.1 PLBG FLOOR PLAN, DETAILS & SCHEDULES 03-27-13
P1.2 PLBG FLOOR PLAN, DETAILS & SCHEDULES 03-27-13
P1.3 PLBG SPECIFICATIONS & DETAILS 03-27-13
-----FIRE PROTECTION
1of2 SPRINKLER PLAN 03-27-13
2of2 DETAILS 03-27-13
------HVAC
M-1 HVAC LAYOUT 07-12-13
M-2 SHOWROOM & OFFICE HVAC 07-12-13
M-3 PARTS/LOUNGE/SERV. DRIVE 07-12-13
M-4 SERVICE AREA HVAC 07-12-13
M-5 HVAC GAS PIPING/ROOF PLAN 07-12-13
M-6 CONTROLS & SCHEDULES 07-12-13
-------ELECTRICAL
E-1 POWER AND TEL/DATA PLAN 03-27-13
E-2 LIGHTING PLAN 03-27-13
E-3 FIRE ALARM PLAN 03-27-13
CITY OF NORTHAMPTON:
City Hall
210 Main Street
Northampton, MA 01060
Planning and Development - Wayne Feiden, FAICP, Hon.
WMAIA, Director of Planning and Development
ph: (413) 587-1265
Planning Board -
Carolyn Misch, Senior Land Use Planner &
Permits Manager
ph: (413) 587-1287
Building Commissioners Office -
Louis Hasbrouck- Building Commissioner
(Building, Gas, Electric, AAB enforcement)
ph: 413.587.1240
f: 413.587.1272
Fire Department
Chief Brian Duggan
ph: 413.587.1032
f: 413.587.1034
Department of Public Works
Edward S. Huntley, P.E., Director
ph: 413.587.1570
f: 413.587.1576
James Laurila, P.E., City Engineer
ph: (413) 587-1570
David Veleta – Sewer Department
ph: (413) 587-1570
Douglas McDonald – Stormwater Coordinator
ph: (413) 587 1582
David Sparks – Water Div. Superintendent
ph:(413) 587-1570
OWNER & APPLICANT:
Cosenzi Automotive Realty Limited Partnership
40 Russell Street
Hadley, MA 01035
Carla Cosenzi (413) 570-1302
Thomas Cosenzi (413) 774-3121
ENGINEER & GENERAL CONTRACTOR:
Kimberly M. Masiuk, P.E.
Associated Builders, Inc.
4 Industrial Drive
South Hadley, MA 01075
Ph. (413) 536-0021
Fax (413) 536-0908
FIRE PROTECTION:
Warehouse Mechanical
342 Britton Street
Chicopee, MA 01020
Paul Krause - ph. (413) 536-9222
ELECTRICAL:
Gustafson Electric Inc.
35 Glenn Drive
Wilbraham, MA 01095
David Gustafson - ph. (413) 537-4743
PLUMBING:
F. Paige Plumbing & Heating, Inc.
65 Orpheum Avenue
Spirngfield, MA 01118
Rich Paige - ph. (413) 218-2002
HVAC
Climate Heating & Cooling, Inc.
146 Hubbard Ave.
Pittsfield, MA 01201
Rick Laureyns - ph. (413) 684-5100
STRUCTURAL
Greenlaw, P.E.
183 Columbia Road
Hanover, MA 02339-2388
Ted Greenlaw - ph. (781) 826-8369
REF.U3 50AWILKINSZURNM DLN O.SER.M W W T: 140° F M W W P: 175 PSI A CO M PANYPA SO RO BLES C A ., U .S.A .REDU C ED PRESSU RE B A C KFLO W PREVEN TER
6" DI CL 52 FRO M CI TY SU PPLY
4
4
6
6
7
7
3
3
2
2
5
5
A A
B B
C C
DD
EE
FF
HH
J
K K
LL
II
G
1
1
S-1
B
S-2
GROUP B- BUSINESS- MAX TRAVEL 300'
GROUP S1- STORAGE (MOD. HAZARD)- MAX TRAVEL 250'
GROUP S2- STORAGE (LIGHT HAZARD)- MAX TRAVEL 400'
USE GROUP CLASSIFICATION (IBC- SECTION 302)
9,548 SF
7,070 SF
1,194 SF
AREA
TOTAL BUILDING AREA 17,812 SF
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A1.0BUILDING CODE REVIEWPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
1/16" = 1'-0"1 CODE REVIEW PLAN DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION08-01-13ISSUED FOR CONSTRUCTION REVISION
ANNREF.U3 5 0AW ILKINSZURNM DLN O.SER.M W W T: 140° F MW W P: 175 PSI A CO M PANYPA SO RO B LES C A., U .S.A .REDU C ED PRESSU RE B A C K FLO W PREVEN TER
6" DI CL 5 2 FR OM CI TY SUP PLY6" DI CL 5 2 FR OM CI TY SUP PLY
A2.14
A2.1
A2.1
A2.1
2
3
1
4
4
6
6 7
3
3
2
2
5
5
A A
B B
C C
DD
EE
FF
HH
J
K K
LL
II
G
TECH
CTR
11 X 12 HIGH SPEED
RYTEC DOOR
WINDOW
ALUM. SLIDING WINDOW
JAN
SINK
RETAIL
PARTS COUNTER
OUTSIDE OF FOUNDATION
89' - 4"31' - 0"PARTS RACKING
ABOVE VENDGATEWAY
ELEMENT 8' H CMU WALL TRENCH DRAIN
TRENCH DRAIN1' - 3 1/8"OUT TO OUT FOUNDATION138' - 0"OUTSIDE FOUNDATION169' - 0"16 x 16 BOX ELEMENT ABOVE
FIRE DEPT. SPRINKLER
CONNECTION
OUTSIDE FOUNDATION
109' - 0"
FACE FND.
19' - 8"
MEN'S
10
WOMEN'S
9
VESTIBULE
1
SHOWROOM
2
LOUNGE
8
RETAIL PARTS
16
SERVICE
WRITE-UP
15
SERVICE MGR
17LOCKER
18
PARTS
21
SPRINKLER
22
TANK RM
23
ELECT.
24
SERVICE
26
SERVICE
DRIVE
25
B6
C2
C2
C2
D2
C5 C4 C4
B1
B1
ABOVE STOREFRONTTO UNDERSIDE OF ROOF FACE OF GIRT TO OUTSIDE FND74' - 7 1/2"1
A3.1
1
A3.1
2
A3.1
3
A3.1
A1.2
1
A1.3
1
1
1
FIRE DEPT. KNOX BOX
W/ RED STROBE ABOVE
FIRE ALARM
ANNUNCIATOR
PANEL
GAS METER
ELECTRIC PANELS
4
A3.1
C5
ABV.
B6
B6
B6
B6
B6
C2
PARTS RACKING
ABOVE
1
A4.3
2
A4.3
3
A4.3
4
A4.3
WH
5
A4.3
2
A4.2
1
A4.2
3
A4.2
5
A4.2
4
A4.2
COFFEE
COUNTER
DF
HALL B
19
BUSINESS
OFFICE
13
INTERNET
6
OFFICE
5
HALL A
14
SALES MGR
4
F & I
3
OFFICE
11
OFFICE
12
F & I
7
CECO
ACM
CECO
EMERGENCY SHOWER
B6
ACM WRAP
CORNER
KEY DROP
BOX
C2
B4A
D2
4' H CMU WALLWINDOWS ABOVE. SEE ELEVATIONS.
TYPICAL AT REAR WALL
PROVIDE BLOCKING FOR
WALL MOUNTED VACUUM
BY EQUIPMENT PROVIDER
(7) 4"X3" DOWNSPOUTS,
SEE SITE PLAN
FACE OF FOUNDATIONACM EXTENDS2" BEYOND OUTSIDE14' - 9"15' - 3"23' - 0"22' - 1"19' - 5"17' - 8"8' - 2"10' - 10"6' - 10"12' - 9"18' - 3"32' - 0"12' - 0"1' - 4"
16' - 8"19' - 0"15' - 4"19' - 0"16' - 8"1' - 4"
FACE OF FOUNDATION
ACM EXTENDS
2" BEYOND OUTSIDE
FACE OF FOUNDATION
ACM EXTENDS
2" BEYOND OUTSIDE
1' - 4"16' - 8"19' - 0"15' - 4"19' - 0"16' - 8"19' - 8"1' - 4"14' - 9"15' - 3"23' - 0"22' - 1"19' - 5"25' - 10"10' - 10"19' - 7"18' - 3"OUT TO OUT OF FOUNDATION169' - 0"FACE OF FOUNDATIONACM EXTENDS2" BEYOND OUTSIDE2' - 0"12' - 0"20' - 1 1/8"3' - 6"25' - 6"1' - 9"68' - 7"2' - 0"5' - 7"3' - 0"8 1/8"C3
42" COMPUTER COUNTER/ BAR
HOSE REEL ABOVE
WALK OFF
MAT
WALK OFF
MAT
WALK OFF
MAT
WALK OFF MAT
SALES COUNTER
X04X05X06X07X08X09
A4.4
10
32
D
E
F
3
A3.1
COMPRESSOR
29
TEL/ DATA
28
PARTS
RACKING
27
1
4
A3.1
LADDER TO ROOF HATCH
CLEAR SPACE
TEL/ DATA RACKING
COMPRESSOR CONDENSATE HOSE TO
FOLLOW WALL, THROUGH FLOOR IN TEL
DATA TO SINK BELOW (BY DEALER
SOLUTIONS)
BLOWER
EXHAUST
PIPING
RACKING SYSTEM BY OTHERS W/ STAIRS
B4
B4
C2
28
FLOOR JOIST FRAMING
FLOOR JOIST FRAMING
EXHAUST TO ROOF BY
EQUIPMENT PROVIDER
29
B4A
A1
B4A
B4A
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A1.1FLOOR PLANPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
3/32" = 1'-0"1 FLOOR PLAN
3/32" = 1'-0"2 TEL/DATA/COMPRESSOR DATEDESCRIPTION01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION07-19-13ISSUED FOR CONSTRUCTION REVISION08-01-13ISSUED FOR CONSTRUCTION REVISION08-20-13ISSUED FOR CONSTRUCTION REVISION10-08-13ISSUED FOR CONSTRUCTION REVISION
REF.A2.1
1
4 6 7325
A2.2
4
1
FF
H
J
K
L
I
G
1
A3.1
2
A3.1
SOLID SURFACE
COFFEE COUNTER W/
CABINETS BELOW
GATEWAY ELEMENT TRENCH DRAIN16 x 16 SIGN PANELS ABOVE
GLASS VESTIBULEw/ GLASS
CEILING, SEE RCP
WALK OFF
MAT
MEN'S
10
WOMEN'S
9
VESTIBULE
1
SHOWROOM
2
LOUNGE
8
RETAIL PARTS
16
SERVICE
WRITE-UP
15PARTS
21
SERVICE
DRIVE
25
2"18' - 3"12' - 9"17' - 8"8' - 2"17' - 8"FACE FND1' - 7 3/4"9' - 4" R.O2' - 8"15' - 0" R.O.2' - 4 1/4"2' - 3 1/2"15' - 0" R.O.2' - 4"15' - 0" R.O.4' - 4 1/2"11' - 4" R.O.4' - 4 1/2"15' - 0" R.O.2' - 4"15' - 0" R.O.2' - 3 1/2"
9
10
1
25B
21A
13a
12
25A
67
15
11
1A
21C
A4
A4A4
A4 A4
A4
A4
VIF
1' - 6 7/8" FACE FND. CL STUD
4 1/2" CL TO FACE STUD
9' - 0 7/8" FIN. OPENING 8 7/8"
1/8"
8' - 6 5/8"
9"3 7/8"
9' - 2 1/4"7 1/4"4' - 0"3' - 4"
2 1/2"
16' - 2"
2 1/2"3 7/8"
8' - 11 5/8"1' - 2 1/2"5' - 4"11 1/2"15' - 8"5 1/2"
1
A2
A2
A2
B6
A1
B6
B6
A1
B4
A1 A2
A2
B3
A2
A1
B1
A4
B6
A4 A4
A4
A4
A4
A4
B1
A4 A4
A4
A4
A4
A4
A4 A4
A2
A4
B6
B6
B4 B5B6
2
FND. WALL
2" TO 5"3' - 4" R.O.2' - 1"11' - 0" R.O.
FACE FND.
2' - 8"
BLOCKING FOR TV
B3
5' - 6 1/8"8' - 11 1/8"4' - 10 7/8"DATUM11' - 7 1/2"2' - 4 1/4"15' - 0" R.O.2' - 8"15' - 0" R.O.7' - 3"5' - 0"3' - 11 1/4"5' - 0" R.O.4' - 0"5' - 0" R.O.4' - 10 1/2"3' - 0"1' - 5"1
A4.3
2
A4.3
3
A4.3
5' - 3 1/2"3' - 1"5' - 3 1/2"1' - 3"3' - 0"
11 5/8"
CLEAR
5' - 0"MIN.3' - 6"MIN. CLR2' - 8"DATUM LINE11' - 7 1/2"5' - 6 1/4"6' - 5 1/8"7' - 8 3/4"11' - 0 1/4"2' - 4 1/4"MIN.2' - 8"MIN.1' - 0"MIN.
2'-8" CLR.
12" MIN.
A4.43
2' - 7 1/4"11' - 2 3/4"2' - 7 1/4"
WRAP COLUMN, VERIFY WITH
SIZE AND LOCATION IN FIELD,
TYPICAL.
3
B1
B3
B2
C2
FACE OF STUD
5' - 9 5/8"
A2
5
A4.3
2
A4.2
1
A4.23
A4.25
A4.2
4
A4.2
A1.7
1
A1.7
2 A1.7
1
A1.7
6
A1.7
3
A1.7
4
A1.7
10
ALIGN SOFFIT ABOVE WITH FURROUT,
FURROUT AS REQUIRED TO CONCEAL COLUMN
ALIGN SOFFIT ABOVE
WITH FURROUT, TO
CONCEAL COLUMN.
A1.7
7
DATUM LINEDATUM LINE5 5/8"FACE OF STUDFACE OF STUD
SOFFIT
ABOVE
SOFFIT ABOVE SOFFIT ABOVE
SOFFIT ABOVE
SOFFIT ABOVE
SOFFIT ABOVE
SOFFIT ABOVE
SOFFIT
ABOVE
SOFFIT
ABV.
A2.2
5
SOFFIT,
GWB TO
WRAP
OPENING
12" MIN.A4
A4
A2
A1
WATER BUBBLER,
PROVIDE POWER
& WATER
HALL A
14
F & I
7
INTERNET
6
OFFICE
5
SALES MGR
4
F & I
3
OFFICE
11
OFFICE
12
BUSINESS
OFFICE
13
ALIGN SOFFIT ABOVE WITH FURROUT, FURROUT
AS REQUIRED TO CONCEAL COLUMN
SOFFIT ABOVE
SHELF W/ CABINETS
ABOVE & BELOW
A4
5
19A
21D
3
2B
2C
CLEAR DUEL SWING DOOR
(SHOWROOM VEHICLE ENTRY)
PROVIDE POWER & DATA LINES TO EACH
SALES DESK LOCATION W/ FLOOR BOX.
COORDINATE LOCATION W/ OWNER
EQUIPMENT
PROVIDE POWER & DATA LINES TO EACH
SALES DESK LOCATION W/ FLOOR BOX.
COORDINATE LOCATION W/ OWNER
EQUIPMENT
RECESSED
KEY CABINET
RECESSED KEY
CABINET,
COORDINATE
LOCTION
A2
A1
A1
A2
MIN.7' - 0" CLR.GWB SOFFIT
A1.7
5
B6
POWER & DATA
FOR FIXTURE
POWER & DATA
FOR FIXTURE
RYTEC DOOR
CONTROL PANEL
THIS WALL
WALK OFF
MAT
WALK OFF
MAT
ACM END
SOFFIT ABV.
CHANGING
TABLE
POWER/ DATA4' - 8 1/2"RETAIL PARTS
COUNTER
WALK OFF MAT
VERTICAL LIFT
DOOR.
COORDINATE
42" HIGH COMPUTER
COUNTER/BAR. SEE SPEC
SALES PERSONNEL
COUNTER
1' - 9 1/4"
7
A4.4
1' - 3 1/8"X03
X02
X01
X11
ELECTRICAL CONNECTION TO ELEMENT
SOFFIT ABOVE
1' - 6"
1' - 6"1' - 6 1/2"
1' - 6 1/2"
1' - 3 1/2"2' - 6"
1' - 6"
2A
A4.4 8
A2
A2
A3
A2
A1
A4.4
10
8"6"
13c
13b
28" DEEP MILLWORK COUNTER
24" DEEP MILLWORK COUNTER
28" DEEP MILLWORKCOUNTER6' - 6 3/8"3' - 0"13' - 2"
3' - 0"4' - 6"
X5 A4.4 11
BLOCKING FOR TV
POWER/ DATA
BLOCKING FOR TV
POWER/ DATA
3' - 0"SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A1.2ENLARGED FLOOR PLAN- FRONTPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009 1/4" = 1'-0"1 ENLARGED FLOOR PLAN- FRONT DATEDESCRIPTION02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON07-19-13ISSUED FOR CONSTRUCTION REVISION08-01-13ISSUED FOR CONSTRUCTION REVISION08-20-13ISSUED FOR CONSTRUCTION REVISION10-08-13ISSUED FOR CONSTRUCTION REVISION10-24-13TV WALL ELEVATION, BUSINESS OFFICE
REF.U350AWILKINSZ U RNM DLN O .S ER.M W W T: 140 ° F M W W P: 175 PSI
A CO M PANYPA SO RO B LES C A ., U .S.A .R EDU C ED PRESSU RE B A C K FLO W PR EVEN TER
6" DI CL 52 FROM CITY SUPPLY
4 6 7325
C
D
E
F
G
1
A3.1
2
A3.1
3
A3.1
SPRINKLER
22
PARTS
21
RETAIL PARTS
16
LOCKER
18
SERVICE
WRITE-UP
15
SERVICE MGR
17
TANK RM
23
SERVICE
26
1
4
A3.1 8' - 8"4 1/4"3' - 10 1/4"5' - 1 1/2"
3 1/4"
18' - 8 3/4"1' - 9 5/8"3' - 6"9' - 2 3/4"
9 5/8"
12' - 8 3/8"5' - 0"1' - 3 3/4"6' - 8"3' - 4"6' - 0"8"
1' - 0 5/8"
18' - 7 3/8"1' - 4"M.O.3' - 4"1' - 3"2' - 2"8' - 0"5' - 7"3' - 0"8 1/8"5' - 0"6' - 0"11' - 1"9' - 0 1/8"FACE GIRT1' - 9 3/4"9' - 2 3/4"4 1/2"18' - 0 1/4"4 1/2"7' - 0"4' - 0 1/2"3/8"5' - 10 5/8"3' - 4"4' - 1 5/8"11' - 7 3/4"
NOTES:
REFERENCE EQUIPMENT PLAN AND STRUCTURAL PLAN FOR
EQUIPMENT LOCATIONS.
REAR SECTION OF BUILDING BETWEEN COLUMN LINES A & C
ARE NOT SHOWN. REFERENCE A1.1.
F.D CONNECTION
GAS METER
F.D. KNOX BOX
W/ RED LIGHT
STROBE ABOVE
ANNUNCIATOR
PANEL/ FACP
8 3/4"GWB WRAP35' - 0" FIN. OPENINGA2.2
C5
B3
B4 B5
A2
A1
B5
A1A1A1
C4
D1
B2
C5C4
B2
D2
D2
A2
B2
B4
B4
C2
C2
C3
C3
A4
A4
B2
CABINETS &
COUNTER
VEND.48" LOW WALL,
SLOPED CONC. CAP.
PAINT PER SPEC.
TO 8'-0", STUD FRAME
ABOVE. PAINT PER
SPEC.
TO 8'-0"
TO 7'-4", GIRT ABOVE.
PAINT PER SPEC.
JOIST FRAMING
ABOVE.FACE GIRT FACE CMU21' - 3"14' - 8"
ELECT.
24
SERVICE
DRIVE
25
DATUM LINE,
FACE OF STUD
SEE A1.2
7 1/2"
1' - 3 1/2"
5' - 0"
A4.435 1/2"3' - 9 1/4"10' - 7 7/8"9' - 3 1/8"5' - 10 3/4"ABOVE
PAINT STEEL FRAME,
CECO PANEL ABOVE
4.5" w/ 2" VERTICALBOTH SIDES4.5" w/ 2" VERTICALBOTH SIDESPARTS RACKING ABOVE
BY OTHER
PARTS RACKING ABOVE BY OTHER
BOLLARD, TYP OF 4 EACH DOOR BOLLARD, TYP OF 4 EACH DOOR
ELECTRIC
PANEL
2' - 9"3' - 1"3' - 1"CLEAR30" MIN.WATER HEATER
JANITOR SINK, PROVIDE HOT AND
COLD SPIGOT AT 20" AFF
SPRINKLER MAIN
PIPING
COORDINATE CONDENSATE
LINE FROM ABOVE INTO
SINK
BLOWER VENT PIPE BY D.S. TO
UNDERGROUND EXHAUST, TO
COMPRESSOR ROOM ABV.
COORDINATE EMERGENCY SHOWER
& EYEWASH PER CODE
26C
26A
26D
26B
20A
21A
17A
15
19A
22B
18
21B
24
23
22A
21C
21D
A2.2
5
B3
48" LOW WALL,
SLOPED CONC. CAP.
PAINT PER SPEC.
SOFFIT ABV.
X10
TECH DESK
W SS TOP
4
A4.4
A1.7
9
A1.7
8
3' - 0"
HALL B
19
FRP (3 WALLS)
FRP
FRP PANEL
6
B3
RYTEC CONTROL
PANEL THIS SIDE
RYTEC CONTROL
PANEL THIS SIDE
MAIN CONTROL PANEL
FOR ALL EQUIPMENT,
LIGHTING, FIXTURES
ETC. TO THIS POINT
X12
A4
WALL TO SUPPORT FLOOR JOISTS ABOVE,
TO UNDERSIDE OF JOISTS. CECO PANEL
ABOVE IN COMPRESSOR RM. MODIFY AS
REQUIRED TO SUPPORT FLOOR FRAMING.
JOIST DIRECTION ABOVE
JOIST DIRECTION ABOVE
JOIST DIRECTION ABOVE
B4A
WATER FOR
COFFEE MAKER
RECESS KEY CABINET,
COORDINATE WITH
FRAMING
FILING CABINETS BY
OWNER. OUTLETS
ABOVE. COORDINATE
VERTICAL
LIFT DOOR.
ANGLE LINTLE ABOVE DOOR.1' - 6"5' - 8"10' - 0"12' - 0"2' - 0"1' - 4"3' - 4"5
A3.1
6
A3.1
1' - 8 1/8"5 1/2"5' - 0"
A4.4 6
5
PROVIDE
WATER AND
POWER1' - 2"2' - 3 5/8"3' - 4"2' - 0"12' - 0"3' - 4 1/2"COORDINATE INSTALL OF METAL
PANELS ABOVE WITH COMPRESSOR.
FULL HEIGHT FULL HEIGHT FULL HEIGHT
1' - 10 5/8"3' - 1"2' - 8 5/8"1' - 6 7/8"3' - 11"7' - 8 3/4"2' - 3 1/2"7 5/8"17' - 4"SHUTTER DOOR
6' - 0" F.O.1' - 5 1/8"
A4.4 12
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A1.3ENLARGED FLOOR PLAN- PARTIAL REARPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RAF
12009
1/4" = 1'-0"1 ENLARGED FLOOR PLAN- REAR DATEDESCRIPTION03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON07-19-13ISSUED FOR CONSTRUCTION REVISION08-01-13ISSUED FOR CONSTRUCTION REVISION08-20-13ISSUED FOR CONSTRUCTION REVISION09-11-13ISSUED FOR CONSTRUCTION REVISION10-08-13ISSUED FOR CONSTRUCTION REVISION11-06-13MILLWORK CLARIFICATIONS
5' TOOL STORAGE6' WORK BENCH TOPSL210i-FAWAWOAAAA
VAC
2
60" workbench/
Overhead cabinet
FLR SCRA/CT/JPRESS
F/JENGINE STANDPOWER PUSHERBALANCERWHEELEXISTINGLATHE
BRAKE
SL210i-FA
SL210i-FASL210i-FA SL210i-FASL210i-FA
5' TOOL STORAGE
6' WORK BENCH TOP
12' WORK BENCH TOP5' TOOL STORAGE5' TOOL STORAGE12' WORK BENCH TOP5' TOOL STORAGE5' TOOL STORAGESL210i-FASL210i-FASL210i-FAA60" workbench/
Overhead cabinet
60" workbench/
Overhead cabinet A
AA
12' WORK BENCH TOP
5' TOOL STORAGE 5' TOOL STORAGE
12' WORK BENCH TOP
5' TOOL STORAGE 5' TOOL STORAGE
TS6864 TS6864 TS6864 TS6864 TS6864
TS6864TS6864TS6864TS6864TS6864A VAC
2
W/AF750GALDW WASTEOIL500/250GALDWOIL 1 / OIL2EXISTINGFLAMMABLESTORAGE CABINET
Rotary SL212IELECELECELEC
HARVEYINDUSTRIESAKRON OHIO HARVEYINDUSTRIESAKRON OHIO HARVEYINDUSTRIESAKRON OHIOHARVEYINDUSTRIESAKRON OHIO HARVEYINDUSTRIESAKRON OHIOHARVEYINDUSTRIESAKRON OHIO
HARVEYINDUSTRIESAKRON OHIOHARVEYINDUSTRIESAKRON OHIOHARVEYINDUSTRIESAKRON OHIOHARVEYINDUSTRIESAKRON OHIO
HARVEYINDUSTRIESAKRON OHIOHARVEYINDUSTRIESAKRON OHIO HARVEYINDUSTRIESAKRON OHIO
LPLPLP
LP
LPLP
LP LP LP LP
TM
TM
TM
PW VS EC VS EC
WB TC
AM
PWPW
EC
120363LPR
4836BR 36185S8HD36185S8HD96183LTR
48245S8HD48245S8HD
48187SC
48187SC 48187SC
48187SO 48187SO 48187SO
48187SO 48187SO 48187SO
48247SO
48247SO 48247SO 48247SO48247SO48247SO
48187SO
48187SO
48247SC
48187SC
60183LTR
36247SO36247SO36247SO
48187SC48187SC48187SC
FUTURE HD EXPANSION
HD DRAWER UNITS
SPECIAL TOOL STORAGE
HD DRAWERUNITSHD DRAWERUNITSSpecial Tools Cabinet
8" Pipe
8"Pipe
12"Pipe
FUTUREFUTUREFUTUREFUTUREFUTURE
FUTUREFUTUREFUTUREFUTUREFUTUREW/W
AIR
OIL
OIL2
WWF
AIROILOIL2WWFAIR
AIR
OIL
OIL2
WWF
AIR
AIR
OIL
OIL2
WWF
AIRAIROILOIL2WWFAIRAIROILOIL2WWF55
Gal
Drum
55
Gal
Drum
55
Gal
Drum
MAGNA-MOUNT4-PANELMEN
WOMENSERVICEDRIVE DISPLAY
POSTERPOSTERPOSTERPOSTER POSTERPOSTERML50/24
ML50/42ML50/30
ML50/2465/3665/36
65/3665/3665/36 P65/36 P65/36
65/3665/36 P
5D5D5D5D5D5D5D5D5D5D5D5D5D5D5D5D5D5D5D24/42/2M30/72/2M BBF/24FF/2430/48/2MBBF/24
3W50
EC50EC50EC5030/60/2M30/60/2M
ML50/24
ML50/42ML50/30
ML50/243W50
EC50EC50EC5030/60
/
2
M30/60/2M
ML50/24
ML50/42ML50/30
ML50/243W50
EC50EC50EC5030/60/2M30/60/2M
ML50/24
ML50/42ML50/30ML50/243W50
EC50EC50EC5030/60/2M30/60/2MML50/24
ML50/42ML50/30ML50/243W50
EC50EC50EC5030/60/2M30/60/2MML50/24
ML50/42ML50/243W50
EC50EC5030/60/2M30/60/2M24/66/2M30/66/2MFF/24BBF/2424/42/2M
30/66/2MFF/24
BBF/2424/42/2M
30/66/2MBBF/24FF/2424/42/2M30/66/2M BBF/24FF/24
3D/3624/42/2M
30/66/2MBBF/24FF/242D/363D/425D5D EP/30
30/48/2MBBF/24EP/30
30/48/2MBBF/24
EP/30 60x3030/48/2MBBF/24EP/30 30/48/2MBBF/24EP/304D4D4D4D3D/3624/42/2M30/66/2MBBF/24FF/243D/36
ML50/24
ML50/42ML50/30ML50/243W50
EC50EC5030/60/2M30/60/2MML50/24
ML50/42ML50/30ML50/243W50
EC50EC50EC5030/60/2M30/60/2MFF/24FF/243D/423D/423D/422D/362D/36
24/60/2MBBF/24
30/78/2M30/78/2MBBF/24BBF/24FF/2424/36/2M
DIVS-LATJ3D36AIS1
DIVS-LATJ3D36AIS1
G NCDSK7236D1
G NCDSK7236D1
G NCDSK7236D1
G NCDSK7236D1
G NCWS6030P21
G NCTBL2424291
G NCTBL2424291
G NCNCI1
M WLW-WS2466AIS1M WLW-WS3066AIS1
M WLW-WS2442AIS1
M WLW-WS3066AIS1
SAFEM WLS-SHFHSAM 36AIS1
M WLS-SHFHSAM 36AIS1
M WLS-SHFHSAM 36AIS1
M WLS-SHFHSAM 36AIS1 M WLS-SHFHSAM 36AIS1
M WLS-SHFHSAM 36AIS1
M WLS-SHFHSAM 36AIS1M WLS-SHFHSAM 36AIS1
M WLS-SHFHSAM 36AIS1
M WLS-PEDFFJ24AIS1
M WLS-PEDBBFJ24AIS1
M WLS-PEDFFJ24AIS1
M WLS-PEDBBFJ24AIS1
M WLS-PEDBBFJ24AIS1
M TXE-M XEK30___1LAIS1
M TXE-M XEK42___1LAIS1
M TXE-M X8W4FDO 1AIS1 M TXE-M X8W4FDO 1AIS1
M TXE-M X8W4FDO 1AIS1M TXE-M X8W4FDO 1AIS1M TXE-UN8W4BIFLAIS1
M TXE-M X8W4PTPC18AIS1
M TXE-M XEK30___1LAIS1
M TXE-M XEK42___1LAIS1
M TXE-M X8W4FDO 1AIS1M TXE-M X8W4FDO 1AIS1
M TXE-M X8W4FDO 1AIS1M TXE-M X8W4FDO 1AIS1M TXE-UN8W4BIFLAIS1
M TXE-M X8W4PTPC18AIS1
M TXE-M XEK30___1LAIS1
M TXE-M XEK42___1LAIS1
M TXE-M X8W4FDO 1AIS1 M TXE-M X8W4FDO 1AIS1
M TXE-M X8W4FDO 1AIS1M TXE-M X8W4FDO 1AIS1M TXE-UN8W4BIFLAIS1
M TXE-M X8W4PTPC18AIS1
M TXE-M XEK30___1LAIS1
M TXE-M XEK42___1LAIS1M TXE-M X8W4FDO 1AIS1 M TXE-M X8W4FDO 1AIS1
M TXE-M X8W4FDO 1AIS1M TXE-M X8W4FDO 1AIS1
M TXE-UN8W4BIFLAIS1
M TXE-M X8W4PTPC18AIS1
M TXE-M XEK30___1LAIS1
M TXE-M XEK42___1LAIS1M TXE-M X8W4FDO 1AIS1 M TXE-M X8W4FDO 1AIS1
M TXE-M X8W4FDO 1AIS1M TXE-M X8W4FDO 1AIS1
M TXE-UN8W4BIFLAIS1
M TXE-M X8W4PTPC18AIS1
M TXE-M XEK30___1LAIS1
M TXE-M XEK42___1LAIS1
M TXE-M X8W4FDO 1AIS1 M TXE-M X8W4FDO 1AIS1
M TXE-M X8W4FDO 1AIS1M TXE-UN8W4BIFLAIS1
M TXE-M X8W4PTPC18AIS1
M TXE-M XEK30___1LAIS1
M TXE-M XEK42___1LAIS1M TXE-M X8W4FDO 1AIS1 M TXE-M X8W4FDO 1AIS1
M TXE-M X8W4FDO 1AIS1M TXE-M X8W4FDO 1AIS1
M TXE-UN8W4BIFLAIS1
M TXE-M X8W4PTPC18AIS1
M TXE-M XEK30___1LAIS1
M TXE-M XEK42___1LAIS1M TXE-M X8W4FDO 1AIS1
M TXE-M X8W4FDO 1AIS1
M TXE-M X8W4FDO 1AIS1M TXE-M X8W4FDO 1AIS1M TXE-UN8W4BIFLAIS1
M TXE-M X8W4PTPC18AIS1
M TXP-M L3C50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M L3C50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M L3C50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M L3C50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M L3C50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M L3C50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M L3C50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1M TXP-M L3C50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M TXP-M LEC50AIS1
M WLW-WS3048AIS1
M TXWPS-SSSALAIS1
M TXWPS-SSSALAIS1M TXWPS-SSSARAIS1
M TXWPS-SSSARAIS1
M TXW-WSD3060AIS1
M TXW-WSD3060AIS1 M TXWPS-SSSALAIS1
M TXWPS-SSSALAIS1M TXWPS-SSSARAIS1
M TXWPS-SSSARAIS1
M TXW-WSD3060AIS1
M TXW-WSD3060AIS1 M TXWPS-SSSALAIS1
M TXWPS-SSSALAIS1M TXWPS-SSSARAIS1
M TXWPS-SSSARAIS1
M TXW-WSD3060AIS1
M TXW-WSD3060AIS1
M TXWPS-SSSALAIS1
M TXWPS-SSSALAIS1M TXWPS-SSSARAIS1
M TXWPS-SSSARAIS1
M TXW-WSD3060AIS1
M TXW-WSD3060AIS1M TXWPS-SSSALAIS1
M TXWPS-SSSALAIS1M TXWPS-SSSARAIS1
M TXWPS-SSSARAIS1
M TXW-WSD3060AIS1
M TXW-WSD3060AIS1
M TXWPS-SSSALAIS1 M TXWPS-SSSARAIS1
M TXW-WSD3060AIS1
M TXW-WSD3060AIS1
M WLW-WS3066AIS1M WLW-WS3066AIS1 M WLW-WS3066AIS1
M WLWFS-EPSA30AIS1
M WLW-WS3048AIS1
M WLWFS-EPSA30AIS1
M WLW-WS3048AIS1
M WLWFS-EPSA30AIS1
M WLW-WS3048AIS1
M WLWFS-EPSA30AIS1
M WLW-WS3048AIS1
M WLWFS-EPSA30AIS1
M WLW-WS3066AIS1
M TXWPS-SSSALAIS1
M TXWPS-SSSALAIS1M TXWPS-SSSARAIS1
M TXWPS-SSSARAIS1
M TXW-WSD3060AIS1
M TXW-WSD3060AIS1M TXWPS-SSSALAIS1
M TXWPS-SSSALAIS1M TXWPS-SSSARAIS1
M TXWPS-SSSARAIS1
M TXW-WSD3060AIS1
M TXW-WSD3060AIS1
M WLW-WS3078AIS1M WLW-WS3078AIS1
DIVS-PEDFFJ24AIS1
DIVS-PEDFFJ24AIS1
DIVS-PEDFFJ24AIS1
M WLS-LATJ3D36AIS1 DIVS-PEDFFJ24AIS1
M WLS-LATJ3D42AIS1
DIVS-PEDFFJ24AIS1
M WLS-PEDFFJ24AIS1
M WLS-PEDFFJ24AIS1
M WLS-LATJ3D42AIS1
M WLS-LATJ3D42AIS1
M WLS-LATJ3D42AIS1
M WLS-LATJ2D36AIS1M WLS-LATJ2D36AIS1
M WLS-PEDBBFJ24AIS1 M WLS-PEDBBFJ24AIS1M WLS-PEDFFJ24AIS1
M WLS-PEDFFJ24AIS1
DIVW-WS2442AIS1DIVW-WS3072AIS1 DIVS-PEDBBFJ24AIS1
DIVS-PEDBBFJ24AIS1
M TXW F S- A LW 2 71 2 M X LAIS1 M TXW F S- A LW 2 71 2 M X RAIS1 M TXW F S- A LW 2 71 2 M X LAIS1 M TXW F S- A LW 2 71 2 M X RAIS1 M TXW F S- A LW 2 71 2 M X LAIS1 M TXW F S- A LW 2 71 2 M X RAIS1
M TXW F S- A LW 2 71 2 M X LAIS1 M TXW F S- A LW 2 71 2 M X RAIS1M TXW F S- A LW 2 71 2 M X LAIS1 M TXW F S- A LW 2 71 2 M X RAIS1
M TXW F S- A LW 2 71 2 M X LAIS1 M TXW F S- A LW 2 71 2 M X RAIS1
DIVW-WS2442AIS1
DIVS-PEDBBFJ24AIS1DIVW-WS2442AIS1 DIVS-PEDBBFJ24AIS1
DIVW-WS2442AIS1
DIVS-PEDBBFJ24AIS1
M WLS-LATJJ2D36AIS1
DIVS-PEDBBFJ24AIS1
DIVS-PEDBBFJ24AIS1 DIVS-PEDBBFJ24AIS1
DIVS-PEDBBFJ24AIS1
DIVW-WS2442AIS1
DIVS-PEDBBFJ24AIS1
M TXW F S- A LW 2 71 2 M X LAIS1 M TXW F S- A LW 2 71 2 M X RAIS1M TXW F S- A LW 2 71 2 M X LAIS1 M TXW F S- A LW 2 71 2 M X RAIS1
1
2
3
4
5
6
7
8
9
COPIERG NCFILE51
G NCFILE51
G NCFILE41
G NCFILE41
G NCFILE41
G NCFILE4136" x 72"VW SHOWROOM36" x 72"NISSAN GAYLE36" x 72"HYUNDAI MIKE36" x 72"HYUNDAI STAN30" x 60"HYUNDAI ALEX30" x 48"VW OWNER30" x 48"VW OWNER30" x 48"VW BUSINESS30" x 48"VW SHOWROOMM WLP-SAFR6536AIS1
M WLP-SAFR6536AIS1
M WLP-SAFR6536AIS1
M WLP-SAFR6536AIS1
M WLP-SAFP4136AIS1
M WLP-SAFP6536AIS1
M WLP-SAFP4136AIS1
M WLP-SAFP6536AIS1
M WLP-SAFP6536AIS1
M WLP-SAFP6536AIS1
M WLP-SAFP6536AIS1
M WLP-SAFP6536AIS1
M WLP-SAFP6536AIS1
M WLP-SAFP6536AIS1M WLP-SAFR6536AIS1
M WLP-SAFR6536AIS1
M WLP-SAFR6536AIS1
M WLP-SAFR6536AIS1
1 2 3
4 5
67 FUTURE
8 FUTURE
EXISTING
DESK
30X 48 30 X 48 30X 48 30 X 48 30X 48 30 X 48
30X 48 30 X 4830X 48 30 X 48
30X 48 30 X 48
30X 48 30 X 4830X 48 30 X 48
1 2
3
C O U N T E R B Y B R O A D W A Y
24" x 96"
G NCCHRARM1G NCCHRARM1 G NCCHRARM1 G NCCHRARM1
G NCCHRARM1 G NCCHRARM1
G NCCHRARM1G NCCHRARM1 G NCCHRARM1 G NCCHRARM1
G NCCHRARM1 G NCCHRARM1
G NCCHRARM1G NCCHRARM1 G NCCHRARM1 G NCCHRARM1
G NCCHRARM1 G NCCHRARM1
G NCCHRARM1G NCCHRARM1 G NCCHRARM1 G NCCHRARM1
G NCCHRARM1 G NCCHRARM1
G NCCHRARM1G NCCHRARM1 G NCCHRARM1 G NCCHRARM1
G NCCHRARM1
G NCCHRARM1
G NCCHRARM1
G NCCHRARM1
G NCCHRARM1
G NCCHRARM1
G NCCHR1G NCCHR1G NCCHR1G NCCHR1G NCCHR1
G NCCHREXEC1
G NCCHREXEC1
G NCCHREXEC1
G NCCHREXEC1
G NCCHREXEC1
G NCCHREXEC1
G NCCHREXEC1
G NCCHREXEC1
G NCCHREXEC1
G NCCHRARM1G NCCHRARM1 G NCCHRARM1 G NCCHRARM1
G NCCHRARM1 G NCCHRARM1
G NCCHRARM1G NCCHRARM1 G NCCHRARM1 G NCCHRARM1
G NCCHRARM1 G NCCHRARM1
G NCCHRARM1 G NCCHRARM1
G NCCHRARM1
G NCCHR1
G NCCHR30301
G NCCHR30301
G NCCHR30301
G NCCHR30301G NCCHR30301G NCCHR30301G NCCHR30301
G NCCHR30301 G NCCHR30301G NCCHR30301G NCCHR30301G NCCHR30301
M TXP-M LFR5024AIS1 M TXP-M LFR5042AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5024AIS1 M TXP-M LFR5024AIS1 M TXP-M LFR5042AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5024AIS1 M TXP-M LFR5024AIS1 M TXP-M LFR5042AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5024AIS1
M TXP-M LFR5024AIS1 M TXP-M LFR5042AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5024AIS1M TXP-M LFR5024AIS1 M TXP-M LFR5042AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5024AIS1
M TXP-M LFR5024AIS1 M TXP-M LFR5042AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5024AIS1
M TXP-M LFR5024AIS1 M TXP-M LFR5042AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5024AIS1M TXP-M LFR5024AIS1 M TXP-M LFR5042AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5030AIS1
M TXP-M LFR5024AIS1
F & I
3
PLEDGE \P P LA QUEANN REF.U3 5 0AW ILK INSZ URNM DLN O.SER.M W W T: 140° F MW W P: 175 PSI A CO M PANYPA SO RO B LES C A ., U.S.A .REDU C ED PRESSU RE B A C K FLOW PREVEN TER
6" DI CL 52 FROM CITY SUPPLY
6" DI CL 52 FROM CITY SUPPLY CVD969BCR50 DRYERAC
AC
AS
EB
AD
48722L HORSE SHOE WRAPW/SIDE DIVIDERSFLOOR AS 3RD LEVEL48722L HORSE SHOE WRAPW/SIDE DIVIDERSFLOOR AS 3RD LEVEL48722L HORSE SHOE WRAPW/SIDE DIVIDERSFLOOR AS 3RD LEVEL48722L HORSE SHOE WRAPW/SIDE DIVIDERSFLOOR AS 3RD LEVEL96183LTR
96183LTR
96183LTR
HOODS / INSERTS / BUMPER
ACCESSORIES
BD-11 BLOWER
7 8
12345
9
13' - 0"
10
PARTS
RACKING,
UPPER LEVEL
TOOLS
11 X 12 HIGH SPEED
RYTEC DOOR
BENCH
BENCH
TV
42" COMPUTER BAR/ FREE
STANDING COUNTER
BENCH
12' - 0"
6
12' - 0"
DF
BENCH
SLIDING WINDOW
MOP
SINK
RETAIL
PARTS
COUNTER
13' - 11 5/8"12' - 0"12' - 0"
PARTS
MGR
13' - 0"19' - 3"12' - 0"13' - 8 1/2"
SAFETY SHOWER/
EYEWASH
BENCHBENCH
HYUNDAI GATEWAY
ELEMENT8' H CMU WALL TRENCH DRAIN
TRENCH DRAINLINE OF 16 x 16 BOX-OUT
ELEMENT ABOVE 4' H CMU WALL13' - 9"
TANK ROOM
(COMPRESSOR
ROOM ABOVE)
FIRE DEPARTMENT
SPRINKLER
CONNECTION
DATA RM
ABOVE
8' H CMU WALL
W/ METAL PANEL
ABOVE
GLASS VESTIBULE w/
GLASS CEILING TO OUTSIDE FND.25' - 8 1/2"24' - 0"24' - 10 1/4"DIRECTIONAL
SIGNS- ABOVE"SERVICE"
"PARTS""CASHIER"
"RESTROOM"HYUNDAI PILLAR 4 SERVICEMENU BOARDPLEDGEPLAQUEDIRECTIONALSIGNS- ABOVE"SERVICE"POSTERWALK OFF
MAT
MEN'S
10
WOMEN'S
9
VESTIBULE
1
SHOWROOM
2
LOUNGE
8
RETAIL PARTS
16
SERVICE
WRITE-UP
15
SERVICE MGR
17
LOCKER
18
PARTS
21
SPRINKLER
22
TANK RM
23
ELECT.
24
SERVICE
26
SERVICE
DRIVE
25CURTAIN BY OTHERSCURTAIN BY OTHERSCOFFEE
COUNTER
PARTS RACKING,
UPPER LEVEL
89' - 4"19' - 8"
ANNUNCIATOR PANEL
FIRE DEPT. KEY 'KNOX' BOX
w/ BEACON ABOVE
GAS METER
ELECTRIC PANEL
TEL/ DATA UNDER SLAB, TO
CONDUIT TO 2 nd FLOOR
169' - 0"HYUNDAI CLOUD ABOVE
DISPLAY CAR W/ CARPET
BELOW
KEY DROP BOX
ON PEDESTAL
15' - 2"14' - 0"14' - 10"
COORDINATE LOCATION OF
UNDERSLAB/ INGROUND
VEHICLE EXHAUST SYSTEM
WALK OFF
MAT
WALK OFF
MAT
TECH COUNTER
WATER
BUBBLERVEND
F & I
7
INTERNET
6
OFFICE
5
SALES MGR
4 F & I
3
OFFICE
11
OFFICE
12
BUSINESS
OFFICE
13
HALL B
19
KEY CAB. RECESS
KEY CAB., RECESS
ROLL UP DOOR
MAIN POWER
SWITCH/
CONTROLS FOR
ALL EQUIPMENT &
LIGHTING3 7/8"109' - 0"
HYUNDAI TUBE
31' - 0"HALL A
14
BREAK ROOM
20
44' - 0"
COORDINATE LOCATION
OF HOSE REELS ABOVE
WALK OFF
MAT
WH
HYUNDAI PILLAR 3
DIRECTIONAL
SIGNS- ABOVE"SALES"
"SHOWROOM" DECAL
"SERVICE"
DECAL
FE-A
FE-A
FE-A
FE-A
FE-B
FE-B
FE-B
FE-B
FE-B
FE-A
FE-B
FE-B
FE-B
UNDER SLAB EXHAUST
UNDER SLAB
EXHAUST
SALES COUNTER
6' - 9 5/8"1' - 6"1' - 0"HYU
N
D
AI
CAR
P
ET
M
AT
H
Y
U
N
D
A
I
LI
G
H
T
C
L
O
U
D
(AB
O
V
E
)HYUNDAICARPET MATLINE OF PARTS RACKING
BY OWNER, RAILING BY
PARTS RACKING
INSTALLER
TANKS RM
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
LINE OF PARTS RACKING BY
OWNER, RAILING BY PARTS
RACKING INSTALLER
28
TEL/ DATA
28
PARTS
RACKING
27
COMPRESSOR
29
LADDER TO ROOF HATCH
BLOWER EXHAUST
INTAKE FROM BELOW, BY
DS. COORDINATE WALL
OPENING FOR LOUVER
29
INSTALL METAL WALL PANELS FOLLOWING
INSTALL OF COMPRESSOR
FE-C
FE-B
FE-B
FE-A 20 lb ABC TYPE PRESSURIZED
FE-B 10 lb ABC TYPE PRESSURIZED
FE-C 5 lb HALOTRON TYPE
FIRE EXTINGUISHER LEGEND
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A1.4FIXTURE PLAN (FOR REFERENCE ONLY)PROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009 1/8" = 1'-0"1 FIXTURE PLAN (REFERENCE ONLY)
1/8" = 1'-0"2
FIXTURE PLAN PARTS RACKING
(REFERENCE ONLY)
GENERAL NOTE: THIS PLAN FOR REFERENCE ONLY.
FURNITURE AND EQUIPMENT ARE BY OTHERS. COORDINATE
AS REQUIRED.DATEDESCRIPTION02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON07-19-13ISSUED FOR CONSTRUCTION REVISION08-01-13ISSUED FOR CONSTRUCTION REVISION10-08-13ISSUED FOR CONSTRUCTION REVISION11-26-13FURNITURE UPDATES
TO REFLECTING SURFACE40" MAXELECTRIC DRYER
OR FOLDED PAPER
TOWEL (1)
MIRROR 24"7" TO 9"
TOILET PARTITION
WHERE OCCURS, SEE
PLAN
42"12"6"42"
18"33" MIN. TO 36" MAX TO TOP17"- 19"MIN. CLR.1 1/2"17"42"12"24"RIM @ 34" MAX.CL OF OPENING
15" MIN.
WATER CLOSET
SIDE WALL
1 1/2" DIA. GRAB
BAR WITH 1 1/2"
GAP FROM WALL
WATER CLOSET
BACK WALL
URINAL
(ACCESSIBLE WHERE ONLY 1 URINAL
PROVIDED, ELONGATED RIM)
URINAL SCREEN
WHERE OCCURS
(MIN. 30" BETWEEN)
LAVATORY OR VANITY SINK
*SIM CLEARANCES @ DRINKING FOUNTAIN27" MIN.OFFSET WASTE
(INSULATED)
ACCESSIBLE
SINK BOWL
6 1/2" DEEP
MAX.
TYPICAL TOILET ACCESSORIES MOUNTING HEIGHTS
TYPICAL PLUMBING FIXTURES AND ACCESSORIES MOUNTING HEIGHTS
60" MIN. CLEAR
9"6"TOE SPACE
MIN. CLEAR
COUNTER
WHERE OCCURS,
SEE PLAN
TOILET PAPER
DISPENSER (2)
TOILET PAPER
HOLDER (2)24" MIN. CL ROLL(1) APPLIES TO ALL FIXTURES/ DISPENSERS
REQUIRING HAND OPERATION. OPERATION
SHALL NOT REQUIRE TWISTING OR TURNING
OF HAND/ WRIST.
(2) MUST ALLOW CONTINUOUS
FLOW OF PAPER WITHOUT
DELIVERY CONTROL DEVICE.
MIN. CLEAR
4' - 0"
NO FIXTURES TO BE
MOUNTED ABOVE
GRAB BARS
17" MIN.2' - 10"OFFSET
WASTE
(INSULATED)
HW,
INSULATE,
SMOOTH
8"9"6"
LEVER TYPE
NO FIXTURES TO BE
MOUNTED ABOVE
GRAB BARS TO CONTROLS42" MAX.MIN. CL. OF ROLL2' - 0"MIN. CLEAR1 1/2"MIN. CLEAR TO GRAB BAR1 1/2"SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A1.5ACCESSIBILITY STANDARDSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT11-26-13AAB REVS
VAC
2
60" workbench/
Overhead cabinet
BALANCERWHEELEXISTINGLATHE
BRAKE
SL210i-FA SL210i-FA SL210i-FASL210i-FA
AIR
OIL
OIL2
WWF
AIROILOIL2WWFAIR
AIR
OIL
OIL2
WWF
AIR
AIR
OIL
OIL2
WWF
AIRAIROILOIL2WWFAIRAIROILOIL2WWF60" workbench/
Overhead cabinet
60" workbench/
Overhead cabinet VAC
2
W/AF
EXISTING
FLAMMABLE
STORAGE CABINET
FUTUREFUTUREFUTUREFUTUREFUTURE
FUTUREFUTUREFUTUREFUTUREFUTUREH AR V E YI N DU S TR I ESA KR O N O HI O H AR V E YI N DU S TR I ESA KR O N O HI O H AR V E YI N DU S TR I ESA KR O N O HI OH AR V E YI N DU S TR I ESA KR O N O HI O H AR V E YI N DU S TR I ESA KR O N O HI OH AR V E YI N DU S TR I ESA KR O N O HI O
H AR V E YI N DU S TR I ESA KR O N O HI O
H AR V E YI N DU S TR I ESA KR O N O HI O
H AR V E YI N DU S TR I ESA KR O N O HI OH AR V E YI N DU S TR I ESA KR O N O HI O
H AR V E YI N DU S TR I ESA KR O N O HI O
H AR V E YI N DU S TR I ESA KR O N O HI O
H AR V E YI N DU S TR I ESA KR O N O HI O
8" Pipe
8"Pipe
12"Pipe
ELECTRICAL SCHEDULE FOR Dealer Solutions and Design
Symbols Equipment Manufacturer Voltage Phase HP/Amp Comments
AC Air Compressor Curtis 460 3 5hp/ 7 A Connections by GC. Disconnects per local code.
Includes Mag Starters mounted and prewired to motors
AD Air Dyer Curtis 120 1 3 A Connections by GC. Disconnects per local code.
AM Align Machine Hunter Engineering 120 1 6 A Duplex Outlet. Isolated Ground.
AS Air Solenoid Graco 120 1 1 A Duplex Outlet mounted 72" AFF
EB Exhaust Blower Harvey Industries 460 3 2hp/ 3 A Connections by GC. Disconnects per local code.
Mag Starter provided by DSD. Installed by GC.
EC Cord Reel Cox 120 1 Duplex Outlet mounted 96" AFF
LP Lift Power Unit Rotary Lift 208 / 230 1 2hp / 17 A Connections by GC. Disconnects per local code.
PW Pressure Washer Landa 120 1 20 A Connections by GC. Disconnects per local code.
TC Tire Changer Hunter Engineering 208 / 230 1 15 A Use NEMA Recepticle L6-20R
TM Tank Monitor BJ Enterprises 120 1 1 A Quad Outlet 72" AFF
VS Vacuum IVS 120 1 20 A Connections by GC. Disconnects per local code.
WB Wheel Balancer Hunter Engineering 208 / 230 1 10 A Use NEMA Recepticle L6-20R
55 Gal
Drum
55 Gal
Drum
55 Gal
Drum
W/W
120363LPR
4836BR
96183LTR
48187SC
48187SC 48187SC
48187SO 48187SO 48187SO
48187SO 48187SO 48187SO
48247SO
48247SO 48247SO 48247SO48247SO48247SO
48187SO
48187SO
48247SC
48187SC
60183LTR
36247SO36247SO36247SO
48187SC48187SC48187SCANN REF.7 8
12345
9 10
PARTS
RACKING,
UPPER LEVEL
TOOLS
11 X 12 HIGH SPEED
RYTEC DOOR
BENCH
BENCH
TV
COMPUTER
COUNTER/ BAR
BENCH
6
DF
BENCH
SLIDING WINDOW
MOP
SINK
RETAIL
PARTS
COUNTERPARTS
MGR
SAFETY SHOWER/
EYEWASH
BENCHBENCH
8' H CMU WALL TRENCH DRAIN
TRENCH DRAIN4' H CMU WALLTANK ROOM
(COMPRESSOR
ROOM ABOVE)
FIRE DEPARTMENT
SPRINKLER
CONNECTION
DATA RM
ABOVE
8' H CMU WALL
W/ METAL PANEL
ABOVE
GLASS VESTIBULE w/
GLASS CEILING
DIRECTIONALSIGNS- ABOVERESTROOMPARTS
SERVICE
HYUNDAI PILLAR 4 SERVICEMENU BOARDPLEDGEPLAQUEDIRECTIONALSIGNS- ABOVESERVICEPOSTER
WALK OFF
MAT
MEN'S
10
WOMEN'S
9
VESTIBULE
1
SHOWROOM
2
LOUNGE
8
RETAIL PARTS
16
SERVICE
WRITE-UP
15
SERVICE MGR
17
LOCKER
18
PARTS
21
SPRINKLER
22
TANK RM
23
ELECT.
24
SERVICE
26
SERVICE
DRIVE
25CURTAIN BY OTHERSCURTAIN BY OTHERSCOFFEE
COUNTER
PARTS RACKING,
UPPER LEVEL
ANNUNCIATOR PANEL
FIRE DEPT. KEY 'KNOX' BOX
GAS METER
ELECTRIC METER
TEL/ DATA UNDER SLAB, TO
CONDUIT TO 2 nd FLOOR
HYUNDAI CLOUD ABOVE
DISPLAY CAR W/ CARPET
BELOW
KEY DROP BOX
ON PEDESTAL
COORDINATE LOCATION OF
UNDERSLAB/ INGROUND
VEHICLE EXHAUST SYSTEM
WALK OFF
MAT
WALK OFF
MAT
TECH COUNTER
WATER
BUBBLERVENDVEND
F & I
7
INTERNET
6
OFFICE
5
SALES MGR
4
F & I
3
OFFICE
11
OFFICE
12
BUSINESS
OFFICE
13
HALL B
19
KEY CAB. RECESS
KEY CAB., RECESS
ROLL UP DOOR
MAIN POWER
SWITCH/
CONTROLS FOR
ALL EQUIPMENT &
LIGHTING
HYUNDAI TUBE
HALL A
14
BREAK ROOM
20
COORDINATE LOCATION
OF HOSE REELS ABOVE
WALK OFF
MAT
BD-11 BLOWER
48722L HORSE SHOE WRAPW/SIDE DIVIDERSFLOOR AS 3RD LEVEL48722L HORSE SHOE WRAPW/SIDE DIVIDERSFLOOR AS 3RD LEVEL48722L HORSE SHOE WRAPW/SIDE DIVIDERSFLOOR AS 3RD LEVEL48722L HORSE SHOE WRAPW/SIDE DIVIDERSFLOOR AS 3RD LEVEL96183LTR
96183LTR
96364L
96484L
LINE OF PARTS RACKING
BY OWNER, RAILING BY
PARTS RACKING
INSTALLER
TANKS RM
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
LINE OF PARTS RACKING BY
OWNER, RAILING BY PARTS
RACKING INSTALLER
28
TEL/ DATA
28
PARTS
RACKING
27
COMPRESSOR
29
LADDER TO ROOF HATCH
BLOWER EXHAUST
INTAKE FROM BELOW,
BY DS. COORDINATE
OPENING FOR
LOUVER
29 3400 Corporate Way,Suite ADuluth, GA 30096770-274-3499 Office770-349-3461 FaxREVISION DATEPROJECT NAME:SCALE=Notice of Confidential InformationThis drawing is design and conceptis the property of DSD and shall not bereproduced without written permission, norused for any purpose detrimental to the intrest of DSD.1.31.13COUNTRY HYUNDAI18"=1'
A1.6
J
8"STRUCTURAL CHANNEL BY CECO
HIGH SPEED
ROLL-UP DOOR
HIGH SPEED
DOOR OPN'G
ROLL-UP DOOR
TRACK ENCLOSURE, FASTEN TO
STRUCTURAL CHANNEL
6" METAL STUD
FRAMING
GWB
9 1/2" BOX TRIM TO MATCH
DOOR
1/2" PLYWOOD BY STUD FRAMING INSTALLER
2" RIGID INSULATION
STEEL ABOVE AS
REQUIRED AT RYTEC
OPENING, VERIFY WITH
MANUFACTURER. GWB TO
BEHIND DOOR FRAMING
ALUMINUM COMPOSITE PANEL
VAPOR BARRIER
BATT CAVITY
INSULATION
SELF ADHERED MEMBRANE OVER
PLYWOOD, LAP TO RIGID INSULATION
FOUNDATION
LINE
J
0.050 CLEAR ANODIZED BREAK METAL L
(2"x 2") TO MATCH STOREFRONT
@ JAMB CURTAINWALL CONTR.
(PROFILE TO RIGHT). MEMBRANE TAPE
OVER EDGE AND FASTENER.
2" RIGID. TAPE AND SEAL ALL
JOINTS AND PENETRATIONS
1/2" DENSGLASS, TAPED AND SEAL JOINTS
ALUMINUM COMPOSITE PANEL
ACM ANGLE TO VERTICAL STRAPPING, BY ACM
INSTALLER. BLIND RIVIT TO MATCH PANEL
5/8" GWB TO JAMB
PERIMETER CAULK BY PAINTER,
TYPICAL ALL DOORS AND WINDOWS
STOREFRONT DOOR JAMB, BACKER
ROD & CAULK BY CURTAINWALL
CONTRACTOR
2x10, RIPPED TO SIZE (8 5/8")
FULL HEIGHT STUD WALL
VAPOR BARRIER, CONTINUOUS TO EXT.
FACE OF BLOCKING
FOUNDATION
LINE
6
K
0.040 CLEAR ANODIZED BREAK METAL TO
MATCH STOREFRONT
@ JAMB & HEAD BY CURTAINWALL
CONTR. (2"x2")
2" RIGID INSULATION, TAPED JOINTS
1/2" DENSGLASS
ALUMINUM COMPOSITE PANEL
ANGLE TO VERTICAL STRAPPING,
ACM RIVET TO ANGLE. #3 OR #4
BLIND RIVET TO MATCH PANEL.
5/8" GWB TO JAMB
PERIMETER CAULK BY PAINTER,
TYPICAL ALL DOORS AND WINDOWS CURTAINWALL JAMB, BACKER ROD &
CAULK BY CURTAINWALL
CONTRACTORJAMB STUD FASTEN TO HEADER ABOVE
WITH CLIP ANGLE
FULL HEIGHT STUD WALL
3 5/8" FURROUT STUD
FRAMING
CECO COLUMN
BATT INSULATION BETWEEN STUDS
VAPOR BARRIER, INSIDE STUD FRAMING
7 3/8" VIF
1' - 9 1/4" TO R.O.VIF
6 3/4"
7/8"
FACE OF FOUNDATION
9"
6
0.040 CLEAR ANODIZED BREAK METAL TO
MATCH STOREFRONT
@ JAMB & HEAD BY CURTAINWALL
CONTR. (2"x2" ANGLE SHAPE)
2" RIGID INSULATION, TAPE ALL JOINTS
ALUMINUM COMPOSITE PANEL
ANGLE TO VERTICAL STRAPPING,
ACM RIVET TO ANGLE. #3 OR #4 BLIND
RIVET TO MATCH PANEL.
5/8" GWB TO
JAMB
PERIMETER CAULK BY PAINTER,
TYPICAL ALL DOORS AND WINDOWS
CURTAINWALL JAMB, BACKER ROD &
CAULK BY CURTAINWALL CONTRACTOR
2x10, RIPPED TO SIZE, AS REQUIRED AT
PERIMETER OF STOREFRONT
3 5/8" FURROUT STUD
FRAMING
CECO COLUMN
NOTCH FURROUT
AROUND COLUMN AS
REQUIRED
METAL STUD FRAMING
VAPOR BARRIER, INSIDE STUD
FRAMING, TO EXTERIOR FACE OF
WOOD BLOCKING
VERTICAL STRAPPING AS REQUIRED
BY ACM INSTALLER
BATT INSULATION, CAVITY
11 1/2" VIF FOUNDATIONLINE7/8"
3
GWB WRAP
OPENING, PAINT
METAL STUD FRAMING,
SEE WALL TYPE
DRYWALL CORNER
BEAD, TYPICAL
DRYWALL SOFFIT W/ METAL STUD
HEADER ABOVE
PRINTER & FAX SHELF @
35" A.F.F. W/ CABINETS
BELOW
WALL MOUNTED
CABINETS ABOVE
7 3/8"7
J
.050 ALUM. EDGE
FLASHING, MATCH METAL
PANEL, RETURN 3" INTO
BLOCK
CAULK JOINT
ACM PANEL AND EXTRUSION
METAL STUD FRAMING
1/2" DENSGLASS
RIGID INSULATION, WRAP
CORNER, TAPE AND SEAL
JOINTS
BATT INSULATION, FILL
ALL CAVITIES
5/8" GWB
END GWB
CECO 8 3/4" OPEN CEE
CHANNEL TO FINISH FLOOR
CECO
COLUMN FND. LINEI
1
VAPOR BARRIER,
CONTINUOUS, TAPE
JOINTS
3 5/8" FURROUT
5/8" GWB
FURROUT AS
REQUIRED @
COLUMN
6" METAL STUD W/ BATT
INSULATION
VAPOR BARRIER, CONTINUOUS,
BYBASS COLUMN
2X6 BLOCKING AT
STOREFRONT JAMB
STOREFRONT OFFICE
WINDOW & DOOR, SEE
PLAN
5/8" GWBB6
FOUNDATION LINE
E
LINER PANEL
2x WOOD JAMB FRAMING
3/4" PLYWOOD
J TRIM
2"
SHUTTER DOOR
TRACK
ANGLE AT PANEL TERMINATION
CECO FRAMING
EDGE OF TECH COUNTER,
STAINLESS STEEL
BREAK METAL WRAP OPENING
METAL PANEL
SS DESK BELOW
LINER PANEL
2x WOOD JAMB FRAMING
3/4" PLYWOOD, PAINT
TO MATCH PANELS
WHERE EXPOSED
J TRIM
2"
SHUTTER DOOR TRACK
J TRIM
LINER PANEL
CECO FRAME
EDGE OF TECH COUNTER
BREAK METAL WRAP OPENING
1
VERTICAL CECO PANELS
J TRIM TO MATCH CECO
PANELS
8 3/4" OPEN CEE TO TERMINATE GIRTS, PAINT
FACE GRAY WHERE EXPOSED
LINE OF CECO GIRT WALL
CECO INTERIOR (CONTINUOUS INSULATION)
METAL PANELS
METAL STUD CAVITY, SEE WALL TYPE.
AIR & MOISTURE BARRIER FACED
INSULATION, CONTINUOUS PAST GIRTS,
TAPE & SEAL ALL JOINTS
TAPE EDGE OF INSULATION TO
VERTICAL C CHANNEL
1/2" DENSGLASS
BATT INSULATION BETWEEN STUDS
RIGID INSULATION,TAPE JOINTS
VERTICAL METAL STRAPPING
ACM METAL TRIM
ACM PANEL
CAULK JOINT
MEMBRANE FLASHING, EXTRUDED
ACM TRIM TO C CHANNEL
FOUNDATIONLINESHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A1.7PLAN DETAILSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
3" = 1'-0"1 DETAIL @ RYTEC DOOR JAMB
3" = 1'-0"2 DETAIL AT STOREFRONT DOOR JAMB
3" = 1'-0"6 CURTAINWALL JAMB DETAIL
3" = 1'-0"3 CURTAINWALL & FURROUT AT COLUMN
3" = 1'-0"4 DETAIL AT OPENING
3" = 1'-0"7 OUTSIDE CORNER @ SERVICE DRIVE
3" = 1'-0"10 EXTERIOR WALL @ COLUMN
3" = 1'-0"8 FRAMED OPENING- TECH COUNTER
3" = 1'-0"9 FRAMED OPENING @ TECH COUNTER
3" = 1'-0"5 Callout @ WALL TRANSITION DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON
Service
T.O.F SLAB
150' - 0"
4 6 7325
HEG-15
ENTRANCE GATEWAY, METAL PANELS AND DOOR CONTINUE
BEHIND, SEE PLAN FOR LOCATION. PROVIDE POWER TO SIGN
HYUNDAI SILVER METAL PANELS
HYUNDAI BLUE METAL PANELS
1
A3.1
2
A3.1
12' - 0 1/4"ACM FACE WIDTH
2' - 5 1/2"OUT OF FRAME
15' - 0"
2' - 4"FIN OPENING.
15' - 0"20' - 1"
FIN. OPENING
15' - 0"
2' - 4"FIN OPENING
15' - 0"
PANEL EDGE AT STOREFRONT TO FND.
2' - 3 1/2"
2' - 2"13' - 10"16' - 0"PARAPET CAP W/ 4" FACE AND DRIP EDGE.
MATCH PANEL COLOR BELOW
2' - 8"
FIN. OPENING
11' - 0"
2' - 1"
3' - 4"
7"
19' - 8"89' - 4"9' - 6"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"3' - 5 1/2"
44' - 8"44' - 8"PARAPET CAP W/ 4" FACE AND DRIP
EDGE. MATCH PANEL COLOR BELOW
HYUNDAI SILVER
METAL PANELSRETURN ACM AROUND CORNERTOP OF WOOD BLOCKING24' - 6"A2.1
5
1
BEYOND
GATEWAY
2
A4.2
1
A4.2
3
A4.2
5
A4.2
FACE OF
FOUNDATION,
FACE OF STUD
15' - 0"KEY DROP BOX ON
PEDESTAL
4
A4.2
109' - 0"
1 25A
25B
TOP OF METAL STUD FRAMING24' - 3"POWER TO
SIGN, 120 V,
20 AMP
HYUNDAI BLUE ACM PANELS OVER PLYWOOD, METAL FRMAING AND
CECO STEEL FRAMING, SEE SECTIONSEE ELEVATION #6, THIS SHEET
FOR FRAMING LOCATIONS)2' - 7 1/2"9' - 10"17' - 1"7' - 9"2' - 1"12' - 5 1/2"2' - 7 1/2"2' - 7 1/2"
POWER TO SIGNAGE, 120 V, 20 AMP
HYUNDAI SIGNAGE BY AGI, PROVIDE POWER TO SIGN LOCAITION
SILVER METAL PANELS
CECO- MSP WALL PANEL
ABCDEFHJKLIG
BLUE METAL PANELS, WRAP CORNER
TO EDGE OF VERTICAL CECO PANEL
ACM METAL PANELS TO WRAP
CORNER, CONTINUE REVEAL TO
EDGE OF VERTICAL CECO PANEL.
PROVIDE ACM EDGE TRIM
CAULKED JOINT AT CMU &
METAL PANEL TRANSITION
BY ACM INSTALLER
PERIMETER J TRIM TO
MATCH CECO PANEL
METAL PANEL BOX ELEMENT BEYOND
AGI FREE STANDING
ELEMENT BEYOND, SEE
STRUCTURE FOR
FOUNDATION
BLUE PARAPET CAP
TO TURN CORNER
GUTTER TO
DOWNSPOUTS BY
ROOFER
METAL PARAPET CAP TO MATCH PANELS
LINE OF SINGLE SLOPE ROOF TO GUTTERS
AT REAR OF BUILDING
19' - 11 1/2"4' - 6 1/2"3' - 6 1/4"T.O. PARAPET BLOCKING24' - 6"4' - 0"T.O. CURTAINWALL15' - 0"4
A3.1
3
A4.3
ROOF HATCH GUARD RAIL
AND LADDER UP BEYOND
METAL
PARAPET TO
MATCH PANELS
2' - 6 1/4"15' - 0"2' - 8"9' - 4"1' - 5 3/4"
FACE OF PANEL DIMENSIONS15' - 0"SCORED CMU KICKWALL
GREY TO 4'-0"28' - 0 1/4"26B
26A
ACM CECO
2A
4' - 0"42' - 5 3/4"42' - 5 3/4"40' - 0"9' - 0 1/2"
EQ EQ
T.O.F SLAB
150' - 0"
13' - 10"2' - 2"
SILVER METAL PANELS
15' - 0"CECO- MSP WALL PANEL
A B C D E F H K LI
3
A3.1
15' - 0" R.O.2' - 8"15' - 0" R.O.2' - 4 1/4"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"16' - 0"12' - 0 1/4"PARAPET CAP, MATCH ACM
PANEL, FURNISH BY ACM,
FAB INSTALL BY ROOFER
PARAPET CAP, MATCH
CECO PANEL, FAB,
FURNISH & INSTALL BY
ROOFER.
GAS METER
FIRE DEPT. KEY 'KNOX'
BOX W/ STROBE ABOVE
FIRE DEPT. CONNECTION
LINE OF SINGLE SLOPE ROOF LINE
TO GUTTER AT REAR OF BUILDING
HYUNDAI
GATEWAY
BEYOND
GUTTER TO
DOWNSPOUTS
STOREFRONT WINDOWS, (TYP OF 3 )
W/ CENTER HORIZONTAL MULLION
4
A3.1
3' - 4 3/8"
1
A4.3
2
A4.3
ROOF HATCH GUARD RAIL & LADDER
UP( 10' MIN. FROM ROOF EDGE)
5
A4.3
16' - 0"COL. LINE FACE
OF FOUNDATION,
FACE OF STUD
4' - 0"13' - 0"3' - 6"4' - 6"
SCORED CMU KICKWALL
GREY TO 4'-0"28' - 0 1/4"TOP OF BLOCKING19' - 11 1/2"TOP OF WOOD BLOCKING24' - 6"26D
26C
23 22A 21D 21C
X03 X02 X01
2B2C
ACMCECO
HYUNDAI BLUE BOX ACM PANELS W/ SIGNAGE SURFACE MOUNTED. ACM PANELS
OVER PLYWOOD & MOISTURE BARRIER, STUD FRAMING AND CECO STEEL.
PROVIDE RIGID INSULATION BLOCKING AT SIGNAGE LOCATIONS. (SEE ELEVATION
#6, THIS SHEET FOR FRAMING LOCATIONS (SIMILAR, MIRROR))
SIGNAGE BY AGI.
PROVIDE
POWER TO
24"X24" INTAKE
LOUVER
13"X13" EXHAUST
FAN
4' - 0"2' - 8"7' - 0"8' - 1 5/8"7' - 0"8' - 0"44' - 0"ALIGN CL OF
DOOR 21C
467 3 25
CECO- MSP WALL PANEL
SCORED CMU KICKWALL
GREY TO 4'-0"
1
A3.1
1
1/4" PER 1'-0" SLOPED TPO MEMBRANE ROOFING
OVER 5" RIGID INSULATION AND METAL B DECK,
MEMBRANE TO OVER PARAPET BLOCKING AT FRONT
AND SIDE WALLS
GUTTER TO DOWNSPOUTS TO
MATCH METAL PANEL BY ROOFER,
PER MANUFACTURER
REQUIREMENTS
20' - 6 1/2"METAL PARAPET CAP,
TO MATCH PANELS,
BY ROOFER
BOX ELEMENT
BEYOND, AT FRONT
OF BUILDING
FRONT WALL PARAPET BEYOND
DOWNSPOUTS BY ROOFER, MATCH GUTTER,
SEE SITE FOR CONNECTIONS TO
STORMWATER MANAGEMENT SYSTEM
SINGLE SLOPE ROOFING MEMBRANE
ALUMINUM THROUGH WALL
FLASHING & ROOFING MEMBRANE
TO BEHIND 'BOX ELEMENT' BY
ROOFER
BOLLARDS
ROOF HATCH, GUARD RAIL
AND LADDER UP BEYOND,
BY ROOFER
4' - 0"14' - 5 7/8"EQEQEQEQEQEQEQEQEQEQEQEQ
STOREFRONT WINDOWS (3'X7') IN
CECO FRAMED OPENINGS (TYP OF 6
AT REAR WALL)
X04 X05 X06 X07 X08 X09
BACK SIDE OF ALL PARAPETS, ROOFER
PROVIDE 1-1/2" RIGID POLYISO W/
PLYWOOD OVER TO UNDERSIDE OF
PARAPET BLOCKING
BACK SIDE OF ALL PARAPETS,
CARPENTER PROVIDE 1/2" DENSGLASS
TO UNDERSIDE OF BLOCKING, SEAL ALL
JOINTS
34' - 5"32' - 8"
T.O.F SLAB
150' - 0"
43
4' - 4 1/2"11' - 4"4' - 4 1/2"
4' - 10 1/4"4' - 10 1/4"
1
10' - 2 5/8"7' - 0"T.O.F SLAB
150' - 0"
1
5
A4.2
3' - 6"3' - 10"3' - 10"3' - 10"
1' - 0"
TUBE STEEL BY CECO
WIND BEAM BY CECO
5' - 0"16' - 6"21' - 6"12' - 0 1/4"METAL STUD FRAMING
ATTACHED TO CECO
STEEL, SEE SECTION
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A2.1EXTERIOR ELEVATIONSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
1/8" = 1'-0"1 WEST/ FRONT ELEVATION
1/8" = 1'-0"4 SOUTH/ RIGHT SIDE ELEVATION
1/8" = 1'-0"3 NORTH/ LEFT SIDE ELEVATION
1/8" = 1'-0"2 EAST/ REAR ELEVATION
1/8" = 1'-0"5 Callout of WEST/ FRONT ELEVATION
1/8" = 1'-0"6 FRAMING ELEVATION
DATEDESCRIPTION01-11-13ISSUED FOR BID01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON08-01-13ISSUED FOR CONSTRUCTION REVISION09-17-13ISSUED FOR CONSTRUCTION REVISION
T.O.F SLAB
150' - 0"
J K LI
CURTAINWALL
SYSTEM
BEYOND
COLUMN FURROUT
GYP. SOFFIT
CURTAINWALL
SYSTEM
BEYOND
CLOUD ELEMENT BEYOND,
HUNG FROM STRUCTURE
ABOVE
SHOWROOM
2
SALES MGR
4
VESTIBULE
1
T.O.F SLAB
150' - 0"
46 3 25 1
FURROUT METAL
FRAMING W/ GWB
OVER. PAINT.
WRAP COLUMNS, TYP.WRAP COLUMNS, TYP.TILE BASE, TYP. MATCH
FLOOR FINISH
CURTAINWALL SYSTEMCURTAINWALL SYSTEM CURTAINWALL SYSTEM CURTAINWALL SYSTEM
SLIDER DOOR WITH TRANSOME ABOVE
1A
ENTRY VESTIBULE
FURROUT METAL
FRAMING , GWB, PAINT
SOFFIT ABOVESOFFIT ABOVE SOFFIT ABOVE SOFFIT ABOVE
SOFFIT
GWB, PAINT
T.O.F SLAB
150' - 0"
KL I1
A4.3
2
A4.3
GWB, PAINT GWB SOFFIT GWB SOFFIT
CURTAINWALL
BEYOND
STOREFRONT GLASS CEILING, ALIGH
WITH EXTERIOR MULLIONS
2C
DOOR BEYOND
CURTAINWALL
BEYOND
GYP. SOFFIT
T.O.F SLAB
150' - 0"
T.O. FRAMING
174' - 3"
4 6325
1
A3.1
ALIGN GWB OPENING,
PAINT
1
ACT CEILING
BUTT GLAZING, TYPICAL @ INTERIOR
STOREFRONT
OPENING TO LOUNGE
OPENING TO HALL
GWB TO 1' ABOVE
CEILING, PAINT,
TYPICAL
15' - 8"7' - 6"8' - 11 5/8"16' - 8 3/8"3' - 6 1/2"4' - 0"7 1/4"9' - 2 1/4"1' - 0 7/8"8' - 6 3/4"8 7/8"9' - 3"1' - 9 1/4"
7 6 5 3
COLUMN FURROUT
BEYOND
GWB SOFFIT RETURN TO
CURTAINWALL
LIGHT FIXTURES
CECO BEAMCECO GIRTS
METAL B DECK
RIGID INSULATION
MEMBRANE ROOFING
PARAPET NOT SHOWN. SEE SECTIONS
LAMINATE COUNTER
PAINT GWB
7
A4.4
5' - 4"
T.O.F SLAB
150' - 0"
651
A3.1
MAX.2' - 10"1' - 3"2' - 6"2' - 6"
SOLID SURFACE
COUNTER TOP
LAMINATE
STAINLESS STEEL
TRASH SLOT RING
4"SOLID PANEL
GLASS
GWB OPENING
DUPLEX OUTLET (2)
STOREFRONT
MULLION
WATER BUBBLER BY
OWNER, PROVIDE POWER
3' - 0"1' - 3"
WATER LINE FOR COFFEE MAKER
T.O.F SLAB
150' - 0"
MICROWAVE SHELF, LAMINATE
LAMINATE CABINETS W/ 1
SHELF
OWNER EQUIPMENT,
PROVIDE OUTLETS/
POWER AS REQUIRED.
COORDINATE
LAMINATE COUNTERTOPS W/
BACKSPLASH
BRUSHED STAINLESS STEEL
HARDWARE (TYP.)
STAINLESS SINK W/ PADDLE LEVERS
LAMINATE BASECABINETS W/
ADJUSTABLE SHELVES AND TOP
DRAWERS(FAUX DRAWER AT
SINK), TOE KICK
GFI OUTLETS, (2)
2' - 6"1' - 3"
1' - 3"
1' - 3"1"2' - 6"2' - 10"4"1' - 3"
1' - 3"
1' - 3"
1' - 3"
1' - 3"1"
6' - 4"
2 3/8"5' - 8 1/2"SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A2.2INTERIOR ELEVATIONSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
1/4" = 1'-0"2 SHOWROOM ELEV.- SOUTH WALL
1/4" = 1'-0"1 SHOWROOM ELEV. - WEST WALL
1/4" = 1'-0"3 SHOWROOM ELEV.- NORTH WALL
1/4" = 1'-0"4 SHOWROOM ELEV. -EAST WALL
1/4" = 1'-0"5 LOUNGE- COFFEE COUNTER
1/4" = 1'-0"6 BREAK ROOM ELEVATION DATEDESCRIPTION01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON09-17-13ISSUED FOR CONSTRUCTION REVISION10-08-13ISSUED FOR CONSTRUCTION REVISION10-11-13ISSUED FOR CONSTRUCTION REVISIONSEE A
4.
4
F
O
R
E
L
E
V
A
TI
O
N
S
T.O.F SLAB
150' - 0"
T.O. FRAMING
174' - 3"
ABCDEFHKLI
4
A3.1
A5.1
3
A5.1
5
A5.1
1
A5.2
6
LOUNGE
8
SERVICE
WRITE-UP
15 SERVICE MGR
17 SERVICE
26
SHOWROOM
2
1
A4.3 2
A4.3
HOSE REELS, MOUNTED BY D.S.
HOSE REELS
UNISTRUT FROM
PURLIN ABOVE (TYP.
AT ALL HOSE REELS)
CLOUD ELEMENT
8' - 0"LINER TO 1'-0" A.F.CGWB, WRAP OPENING
GWB TO 1'-0" AF.C.
ROOF HATCH WITH GUARD
CMU WALL- 48" HIGH
WITH SLOPED CAP,
PAINT, SEE SPEC.
CMU WALL BEYOND, 8'
HIGH, PAINT, SEE SPEC.
EMERGENCY SHOWER &
EYEWASH STATION
SLIDING WINDOWOUTLETS ABOVE FILE
DRAWERS, COORDINATE
WITH OWNER EQUIPMENT
26C
26D
SUSPENDED LIGHTING IN
WASH BAYS BEYOND
2C
KEY CABINET,
RECESSED IN WALL,
COORDINATE W/
COUNTER/ CABINETS PAINT EXPOSED CMU, SEE SPEC
PAINT EXPOSED
STRUCTURE,
SEE SPEC.
COMPUTER BAR
LAMINATE W/ PRIVACY SKIRT,
VERTICAL SUPPORTS FROM
FLOOR AS REQUIRED3' - 6"T.O.F SLAB
150' - 0"
T.O. FRAMING
174' - 3"
EFHJG
15' - 10"CECO WIND BEAM
STUD WALL FRAMING,
ATTACH TO CECO EAVE
STRUT & WIND BEAM, TYP.
METAL PARAPET CAP, FURNISH BY
ACM. INSTALL BY ROOFER
1/4" / 12"
CECO GIRT WALL W/ LINER
PANELS TO 1' BEYOND CEILING,
BOTH SIDES
GWB PARTITION FULL HEIGHT
UNDERSIDE OF PURLINS. PROVIDE
SLIP TRACK DETAIL
CECO BEAM BEYOND
RYTEK OVERHEAD
DOOR
PAINTER PAINT
OPENING PERIMETER
SOLIDSOLIDSOLID SOLID SOLID
GLASSGLASSGLASS GLASS GLASS
SLIDING DOOR
FRP TO TOP OF MULLION,
PROVIDE PERIMETER TRIM
WHERE ABUTING MULLIONS,
FLOOR, GWB ETC...
CECO BASE J TRIMSTEEL MOUNTING PLATE
@ EDGE OF DOOR
MEMBRANE ROOFING OVER 5" RIGID
INSULATION OVER ROOF DECK, OVER PURLINS
CEILING SYSTEM, SEE RCP FOR LAYOUT
VIF W/ WALL LOCATIONS
35' - 0" R.O.
7' - 0"4 3/4"18' - 0"4 1/2"9' - 2 3/4"
9' - 10"
ANGLE OR UNISTRUT HUNG
FROM STRUCTURE TO
BELOW CEILING
INSPECTION CAMERAS (2) BY
D.S.- MOUNTED TO ANGLE
FROM ABOVE.
GWB, PAINTED TO SURROUND
DOOR TO WINDBEAM
17A
15
SERVICE
DRIVE
25
SERVICE
26
FRP W/ SS. CORNER
GUARD
3' - 1"7' - 10"25B
CECO PURLIN CLOSURE, FULL
LENGTH OF SERVICE DRIVE
SLOPE SLAB TO TRENCH DRAIN
CECO EAVE STRUT & CLIP
PAINT
VAPOR RETARDER OVER STUD
FRAMING
T.O.F SLAB
150' - 0"
2
TEL/DATA/COMPRESSOR
8' - 6 7/8"
1
ANNUNCIATOR PANEL BEYOND
F.D. SPRINKLER CONNECTION
TEL/ DATA
28
PARTS
RACKING
27
PARTS
21
SPRINKLER
22
MAIN, RUN AS REQUIRED
FOR SPRINKLER SYSTEM,
SEE FIRE PROTECTION
DRAWINGS
JANITORS SINK BEYOND &
DRAIN TO SEWER
CONNECTION
WATER HEATER. SEE
ELCTRICAL & PLUMBING
REQUIREMENTS
CONDENSATE LINE FROM
COMPRESSOR ROOM, BY
DEALER SOLUTIONS, FOLLOW
WALL TO JANITORS SINK BELOW
RA3-1 CECO ANGLE
5/8" PLYWOOD
MEMBRANE ROOFING OVER PARAPET, OVER 2"
RIGID POLY ISO INSULATION, 1/2" DENSGLASSS
METAL PARAPET CAP, BY ROOFER
CECO CL200 CLIP W (4) 1/2" A325 BOLTS
CECO CHANNEL
WOOD BLOCKING,
BY ROOFER, SEE
PARAPET DETAIL
MEMBRANE ROOFING OVER INSULATION AND METAL B DECK
CECO PURLINS
SUSPENDED LIGHT
FIXTURE, MIN 8' A.F.F.
CECO RAFTER
DOOR BEYOND TO
COMPRESSOR RM
FIXTURE, FLUSH MOUNT,
MIN 7' CLEAR
22B
PSK INSULATION
GIRT W/ CLIP TO
CECO 'DOG
EAR' FRAMING
WALL PANEL
CECO PANELS 2" INSULATED
(R15) TO DECK ABOVE
CECO INTERIOR INSULATED
PANEL TO FLOOR
FRP FULL HEIGHT BEHIND
SINK AND WATER HEATER,
WRAP CMU WALL, 5' ON
PARTS WALL
CECO END WALL
DOG EAR W/
PANEL BYPASS
KNOX BOX
METAL JOIST FRAMING
OVER SPRINKLER ROOM,
TANK ROOM AND
ELECTRICAL ROOM
5
A3.1
6
A3.1
29
175 PSI WILKINSZURN6 DRAINTOCCSLU
1' - 6"
STROBE
FLOOR DRAIN
T.O.F SLAB
150' - 0"
T.O. FRAMING
174' - 3"
467 3 25
1
A3.1
TEL/DATA/COMPRESSOR
8' - 6 7/8"
2
A3.1
1
SLOPED CONC.CAP
HOSE REELS, HUNG FROM
STRUCTURE ABOVE. AB TO
PROVIDE ANGLE IRON TO
BELOW CEILING
NOTE, LINER PANEL IN PARTS FULL HEIGHT TO DECK
LINER PANEL TO 1'-0 A.F.C.
22B21B
X12
25A
SERVICE
26
COMPRESSOR
29
TANK RM
23
HATCH AND LADDER,
PAINT GUARDRAIL
TECH COUNTER IN OPENING
w/ STAINLESS STEEL TOP
PAINT CMU, SEE SPEC.
OH DOOR BEYOND
25B
FRP FULL HEIGHT,
(3) WALLS IN HALL
COILING ROLL UP DOORCECO ALUMINUM TRIM AT
OUTSIDE CORNER TO WRAP
OPENING
CECO ALUMINUM BREAK
METAL TRIM, WRAP OPENING
FLOOR JOIST FRAMING
STUD WALL TO
JOISTS. CECO
GIRTS ABOVE
B4A
C5
C3
BOX ELEMENT
BEYOND
METAL PANEL
BOX ELEMENT
BYEOND
T.O.F SLAB
150' - 0"
E
TEL/DATA/COMPRESSOR
8' - 6 7/8"
2 3/8"
ALIGN WITH WALL BEYOND
3/4" F.R.T. PLYWOOD
METAL JOIST FRAMING
5/8" GYPSUM CEILING
2x2x6x16 GA CLIP ANGLE
FASTEN TO BLOCK
8" MASONRY UNIT, TOP
COURSE BOND BEAM
GROUT SOLID
METAL RIM JOIST
B4A
COLUMN BEYOND
GWB WRAP TO CMU.
CAULK JOINT8' - 0"E
TEL/DATA/COMPRESSOR
8' - 6 7/8"
METAL PANEL
HORIZONTAL STRAPPING
METAL STUD FRAMING
JOIST FRAMING
J TRIM TERMINATION
OVER DOOR
WRAP AROUND METAL FRAME
F.R.T. 3/4" PLYWOOD
5/8" GYP. CEILING
5/8" GWB
DOOR HEADER PER
FRAMING DRAWINGS
CRIPPLE STUDS
METAL LINER PANEL
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A3.1BUILDING SECTIONS (1)PROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
1/8" = 1'-0"1 BUILDING SECTION
1/4" = 1'-0"2 SECTION @ SERVICE DRIVE
1/4" = 1'-0"3 SECTION @ SPRINKLER ROOM
1/8" = 1'-0"4
SECTION THRU SERVICE TOWARD
FRONT OF BUILDING
3/4" = 1'-0"5 WALL SECTION DETAIL
3/4" = 1'-0"6 WALL SECTION DETAIL 2
DATEDESCRIPTION01-11-13ISSUED FOR BID01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON08-01-13ISSUED FOR CONSTRUCTION REVISION08-20-13ISSUED FOR CONSTRUCTION REVISION
5/8" TAPED & FINISHED
GYP. WALL BOARD
5/8" TAPED & FINISHED
GYP. WALL BOARD
3 1/2" SOUND
BATT INSULATION
3 5/8" X 20 GA. MTL.
STUDS 16" O.C.
5/8" TAPED & FINISHED
GYP. WALL BOARD
5/8" TAPED & FINISHED
GYP. WALL BOARD
6" BATT
INSULATION
6" X 20 GA. MTL. STUDS
16" O.C.
5/8" TAPED & FINISHED
GYP. WALL BOARD
1/2" FIRE RETARDANT
PLYWOOD BLOCKING
3 1/2" SOUND
BATT INSULATION
5/8" TAPED & FINISHED
GYP. WALL BOARD
3 5/8" X 20 GA. MTL.
STUDS 16" O.C.
5/8" TAPED & FINISHED
GYP. WALL BOARD
1/2" FIRE RETARDANT
PLYWOOD BLOCKING
3 1/2" SOUND
BATT INSULATION
5/8" TAPED & FINISHED
GYP. WALL BOARD
3 5/8" X 20 GA. MTL.
STUDS 16" O.C.
5"
7 1/4"
6"
5/8" TAPED & FINISHED
GYP. WALL BOARD
5/8" TAPED & FINISHED
GYP. WALL BOARD
6" BATT
INSULATION
6" X 20 GA. MTL.
STUDS 16" O.C.
7 3/4"
1/2" FIRE RETARDANT
PLYWOOD BLOCKING
5/8" TAPED & FINISHED
GYP. WALL BOARD
5/8" TAPED & FINISHED
GYP. WALL BOARD
6" BATT
INSULATION
6" X 20 GA. MTL. STUDS
16" O.C.
8 1/4"
1/2" FIRE RETARDANT
PLYWOOD BLOCKING
1/2" FIRE RETARDANT
PLYWOOD BLOCKING
6" BATT
INSULATION
5/8" TAPED & FINISHED
GYP. WALL BOARD
6" X 20 GA. MTL. STUDS 16" O.C.
24 GA. MSP METAL PANEL
COLD FORMED STEEL ZEE GIRT
4" PSK FACED FIBERGLASS INSULATION
26 GA. METAL LINER PANEL 26 GA. LINER PANEL
COLD FORMED STEEL
ZEE GIRT
4" PSK FACED
FIBERGLASS INSULATION
TYPE A1 TYPE A2 TYPE A3 TYPE A4
TYPE B1 TYPE B2 TYPE B3 TYPE B4
TYPE C1 TYPE C2 TYPE C4
5/8" TAPED & FINISHED
GYP. WALL BOARD
3 1/2" SOUND
BATT INSULATION
3 5/8" X 20 GA. MTL.
STUDS 16" O.C.
4 1/4"
8 1/2"
24 GA. MSP EXTERIOR
METAL PANEL
COLD FORMED STEEL
ZEE GIRT
4" PSK FACED FIBERGLASS
INSULATION
2" THICK INSULATED
METAL PANEL (c.i. =R-15),
CONTINUOUS INSULATION
FROM SLAB TO ROOF
DECK. SEAL ALL
PENETRATIONS.
TYPE C3
8 1/2"
TYPE D1
8" REGULAR CMU,
PAINT. SEE SPEC.
6 5/8"
26 GA. METAL LINER PANEL
HORIZONTAL
8 1/2"
TYPE C5
TYPE D2
8" REGULAR CMU, PAINT,
SEE SPEC.
CONC. SLOPED TOP
SEE PLAN & SECTIONS FOR HEIGHTSSEE PLAN & SECTIONS FOR HEIGHTS
6" BATT INSULATION, FILL CAVITY.
5/8" TAPED & FINISHED GYP. WALL BOARD
TO ABOVE FINISH CEILING. SEE SECTIONS
1/2" DENSGLASS, TAPED JOINTS, AIR BARRIER
TYPE B6
6 5/8"2 1/2"
2" (R-10.8) RIGID EXTRUDED POLYSTYRENE
INSULATION, TAPED JOINTS AND
PENETRATIONS FOR CONTINUOUS
MOISTURE BARRIER
2" ACM WALL PANELS, RAINSCREEN
SYSTEM W/ 1/2" REVEAL
FACE OF FOUNDATION
FACE OF FDN
6" BATT INSULATION
5/8" TAPED & FINISHED
GYP. WALL BOARD
6" X 20 GA. MTL. STUDS 16" O.C.
TYPE B5
7 1/8"
26 GA. METAL LINER PANEL
HORIZONTAL
TYPE C5a
C5a= REMOVE LINER
FROM ONE SIDE
PROVIDE .050 ALUM. BASE FLASHING TO
FACE OF DENSGLASS, FLASH WITH
FLEXIBLE SELF SEALING FLASHING
TAG SIDE
TAG SIDE
TAG SIDE
TAG SIDE
6 Mil. POLY VAPOR RETARDER (FIRE
RETARDANT)
8" SINGLE SCORED
COLORED CMU
TO 4'-0", PAINT WHERE
EXPOSED, SEE SPEC.
8" SINGLE SCORED
COLORED CMU
TO 4'-0", PAINT WHERE
EXPOSED, SEE SPEC.
GALVANIZED METAL STRAPPING,
HORIZONTAL, AS REQUIRED AT METAL
PANEL JOINTS. BY ACM INSTALLER
VERTICAL STRAPPING AS REQ'D. BY ACM
6" X 18 GA. MTL. STUDS 16" O.C.
2"
7/8" AIR SPACE
BASE TRIM TERMINATION
BASE TRIM TERMINATION
1/2" PLYWOOD
1" MIN.NOT USEDB4A -18 GA. HORIZONTAL
STRAPPING @ 18" O.C.
B4A- 26 GA. METAL LINER PANEL
VERTICAL
TYPE B4A ADD HORIZONTAL STRAPPING, LINER
PANELS VERTICAL TO ALIGN WITH
ADJACENT WALL PANELS
26 GA. METAL LINER PANEL TO 1' ABV. CLNG
8" CMU
TO 8'-0", PAINT WHERE
EXPOSED, SEE SPEC. TOP
COURSE GROUT SOLID, TYP.
PANEL BASE J TRIM
TERMINATION
8" METAL FLOOR JOIST, AS REQUIRED.
3/4" F.R.T PLYWOOD
5/8" GYPSUM WALL BOARD, PAINT
3-5/8" METAL FRAMING, 16" O.C.
7/8" FURRING HAT CHANNEL,
HORIZONTAL, 2' O.C.
6" METAL RIM JOIST ON CLIP ANGLE,
FASTEN DIRECTLY TO MASONRY TOP
COURSE
2X SILL PLATE
ANCHOR BOLT, 2' O.C.
BATT NOISE INSULATE BETWEEN STUDS
5/8" GYPSUM CEILING
WALL TO DECK
FOUNDATION LINE FOUNDATION LINE
*HEIGHT= 1'-0" ABOVE
FINISH CEILING, UNLESS
NOTED OTHERWISE
*HEIGHT= 1'-0" ABOVE
FINISH CEILING, UNLESS
NOTED OTHERWISE
*HEIGHT= 1'-0" ABOVE
FINISH CEILING, UNLESS
NOTED OTHERWISE
HEIGHT= VAIRES, 1'-0"
A.F.C. OR TO DECK
HEIGHT= VAIRES, 1'-0"
A.F.C. OR TO DECK
HEIGHT= FULL HEIGHT TO TOP OF PARAPET.
INTERIOR GWB HEIGHT VARIES PER CEILING.
VAPOR RETARDER FULL HEIGHT,
CONTINUOUS
*HEIGHT= 1'-0" ABOVE
FINISH CEILING, UNLESS
NOTED OTHERWISE
*HEIGHT= 1'-0" ABOVE
FINISH CEILING, UNLESS
NOTED OTHERWISE
*HEIGHT= 1'-0" ABOVE
FINISH CEILING, UNLESS
NOTED OTHERWISE
*HEIGHT= 1'-0" ABOVE
FINISH CEILING, UNLESS
NOTED OTHERWISE
HEIGHT= FULL HEIGHT TO TOP OF PARAPET.
INTERIOR LINER TO DECK OR 1'-0" A.F.C AS
NOTED
HEIGHT= FULL HEIGHT TO TOP OF
PARAPET. INTERIOR TO UNDERSIDE OF
DECK.
HEIGHT= FULL HEIGHT DECK
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A4.1TYPICAL WALL TYPE DETAILSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009DATEDESCRIPTION01-11-13ISSUED FOR BID01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT06-11-13ISSUED FOR CONSTRUCTION REVISON08-20-13ISSUED FOR CONSTRUCTION REVISIONREVISION: ADDED NOTES FOR HEIGHTS AND FOUNDATION
LOCATION FOR EACH WALL WHERE APPLICABLE
T.O.F SLAB
150' - 0"
T.O. FRAMING
174' - 3"
L
RAFTER BEYOND
PURLINS
EAVE STRUT
PORTAL FRAME COLUMN
WIND BEAM
ACT CEILING
MEMBRANE ROOFING OVER
5" RIGID INSULATION OVER 1 1/2" B DECK
PARAPET WITH METAL CAP
TO MATCH PANELS BELOW
PORTAL FRAME
GWB & FURROUT FRAMING
TO 1'-0" ABOVE CELING
STOREFRONT GLASS
CEILING, ALIGH WITH
EXTERIOR MULLION
HYUNDAI
ELEMENT BY
OTHERS
6" METAL STUD FRAMING
6" BATT INSULATION
BETWEEN STUDS
1/2" DENS GLASS. AIR
BARRIER, SEAL ALL JOINTS
RIGID INSULATION, MOISTURE
BARRIER, SEAL ALL JOINTS
ALUMINUM COMPOSITE PANEL
RAINSCREEN SYSTEM
1/2" REVEAL JOINTS
GYPSUM, POLYISO INSULATION & PLYWOOD
TO UNDERSIDE OF BLOCKING
9"TOP EAVE STRUT
STUD FRAMING CLIP TO
CECO STRUCTURE
1/4" / 12"
VAPOR RETARDER, TAPE
AND SEAL ALL JOINTS
T.O.F SLAB
150' - 0"
T.O. FRAMING
174' - 3"
L
A5.1
3
Sim
A5.1
5
A5.1
1 24' - 3"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"1' - 5 1/2" T.O. STEEL1/4" / 12"
CLIP TO CECO FRAMING
16' - 0"VAPOR RETARDER, TAPE
AND SEAL ALL JOINTS
T.O. FRAMING
174' - 3"
L
HYUNDAI BOX
ELEMENT BEYOND
METAL STUD FRAMING,
CLIP TO COLUMN AS
REQUIRED TO ABOVE
CEILING
GWB OVER FRAMING,
BOX OUT COLUMN TO
ABOVE CEILING
WIND BEAM
CECO COLUMN
CECO RAFTER
CECO PURLINS
METAL B DECK
RIGID ROOF INSULATION
ROOFING MEMBRANE
METAL PARAPET CAP, FURNISH
METAL BY ACM INSTALLER, FAB &
INSTALL BY ROOFER
CECO EAVE STRUT
1/4" / 12"
6
A2.1
VAPOR RETARDER, TAPE
AND SEAL ALL JOINTS
T.O. FRAMING
174' - 3"
L
HYUNDAI BOX RAINSCREEN
ACM PANELS
(3) 2XBLOCKING
STUD FRAMING TO TOP STUD
PROVIDE BLOCKING WITHIN
WALL AS REQUIRED
MEMBRANE FLASHING
OVER CAP BY ROOFER
.050 ALUM. THRU WALL
FLASHING UP 8" MIN.
BEHIND BOX ELEMENT
PANEL BY ROOFER
A5.1
4
FURROUT SOFFIT W/ GWB
COLUMN BEYOND
RAFTER
BRACKING BACK TO
PURLINS AS REQUIRED
WIND BEAM CL @ 16'-6" AFF.
ACT CEILING
FIXTURE AS
SCHEDULED
ROOFING MEMBRANE ,
INSULATION, B DECK
FIRE RETARDANT PLYWOOD
BY CARPENTER
BOX HEADER
WALL FRAMING BRACING
BACK TO CECO
STRUCTURE, PROVIDE
REACTIONS
12'-0 1/4", SEE ELEVATIONS1/4" / 12"9" T.O. EAVE STRUT5' - 0"2' - 4 5/8"
2' - 2"
2' - 0"
ACM PANEL
BLUESKIN VAPOR PERMIABLE
SELF ADHERED MEMBRANE
5/8" PLYWOOD
ACM CAP
3x3 14 GA. ANGLE @ TOP
OF EACH TUBE STEEL
TUBE STEEL BY CECO
3 5/8" METAL STUD
FRAMING
WIND BEAM CL @ 21'-6" AFF.
2"
5/8"
3 5/8"
1' - 4 1/8"3 5/8"9"
2' - 6 7/8"
VAPOR RETARDER, TAPE
AND SEAL ALL JOINTS
L
MULLIONS AS
REQUIRED, MAX
GLASS PANEL
GWB
BEYOND GLASS PANEL
GLASS PANEL TRANSOME
AUTO SLIDING DOORS
GWB SOFFIT, RETURN TO
SLIDING DOOR MULLION OVER
METAL CEILING JOISTS
DOOR ANGLE TRIM, ACM BASE FLASHING
3 5/8" STUD FRAMING, 16" O.C. TO 1' ABOVE
CEILING. BRACE TO FRONT STUD
FRAMING AS REQUIRED.
BASE TO MATCH STOREFRONT
STOREFRONT BASE MULLION
3 5/8" STUD BRACE BACK TO WALL
8" BOX HEADER OVER DOOR
2x WOOD BLOCKING NAILER, PERIMETER OF DOOR
SPRINKLER HEAD, COORDINATE W/ F.P.
RECESSED FIXTURE BEYOND, SEE RCP
ACT CEILING
5/8" GWB TO 1'-0" ABOVE CEILING
VAPOR RETARDER, INSIDE FACE OF STUD
6" STUD FRAMING, BATT INSULATION
1/2" DENSGLASS SHEATHING, TAPED JOINTS
2" EXTRUDED RIGID INSULATION/ MOISTURE BARRIER
ACM PANEL
A5.2
2
A5.2
1
METAL JOIST TO CECO COLUMNS BOTH SIDES,
COORDINATE WITH HVAC DIFFUSER3' - 1 1/4"1/2"6' - 1 1/4"1/2"2' - 11 1/4"1/2"1' - 9 1/8"10' - 2 5/8"1/4" / 12"9" T.O. EAVE STRUTHVAC DIFFUSERS, INTO SOFFIT
HYUNDAI GATEWAY
ELEMENT BY AGI 9' - 10"12' - 5 1/2"7'-0" MIN. CLEAR
VAPOR RETARDER, INSIDE FACE OF STUD
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A4.2WALL SECTIONSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
3/4" = 1'-0"2 SECTION THRU PORTAL FRAME
3/4" = 1'-0"1 FRONT WALL THRU CURTAINWALL 3/4" = 1'-0"3 SECTION THRU FRONT @ FURROUT
3/4" = 1'-0"5 SECTION THRU BOX ELEMENT
3/4" = 1'-0"4 SECTION THRU VESTIBULE DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON
T.O.F SLAB
150' - 0"
1
TYP. WIND BEAM FOR
WALL ATTACHMENT
16'-0" TO CENTER
6" 20 GA. METAL STUDS
@ 16" O.C. W/ 6" BATTS
MEMBRANE ROOFING (OVER
PARAPET TO FACE OF LOWER
BLOCKING)
CECO ROOF PURLINS
PURLINS W/ CECO EDGE
ANGLE 8 1/2" BACK FROM
FACE OF FDN
ALUMINUM COMPOSITE
MATERIAL (ACM) PANELS
(DRY SEAL SYSTEM)
1/2" DENSGLASS, TAPE ALL
JOINTS TO PROVIDE
CONTINUOUS AIR BARRIER
5/8" PLYWOOD
RAFTER
5/8" GWB
CONC. SLAB, SEE STRUCTURAL
ACOUSTICAL CEILING
-SEE ROOM FIN.
SCHEDULE
METAL FURRING TO WRAP
COLUMNS, TO WINDOW
MULLIONS
METAL PARAPET CAP
TO MATCH ACM PANELS
FAB & INSTALL BY ROOFING CONTR.
FURNISH BY ACM CONTR.
CECO COLUMN TO
BELOW SLAB. SEE
STRUCTURAL.
RIGID INSULATION, MOISTURE
BARRIER, TAPE JOINTS
1 1/2" POLYISO INSULATION
2x WOOD BLOCKING
5" RIGID INSULATION OVER B DECK
STUD FRAMING ATTACH TO
PURLIN ANGLE
STUD FRAMING ATTACH
TO WIND BEAM
GRADE, 3" BELOW
TOP OF SLAB, VERIFY
WITH SITE GRADES
ANGLE CLIP TO ATTACH
STUD WALL TO CECO
FRAMING
ANGLE CLIP (SLIP) TO WIND BEAM
16' - 6" CL OF WIND BEAMVAPOR RETARDER TO INSIDE FACE
OF STUD FRAMING, TAPE AND
SEAL ALL JOINTS
T.O.F SLAB
150' - 0"
T.O. FRAMING
174' - 3"
1
ACM METAL PANEL
1/2" DENSGLASS
EXTRUDED RIGID INSULATION
LINE OF ACM BEYOND, SEE
JAMB FLASHING DETAIL
6" 18 GA. METAL STUDS
@ 16" O.C. W/ 6" BATTS
5/8" GWB BEYOND, RETURN TO
CURTAINWALL MULLION.
ACOUSTIC CEILING
-SEE ROOM FIN. SCHEDULE
3 5/8" 20 GA. METAL
STUDS @ 16" O.C.
W/ 5/8" GWB, PAINT
CLIPS TO WIND BEAM
CECO WIND BEAM
PERIMETER SEALANT BY
PAINTER, TAPE OFF
PERIMETER TO PROVIDE
1/4" BEAD.
A5.1
3
Sim
A5.1
1
A5.2
5
CECO RAFTER
CECO PURLINS W/ ANGLE
CLIP TO STUD FRAMING
METAL B DECK, ROOF
INSULATION, MEMBRANE (UP
PARAPET OVER BLOCKING)
OVER CECO PURLINS
METAL PARAPET CAP OVER BLOCKING
VIF
CURTAINWALL ROUGH OPENING15' - 0"VAPOR RETARDER, INSIDE
FACE OF STUD FRAMING, TAPE
AND SEAL ALL JOINTS
COLUMN FURROUT
BEYOND
T.O. FRAMING
174' - 3"
7
1-1/2" RIGID POLYISO INSULATION
5/8" PLYWOOD
WOOD BLOCKING
METAL PARAPET CAP BY
ROOFING CONTRACTOR,
MATCH METAL PANELS
CECO EXTERIOR PANEL
CECO HORIZONTAL GIRTS
CECO 'DOG EAR'
FRAMING AT COLUMNS
TO SUPPORT PARAPET
CECO ANGLE (RA3-1)
CECO RAFTER
SLAB ON GRADE. ( SEE
FOUNDATION PLANS)
PANEL BASE TRIM
PSK FACED INSULATION
REFER TO STRUCTURAL
DRAWINGS FOR
FOUNDATION WALLS AND
FOOTING SIZES, (TYPICAL)
MEMBRANE ROOFING OVER
PARAPET CAP
PURLINS METAL B DECK
CECO INSULATED PANEL TO
UNDERSIDE OF ROOF DECK ANGLE
ACT CEILING, SEE
SCHEDULE
CMU, SCORED, PAINTED,
SEE SPEC.
CECO CHANNEL
1/2" DENSGLASS
RIGID POLYISO INSULATION
FACED BATT
INSULATION
CECO INSULATED PANEL TO
FLOOR
T.O.F SLAB
150' - 0"
T.O. FRAMING
174' - 3"
A
TOP CMU4' - 0"8 1/2" GIRT WALL
WITH 4" PSK
INSULATION, R-13
8" SINGLE SCORED, PAINTED
CMU BLOCK PER SPEC. W/
REINFORCING
MEMBRANE ROOF, 5"
RIGID INSULATION
OVER B DECK
RAFTER BEYOND
ACT CEILING
CECO COLUMN
BEYOND
A5.2
6
GUTTER TO DOWNSPOUT BY
ROOFING CONTRACTOR
BLOCKING BY ROOFER
CECO STRUTS AT COLUMN
CECO PURLINS
CECO BASE TRIM
CECO INSULATED
METAL PANEL, R-15,
FULL HEIGHT
CECO BYPASS GIRTS
SEE STRUCTRUAL FOR
FOUNDATION AND SLAB
DETAILS
CECO BYPASS GIRTS
CECO EXTERIOR WALL
PANEL
PARAPET WALL BEYOND
PARAPET CAP BEYOND
PARAPET END CAP
ALUM. END WALL CAP TO
MATCH METAL WALL PANEL
MEMBRANE WALL, LAP MEMBRANE
OVER ALUM. END CAP
T.O.F SLAB
150' - 0"
T.O. FRAMING
174' - 3"
1
A5.2
4
A5.2
3
1/2" DENSGLASS
GWB RETURN TO STOREFRONT
METAL STUD FRAMING
W/ BATT INSULATION
5/8" GWB, WRAP TO MULLION
VAPOR BARRIER
BASE
FLOORING
ACM PANEL
STOREFRONT
INSULATED HEADER, TYPICAL
2X WOOD BLOCKING
GWB TO ABOVE CEILING
1/2" PLYWOOD
1 1/2" RIGID POLYISO INSULATION
1/2" DENSGLASS
(1) 2x 12 WOOD BLOCKING
(2) 2x 8 WOOD BLOCKING, RIP 1 TO 6"
STUD TOP TRACK
ALUM. PARAPET CAP
ACM PANEL
RIGID EXTRUDED
INSULATION
1/2" DENSGLASS
BATT INSULATION,
FILL CAVITY, TO
UNDERSIDE
BLOCKING
CECO PURLIN
CECO BEAM
CECO ANGLE, END
OF B DECK
METAL B DECK
CLIP TO BEAM AS REQUIRED
CENTER MULLION (3) WINDOWS,
SEE ELEVATION
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A4.3WALL SECTIONSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
3/4" = 1'-0"1 SIDE WALL @ ACM
3/4" = 1'-0"2 SIDE WALL AT ACM & CURTAINWALL
3/4" = 1'-0"3 SIDEWALL AT CECO PANEL & CMU
3/4" = 1'-0"4 SECTION @ REAR WALL
3/4" = 1'-0"5 SECTION @ SIDE WALL STOREFRONT DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT06-11-13ISSUED FOR CONSTRUCTION REVISON
2' - 4"
L2 COUNTER TOP
L2 COUNTER TOP11 3/4"
3 1/4"
1 1/4"MAX.3' - 0"6"OPEN
L1 VERTICAL
DIVIDER AT SHELVES3 1/2"2 1/2"L2 COUNTER TOP
ADJUSTABLE
SHELVING,
LAMINATED- L2
ADP CASH DRAWER
(FURNISHED BY OWNER)
4.3" H X 15.25" D
3' - 6"3' - 0"GROMMET
F
TOE KICK BASEL1- INSTALLED W/
GRAIN VERTICAL
L2- HORIZONTAL
GRAIN LINES
L2 COUNTERTOP
2 1/2"4 1/2"2 1/2"1' - 10 1/2"4"1
A4.4
2
A4.4
STOREFRONT
WINDOW BEYOND
PAINT FRAMES, TYPICAL,
PAINT OR STAIN DOORS,
TYPICAL. SEE SCHEDULE
MAX.3' - 0"3 1/2"2 1/2"3' - 6"5' - 9"
T.O.F SLAB
150' - 0"
E
SHUTTER DOOR HOOD
SHUTTER DOOR JAMB TRACK
CECO C GIRT
S.S. CLAD
COUNTERTOP
LAMINATED
ADJUSTABLE
SHELVES
3/4" LAMINATE. CLAD
FRONT PANEL
6"
BREAK METAL TRIM AROUND PERIMETER ,
TO MATCH METAL PANEL
3/4" PLYWOOD BLOCKING,
PAINT TO MATCH PANEL
LINER PANEL ABOVE
CECO HORIZONTAL GIRT
ALL EXPOSED
SURFACES TO BE
LAMINATED
3' - 6"4' - 4"COUNTER BEYOND
T.O.F SLAB
150' - 0"
STAINLESS STEEL TECH COUNTER
LAMINATE CABINTET
BELOW W ADJUSTABLE
SHELVES
8' - 0"3' - 6"T.O.F SLAB
150' - 0"
4
A4.4
5' - 3"2' - 0"3' - 6"LAMINATE CABINET W/
ADJUSTABLE SHELVES
6' - 0"
SHUTTER
STAINLESS STEEL
COUNTER
T.O.F SLAB
150' - 0"
H I
LAMINATE COUNTER
& FRONT BAND
L2
L1
L2
2 1/2"4 1/2"2 1/2"L2
3' - 6"1' - 2"
PAINT GWB
TILE BASECARPET
BASE2 1/4"4"
GWB WRAP SOFFIT
HEADER
METAL STUD FRAME
WALL
BLOCKING
2 3/4"
BLOCKING
NEW WINDOW
4' - 2"3' - 0"7' - 2"DESKS AND FILING
CABINETS BY OTHERS
I
7' - 2"1' - 10"2' - 10"2' - 6"2' - 6"2' - 6"4"1 1/4"2"4"LAMINATE COUNTER
& BACKSPLASH- L2
LAMINATE- L1
LOWER CABINETS
LAMINATE- L1
UPPER CABINETS
(2) DUPLEX OUTLETS
w/ DATA
LAMINATE L1-
CROWN MOLDING
SOFFIT
TOE KICK
3 1/2"OPERABLE DRAWERS W/
BRUSHED PULLS
L-1 LAMINATE
ADJUSTABLE SHELVING
TYP. ALL CABINETS
T.O.F SLAB
150' - 0"
I
3/4"
1' - 8 1/4"
L1 LAMINATE PRIVACY SKIRT
L2 LAMINATE COUNTER
TOP & FACE
1' - 4"1 1/2"4"2"
L1 LAMINATE SUPPORT
LEGS
COUNTER TOP DATA AND POWER
OUTLET, INTALLED BY ELECTRICAL
CONTRACTOR, COORDINATE
GROMET LOCATION
CHAMFER EDGE W 1/2" RADIUS
6 5
3' - 6"2' - 0 1/2"2' - 9 5/8"2' - 9 5/8"2' - 9 5/8"2' - 9 5/8"2' - 9 5/8"2' - 9 5/8"1' - 4"9
A4.4
T.O.F SLAB
150' - 0"
HG
1' - 0 7/8"
2' - 0 1/8"
8"
2' - 0 3/4"2' - 0 3/4"
8"2' - 0 1/8"2' - 8 7/8"3' - 5 1/2"3' - 9 5/8"2' - 4 3/4"T.O.F SLAB
150' - 0"
F
1
A4.4
2
A4.4
ADP CASH DRAWER
18.81"Wx 15.5"D x 4.3" H
1' - 6 7/8"
(3) ADJUSTABLE SHELVES,
L2
L1 VERTICAL SUPPORT2 1/2"3' - 6"4' - 1"3' - 0"SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A4.4INTERIOR WALL SECTIONS & ELEVATIONSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
3/4" = 1'-0"1 SECTION @ RETAIL PARTS COUNTER
3/4" = 1'-0"2 SECTION @ RETAIL PARTS COUNTER (2)
3/4" = 1'-0"3 ELEVATION @ RETAIL PARTS COUNTER
3/4" = 1'-0"4 TECH COUNTER SECTION 1/2" = 1'-0"6 TECH COUNTER ELEVATION 2
1/2" = 1'-0"5 TECH COUNTER ELEVATION 1 DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION10-08-13ISSUED FOR CONSTRUCTION REVISION10-24-13TV WALL ELEVATION, BUSINESS OFFICE11-06-13MILLWORK CLARIFICATIONS 3/4" = 1'-0"7 SALES COUNTER
1/2" = 1'-0"8 HALL A- MILLWORK
1/2" = 1'-0"9 COMPUTER COUNTER SECTION
1/2" = 1'-0"10 COMPUTER COUNTER ELEVATION
1/4" = 1'-0"11 TV WALL ELEVATION
3/4" = 1'-0"12 RETAIL PARTS COUNTER ELEV- REAR
0.050 ALUMINUM FLASHING, MATCH FRAME,
(1-1/4"x1-1/4") CAULK AND SEAL PERIMETER.
PROVIDE PUNCHED WEEPS @ 1'-0" O.C.
BY CURTAINWALL INSTALLER. FLEXIBLE
TAPE FLASHING TO RIGID INSULATION
ACM PANEL, EXTRUSION, SPLINE, BASE TRIM TO
MATCH PANEL, FLASH OVER FASTNERS TO
INSULATION W/ BUTYL TAPE, PER INSULATION
MANUFACTURER REQUIREMENTS
2" RIGID INSULATION. TAPE ALL VERTICAL JOINTS.
TAPE ALL HORIZONTAL JOINTS EXCEPT IMMEDIATELY
ABOVE CURTAINWALL AND BASE OF WALL
CURTAINWALL FRAME
INTERIOR GWB RETURN, PAINT. SEALANT
TO FRAME
INTERIOR STUD
FRAMING
6" METAL STUD FRAMING,
HEADER AS REQUIRED.
INSULATION BETWEEN STUDS,
SPRAY FOAM FILL STUD CAVITIES
VAPOR BARRIER, INSIDE FACE OF STUDS
2x10 BLOCKING (RIPPED TO 8 1/2", VIF)
1/2" DENSGLASS, TAPE ALL JOINTS
7/8"
6" WIDE BUTYL FLASHING TAPE ADHERED TO
DENSGLASS, WRAP OVER BLOCKING TO FACE
OF CURTAINWALL FLASHING ANGLE, HOLD
SHORT OF CORNER OF ANGLE BY 1/4" TO 1/2".FACE FND = FACE OFINSULATIONACM PANEL (4mm) COLOR AS SELECTED
0.050 ALUM. FLASHING TO MATCH
CURTAINWALL (1-1/4"x 1-1/4") W/
PUNCHED WEEPS @ 1'-0" O.C.
3/8" CAULK JOINT W/ BACKER ROD
KAWNEER 1600 CURTAINWALL
(2 1/2" x 7 1/2" FRAME, 1" GLAZING)
2" EXTRUDED INSULATION, R-10 MIN.
CONTINUOUS INSULATION W/ TAPED JOINTS
(CONTINUSOUS MOISTURE BARRIER)
ACM BASE TRIM AND EXTRUSION
5/8" GWB RETURN @ CURTAINWALL PERIMETER.
CORNER BEAD, TAPE, SAND, PAINT, TYP.
BEAD CAULK TO GLAZING FRAME BY PAINTER.
5/8" GWB, TO 12" ABOVE
CEILING TILE, PAINT
3-5/8" METAL STUD W/
BASE TRACK, FASTEN TO
WALL STUDS. TERMINATE
AT WINDBEAM ABOVE, MIN.
12" A.F.C.
CEILING AS SCHEDULED
BATT INSULATION R-19 MIN.
BETWEEN STUDS
POLY 6 MIL. VAPOR RETARDER OVER
METAL STUDS TO PERIMETER OF
WINDOW, CONTINUOUS, TAPE ALL JOINTS
FURROUT WALL
BEYOND
FURROUT
WALL BEYOND
3-5/8" METAL STUD HORIZONAL
SUPPLEMENTAL FRAMING
CECO WIND BEAM
METAL STUD FRAMING @ 16" O.C.
GALVANIZED METAL STRAPPING, CONTINUOUS
AS REQUIRED AT METAL PANEL JOINTS,
FASTENERS MIN. 1" THROUGH STUDS
SEE DETAIL #2 THIS SHEET FOR FLASHING TAPE
METAL FRAMED BOX HEADER AS REQUIRED, W/
BATT INSULATION IN CAVITY
1/2" DENSGLASS SHEATHING, TAPED JOINTS TO
PROVIDE CONTINUOUS AIR BARRIER
2x10 WOOD BLOCKING, CONTINUOUS AT WINDOW
HEAD (RIPPED AS REQUIRED)
ACM JAMB FLASHING
7/8"
T.O.F SLAB
150' - 0"
GRADE OR WALK, SLOPE AWAY FROM
BUILDING
CONCRETE FOUNDATION WALL
CAULK & BACKER ROD AT BASE BY
CURTAINWALL INSTALLER, INTERIOR &
EXTERIOR, TYP.
MULLION BASE, SEE CURTAINWALL &
WINDOW SCHEDULE
CURTAINWALL GLAZING 7 1/2"
8"
1 1/2"1 1/2"0.050 ALUMINUM BASE TRIM AT CURTAINWALL,
UPTURN ENDS LAP BEHIND VERTICAL JAMB
ANGLE FLASHING. JAMB FLASHING TAB TO
DEPTH OF CHAMFER. UPTURN BACK SIDE OF
FLASHING.
7/8"
3/8"
2"
CHAMFER INSULATION/ SLAB TO
FOUNDATION WALL
THERMAL BREAK, UNDER STUD,
CURTAINWALL, PERIMETER OF WALL
FACE OF FOUNDATION
L
ALUM. FLASHING, OVER DENSGLASS, TAPE W/ SELF
SEALING FLASHING, SEE DETAIL #2 THIS SHEET
CURTAINWALL SYSTEM
HYUNDAI BOX ELEMENT PANEL
1/2" DENSGLASS W/ TAPED
JOINTS
RIGID INSULATION, TAPED
5/8" PLYWOOD
GWB, PAINTED
GWB CORNER BEAD, MIN 2"
RETURN, SPACKLE, PAINT.
6" MTL. STUD FRAMING
BATT INSULATION
BETWEEN STUDS
BOX HEADER AS REQUIRED,
SUPPORT FOR OVER
CURTAINWALL AND TO SUPPORT
BOX ELEMENT, INSULATE
VAPOR BARRIER
2x10 BLOCKING (RIPPED TO SIZE)
3 5/8"
3 5/8" METAL STUD FRAMING,
FASTEN TO HEADER
BLUESKIN
FACE OF FOUNDATION= FACE OF INSULATION
T.O. FRAMING
174' - 3"
L
ACM EXTRUSION, BACKER ROD &
CAULK JOINT
2" RIGID EXTRUDED INSULATION (R-10)
W/ TAPED JOINTS TO PROVIDE
MOISTURE BARRIER
0.050 ALUMINUM PARAPET CAP,
PAINTED, OVER CONTINUOUS
CLEAT, FASTENERS PER SMACNA,
BACK UP PLATE AT JOINTS, 10'
O.C.
RING NAIL @ MEMBRANE TO
BLOCKING, OVERLAP TAPE AT
EXTRUDED INSULATION EDGE
METAL B DECK, RIGID
INSULATION, ROOFING
MEMBRANE OVER PURLINS
EAVE STRUT (BY CECO)
METAL STUD FRAMING, BATT
INSULATION BETWEEN STUDS,
TIE INTO CECO STRUCTURAL
WIND BEAM & STRUTS
METAL STRAPPING AT PANEL JOINTS,
FASTEN TO STUD FRAMING
1/2" DENSGLASS SHEATHING,
TAPE AND SEAL ALL JOINTS TO
PROVIDE AIR BARRIER
VAPOR BARRIER, CONTINUOUS
1 1/2" RIGID POLYISO TO
UNDERSIDE OF BLOCKING
1/2" PLYWOOD TO UNDERSIDE BLOCKING
MEMBRANE OVER PARAPET CAP BLOCKING
ALUMINUM PARAPET CAP
FASTENER W/ NEOPRENE GASKET
METAL STUD CLIP ATTACH TO
CECO EAVE STRUT
FACE OF FOUNDATION = FACE OF INSULATION
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A5.1EXTERIOR SECTION DETAILSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
3" = 1'-0"2 CURTAIN WALL JAMB DETAIL
3" = 1'-0"3 CURTAINWALL HEAD DETAIL
3" = 1'-0"1 CURTAINWALL SILL DETAIL
3" = 1'-0"4 WINDOW HEAD @ BOX ELEMENT DETAIL
3" = 1'-0"5 FRONT WALL PARAPET CAP DETAIL DATEDESCRIPTION01-11-13ISSUED FOR BID01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON
L
1 1/4"x 3-1/4", 0.050 ALUMINUM HEAD TRIM
TO MATCH DOOR FRAME.
FLASH W/ SELF SEALING FLASHING. 8" UP WALL.
ACM PANEL, EXTRUSION AND BASE
SPLINE WITH WEEPS.
BACKER ROD AND CAULK JOINT
1/2" DENSGLASS
SLIDING DOOR TRANSOME HEAD
2X WOOD BLOCKING
0.050 MIN. ALUMINUM HEAD
FLASHING TO MATCH
DOOR (2x3/4")
GYPSUM BOARD SOFFIT
METAL FRAMING
METAL STRAPPING BY
ACM INSTALLER
2" RIGID INSULATION, TAPE
ALL JOINTS FOR CONTINUOUS
MOISTURE BARRIER, EXCEPT
AT DOOR HEAD
1/2" DENSGLASS, TAPE AND
SEAL ALL JOINTS
ACM PANEL EDGE
BEYOND
ACM JAMB FLASHING
BEYOND, ALIGN WITH
HEAD FLASHING
6" BUTYL TAPE
FLASHING OVER DOOR
TRIM, TO FACE OF
DENSGLASS
HVAC
DIFFUSER
IN SOFFIT
COLUMN LINE =
FACE OF FOUNDATION=
FACE OF INSULATION
A
GUTTER TO DOWNSPOUTS BY ROOFER, PER
SMACNA. FLASH AS REQUIRED BY ROOFING
MANUFACTURER TO MAINTAIN WARRANTY.
CECO MSP METAL PANEL, SEE
ELEVATION,
TO UNDERSIDE OF METAL ROOF DECK W/
4x3 ALUMINUM ANGLE CLOSURE
(3) 2X6WOOD BLOCKING & AT ROOF EDGE,
CONTINUOUS, BY ROOFER.
CECO EAVE STRUT &
STRUCTUAL FRAMING
HORIZONTAL CECO ZEE GIRT
MEMBRANE EDGE STRIP IN OVER
DRIP EDGE, LAP INTO GUTTER
MEMBRANE ROOFING & RIGID
INSULATION OVER METAL B DECK, LAP
OVER EDGE TO FACE OF CECO PANEL
1" MIN. 2" MAX., V.I.F.
PSK INSULATION
EAVE STRUT CLIP @ COLUMNS
PSK INSULATION
CECO METAL CLOSURE W/ SPRAY
FOAM INSULATION
CECO INSULATED PANEL (c.i.) R-15
1 1/4"
3 7/8"3/4"5"6"
9" METAL TRIM BY ROOFER, FASTEN TO
BLOCKING ABOVE
ACM PANEL W/ EXTRUSION TRIM TO
MATCH PANEL, WEEP AS REQUIRED
2"x 2" - 0.050 ALUM. ANGLE TRIM, BY
CURTAINWALL CONTRACTOR &
JAMB FLASHING
STOREFRONT SYSTEM GWB RETURN TO FRAME, PAINT,
PROVIDE BEAD OF SILICONE
CAULK AROUND PERIMETER
BOX HEADER, INSULATED
5/8" GWB TO 1' ABOVE CEILING
VAPOR BARRIER, FULL HEIGHT
ACT, SEE RCP
2x BLOCKING @ WINDOW PERIMETER
ACM JAMB FLASHING/ TRIM
BUTYL FLASHING TAPE OVER STRAPPING,
FASTENER & EXTRUSION
TAPE AND SEAL ALL JOINTS
EXCEPT AT WINDOW HEADS
EXTRUDED RIGID INSULATION
BUTYL TAPE OVER WINDOW HEAD
ANGLE FLASHING TO FACE OF
DENSGLASS, TYPICAL
METAL STUD FRAMING W BATT
INSULATION
ACM JAMB TRIM & PANEL
BEYOND
2"x 2" ANGLE, 0.050 ALUM. SILL
FLASHING
STOREFRONT SYSTEM, SHIM AS
REQUIRED
5/8" GWB, PAINTED
1/2" DENS GLASS, TAPED JOINTS
VAPOR BARRIER, FACE OF
INSULATION TO UNDER
STOREFRONT
RIGID INSULATION, TAPED JOINTS
ALUMINUM COMPOSITE PANEL
RAINSCREEN SYSTEM
PT WOOD BLOCKING,
STOREFRONT PERIMETER
5/8" GWB RETURN, PAINTED, CALUK
BEAD PERIMETER OF WINDOW
6" METAL STUD FRAMING W/ BATT
INSULATION
WATERPROOFING MEMBRANE,
WRAP WINDOW TO OVER RIGID
INSULATION
METAL STRAPPING BY ACM
INSTALLER
T.O.F SLAB
150' - 0"
L
ALUM. DOOR JAMB
FLASHING BEYOND
8" THRESHOLD,
AAB COMPLIANT
SLIDING DOOR
ACM PANEL RETURN,
JAMB TERMINATION
SLIDING DOOR
ALUMINUM JAMB TRIM
CONCRETE
FOUNDATION WALL
R-10 RIGID INSULATION,
TAPER TO 1/2" AT TOP
OF SLAB, MIN. 2'
VERTICAL
CONCRETE SLAB
WALK OFF MATS
CAULK THRESHOLD OF
DOOR TO CONCRETE
T.O. FRAMING
174' - 3"
1
FACE FASTENER W/ NEOPRENE
GASKET, 12" O.C., MAX. FIELD HEM
AS REQUIRED. COORDINATE WITH
MANUFACTURE REQUIREMENTS
PARAPET CAP, THICKNESS PER
SMACNA, MIN 0.040, SEE ELEVATION
FOR COLOR. MATERIAL PROVIDED BY
ACM CONTRACTOR, FAB & INSTALL BY
ROOFER
TPO MEMBRANE, ADHERED. OVER
PARAPET TO FACE OF LOW BLOCKING
WELDED SPLICE, FASTENER TO
DECK BELOW, 3" SEAM PLATE
PER MANUFACTURER
5" RIGID ROOF INSULATION OVER
METAL B DECK
ANGLE CLIP BY STUD WALL
CONTRACTOR, TO ATTACH
METAL STUD WALL TO CECO
FRAMING
CECO PURLINS
ACM PANELS
ACM CAULK JOINT
PERIMETER OF
PANEL
RIGID INSULATION,
TAPE JOINTS TO
PROVIDE MOISTURE
BARRIER
DENSGLASS, TAPED
JOINTS FOR AIR
BARRIER
WOOD BLOCKING
(1) 2x12
(2)2x8 (ONE RIPPED TO 6")
METAL STUD FRAMING
BATT INSULATION
1/2" DENSGLASS, TAPED SEAMS
TO ROOF DECK
B6
1/2" PLYWOOD OVER 1-1/2" POLYISO
INSULATION BY ROOFER
2"
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A5.2EXTERIOR SECTION DETAILS (2)PROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
6" = 1'-0"2 DETAILTHRU VESTIBULE DOOR HEAD
3" = 1'-0"6 GUTTER & REAR EDGE DETAIL
3" = 1'-0"4 STOREFRONT HEAD DETAIL
3" = 1'-0"3 STOREFRONT SILL @ CMU DETAIL
6" = 1'-0"1 DETAIL THRU VESTIBULE DOOR SILL
3" = 1'-0"5 ROOF PARAPET SIDE WALL DETAIL DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON
SEE SCHEDULE
SEE SCHEDULEEXTERIOR WINDOW TYPE A 7' - 2" R.O.DOOR TYPE 1
3' - 0"7' - 0"2"10"3 1/2"
5' - 4"7' - 2" R.O.VARIES 3' - 3"
DOOR TYPE 2
3' - 0"7' - 0"4 1/2"3' - 4"
2"2"
DOOR TYPE 610"7' - 2" R.O.3' - 0"7' - 0"3' - 4"
DOOR TYPE 3 7' - 2" R.O.3' - 0"7' - 0"3' - 4"
DOOR TYPE 4A 7' - 2" R.O.6' - 0"7' - 0"6' - 4"
DOOR TYPE 5
'FS''FX''FS''FX'4 1/8"1' - 0 5/8"7 1/2"7' - 0"11' - 4"9' - 0 1/4"CECO PASS DOOR CECO PAIR PASS DOOR
FIRE RATED
METAL DOOR ON
HOLLOW METAL FRAME
INTERIOR STOREFRONT DOOREXTERIOR STOREFRONT DOORSLIDER W/ FOLD IN/ BREAK OUT & TRANSOME
SEE SCHEDULE
SEE SCHEDULETYPE B- INTERIOR SLIDER WINDOW
2"
HOLLOW METAL FRAME
DAISY TOP MOUNTED TRACK, 1/4"
GLAZING
1/2 GLASS OR
NARROW LITE
WHERE NOTED,
SEE SCHEDULE
TRANSOME
ELECTRICAL
7' - 2" R.O.OR 3'-6"
3' - 0"7' - 0"OR 3'-10"
3' - 4"
DOOR TYPE 4
SOLID CORE WOOD DOOR
ON HOLLOW METAL FRAME
*NOTE: VERIFY ROUGH OPENING WITH SPECIFIC FRAME TYPES AS SHOWN ON SUBMITTALS
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A6.1DOOR & WINDOW SCHEDULESPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
NEW DOOR SCHEDULE
MARK TO ROOM TYPE
SIZE SIZE SIZE
DESCRIPTION FRAME MATERIAL
FIRE
RATING INSULATION
Hardware Hardware Hardware Hardware
GLAZING COMMENTSWIDTHHEIGHTTHICKNESSHARDWARE SET HANDLE HINGES SPECIAL HARDWARE
1 VESTIBULE 1 11' - 0"7' - 8"0' - 1 3/4"BI-PARTING/ SLIDING DOOR ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN/ BREAKOUT/ KEYED SENSOR, BOTH SIDES SLIDER SENSOR BOTH SIDES FULL THERMAL BREAK, WEATHERSEAL, AAB
THRESHOLD
1A VESTIBULE 1 10' - 11"7' - 8"0' - 1 3/4"BI-PARTING/ SLIDING DOOR ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN/ BREAKOUT SENSOR, BOTH SIDES SLIDER SENSOR, BOTH SIDES FULL THERMAL BREAK, WEATHERSEAL, AAB
THRESHOLD
2A SHOWROOM 3 3' - 0"7' - 0"0' - 1 3/4"SINGLE SWINGING ALUMINUM NONE
2B SHOWROOM 3 4' - 6"7' - 0"0' - 1 3/4"SINGLE SWINGING ALUMINUM ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN, PROP OPEN PUSH/PULL 1 1/2 PAIR CLOSER FULL
2C SHOWROOM 3 3' - 6"7' - 0"0' - 1 3/4"SINGLE SWINGING ALUMINUM ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN, PROP OPEN PUSH/PULL 1 1/2 PAIR CLOSER FULL
3 SHOWROOM 3 3' - 0"7' - 0"0' - 1 3/4"SINGLE SWINGING ALUMINUM ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN PUSH/PULL 1 1/2 PAIR CLOSER FULL
5 SHOWROOM 3 3' - 0"7' - 0"0' - 1 3/4"SINGLE SWINGING ALUMINUM ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN PUSH/PULL 1 1/2 PAIR CLOSER FULL
6 INTERNET 3 3' - 0"7' - 0"0' - 1 3/4"SINGLE SWINGING ALUMINUM ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN PUSH/PULL 1 1/2 PAIR CLOSER FULL
7 F & I 3 3' - 0"7' - 0"0' - 1 3/4"SINGLE SWINGING ALUMINUM ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN PUSH/PULL 1 1/2 PAIR CLOSER FULL
9 WOMEN'S 4 3' - 0"7' - 0"0' - 1 3/4"SOLID CORE BIRCH SINGLE HOLLOW METAL, WRAP AROUND NONE NO NA PUSH/PULL 1 1/2 PAIR CLOSER NONE
10 MEN'S 4 3' - 0"7' - 0"0' - 1 3/4"SOLID CORE BIRCH SINGLE HOLLOW METAL, WRAP AROUND NONE NO NA PUSH/PULL 1 1/2 PAIR CLOSER NONE
11 OFFICE 4 3' - 0"7' - 0"0' - 1 3/4"SOLID CORE BIRCH SINGLE HOLLOW METAL, WRAP AROUND NONE NO LOCKSET LEVER 1 1/2 PAIR CLOSER NONE
12 OFFICE 4 3' - 0"7' - 0"0' - 1 3/4"SOLID CORE BIRCH SINGLE HOLLOW METAL, WRAP AROUND NONE NO LOCKSET LEVER 1 1/2 PAIR CLOSER NONE
13a BUSINESS OFFICE 4 3' - 0"7' - 0"0' - 1 3/4"SOLID CORE BIRCH SINGLE HOLLOW METAL, WRAP AROUND NONE NO LOCKSET LEVER 1 1/2 PAIR CLOSER NONE
13b BUSINESS OFFICE 4 3' - 6"7' - 0"0' - 1 3/4"SOLID CORE BIRCH DOOR HOLLOW METAL, WRAP AROUND NONE NO W561 CLASSROOM LOCKSET LEVER 1 1/2 PAIR NONE NONE
13c BUSINESS OFFICE 4 3' - 6"7' - 0"0' - 1 3/4"SOLID CORE BIRCH DOOR HOLLOW METAL, WRAP AROUND NONE NO W561 CLASSROOM LOCKSET LEVER 1 1/2 PAIR NONE NONE
15 SERVICE DRIVE 1 9' - 10"7' - 8"0' - 1 3/4"BI-PARTING/ SLIDING DOOR ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN NONE SLIDER SENSOR, BOTH SIDES FULL
17A SERVICE DRIVE 3 3' - 0"7' - 0"0' - 1 3/4"SINGLE SWINGING ALUMINUM ALUM. STOREFRONT NONE NO MORTISE LOCKSET & THUMB TURN PUSH/PULL 1 1/2 PAIR CLOSER FULL
18 LOCKER 4A 3' - 0"7' - 0"0' - 1 3/4"METAL DOOR HOLLOW METAL, WRAP AROUND NONE NO NA PUSH/PULL 1 1/2 PAIR CLOSER NONE
19A BREAK ROOM 4 3' - 0"7' - 0"0' - 1 3/4"SOLID CORE BIRCH SINGLE HOLLOW METAL, WRAP AROUND NONE NO NA PUSH/PULL 1 1/2 PAIR CLOSER HALF GLASS
20A BREAK ROOM 4A 3' - 0"7' - 0"0' - 1 3/4"METAL DOOR HOLLOW METAL, WRAP AROUND NONE NO NA PUSH/PULL 1 1/2 PAIR CLOSER HALF GLASS
21A RETAIL PARTS 4 3' - 0"7' - 0"0' - 1 3/4"SOLID CORE BIRCH SINGLE HOLLOW METAL, WRAP AROUND NONE NO LOCKSET LEVER 1 1/2 PAIR CLOSER NARROW LITE
21B PARTS 5 3' - 6"7' - 0"0' - 1 3/4"CECO EXTERIOR PAIR DOOR CECO METAL FRAME NONE NO LOCKSET LEVER 1 1/2 PAIR CLOSER NONE
21C PARTS 5 3' - 0"7' - 0"0' - 1 3/4"CECO EXTERIOR SINGLE PASS HOLLOW METAL, WRAP AROUND NONE YES LOCKSET LEVER 1 1/2 PAIR CLOSER NONE
21D PARTS 8' - 0"8' - 0"0' - 1 1/2"OVERHEAD COILING DOOR METAL NONE YES KEYPAD PULL NONE ELEC. OPENER NONE
22A SPRINKLER 5 3' - 0"7' - 0"0' - 1 3/4"CECO EXTERIOR SINGLE PASS CECO METAL FRAME NONE YES LOCKSET LEVER 1 1/2 PAIR CLOSER NONE
22B SERVICE 4A 3' - 6"7' - 0"0' - 1 3/4"METAL DOOR HOLLOW METAL, WRAP AROUND NONE NO LOCKSET LEVER 1 1/2 PAIR CLOSER NONE
23 TANK RM 6 6' - 0"7' - 0"0' - 2"CECO EXTERIOR PAIR DOOR CECO METAL FRAME NONE YES LOCKSET LEVER 1 1/2 PAIR CLOSER NONE
24 ELECT.4A 3' - 0"7' - 0"0' - 1 3/4"METAL DOOR WELDED STEEL FRAME W/ ANCHORS, 4" HEADER NONE NO LOCKSET LEVER 1 1/2 PAIR CLOSER NONE SWEEP
25A SERVICE DRIVE 2 3' - 0"7' - 0"0' - 1 3/4"SINGLE SWINGING ALUMINUM ALUMINUM, CLEAR ANODIZED NONE NO MORTISE LOCKSET & THUMB TURN PUSH/PULL 1 1/2 PAIR CLOSER FULL
25B SERVICE DRIVE 11' - 0"12' - 0"0' - 1 1/2"RYTEC FAST OPENING ALUMINUM, CLEAR ANODIZED NONE NO FAST ACTING OPERATION NONE NONE ELEC. OPENER FULL INDUCTION LOOP INSIDE & OUTSIDE
26A SERVICE 5 3' - 0"7' - 0"0' - 1 3/4"CECO EXTERIOR SINGLE PASS ALUMINUM, CLEAR ANODIZED NONE YES LOCKSET, KEYPAD LEVER 1 1/2 PAIR CLOSER NONE
26B SERVICE 12' - 0"12' - 0"0' - 1 1/2"RYTEC FAST OPENING ALUMINUM, CLEAR ANODIZED NONE NO FAST ACTING OPERATION NONE NONE ELEC. OPENER FULL INDUCTION LOOP INSIDE & OUTSIDE
26C SERVICE 12' - 0"12' - 0"0' - 1 1/2"RYTEC FAST OPENING ALUMINUM, CLEAR ANODIZED NONE NO FAST ACTING OPERATION NONE NONE ELEC. OPENER FULL INDUCTION LOOP INSIDE & OUTSIDE
26D SERVICE 5 3' - 0"7' - 0"0' - 1 3/4"CECO EXTERIOR SINGLE PASS CECO METAL FRAME NONE YES LOCKSET LEVER 1 1/2 PAIR CLOSER NONE
28 TEL/ DATA 4A 3' - 0"7' - 0"0' - 1 3/4"METAL DOOR HOLLOW METAL, WRAP AROUND NONE NO LOCKSET LEVER 1 1/2 PAIR NONE NONE
29 COMPRESSOR 4A 3' - 0"7' - 0"0' - 1 3/4"METAL DOOR HOLLOW METAL, WRAP AROUND NONE NO LATCH LEVER 1 1/2 PAIR CLOSER NONE
NEW WINDOW SCHEDULE
MARK TYPE DESCRIPTION HEIGHT WIDTH
SILL
HEIGHT GLASS TYPE
GLASS
COLOR COMMENTS
X01 A ALUMINUM STOREFRONT 6' - 0"5' - 0"2' - 11 3/4"1" INSULATED CLEAR 451 T
X02 A ALUMINUM STOREFRONT 6' - 0"5' - 0"2' - 11 3/4"1" INSULATED CLEAR 451 T
X03 A ALUMINUM STOREFRONT 6' - 0"5' - 0"2' - 11 3/4"1" INSULATED CLEAR 451 T
X04 A ALUMINUM STOREFRONT 3' - 0"7' - 0"2' - 11"1" INSULATED CLEAR 451 T
X05 A ALUMINUM STOREFRONT 3' - 0"7' - 0"2' - 11"1" INSULATED CLEAR 451 T
X06 A ALUMINUM STOREFRONT 3' - 0"7' - 0"2' - 11"1" INSULATED CLEAR 451 T
X07 A ALUMINUM STOREFRONT 3' - 0"7' - 0"2' - 11"1" INSULATED CLEAR 451 T
X08 A ALUMINUM STOREFRONT 3' - 0"7' - 0"2' - 11"1" INSULATED CLEAR 451 T
X09 A ALUMINUM STOREFRONT 3' - 0"7' - 0"2' - 11"1" INSULATED CLEAR 451 T
X10 B ALUMINUM FRAME SLIDER 4' - 0"5' - 0"3' - 0"1/4", TEMPERED CLEAR SLIDER W/ SHELF
X11 A FIXED STOREFRONT 4' - 0"3' - 0"3' - 4"1" INSULATED CLEAR 451 T
X12 A FIXED STOREFRONT 4' - 0"6' - 0"3' - 9 3/4"1" INSULATED CLEAR 451 T
NOTE: SEE SPECIFICATION FOR DOOR & FRAME FINISHES DATEDESCRIPTION02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION08-01-13ISSUED FOR CONSTRUCTION REVISION09-05-13ISSUED FOR CONSTRUCTION REVISION09-11-13ISSUED FOR CONSTRUCTION REVISION09-17-13ISSUED FOR CONSTRUCTION REVISION10-08-13ISSUED FOR CONSTRUCTION REVISION*NOTE: SCHEDULE DOES NOT INCLUDE CURTAINWALL SYSTEM SIZES
REF.ROOM FINISHES LEGEND
FLOOR FINISHES
WALL BASE
WALL FINISHES
FT1 = FLOOR TILE- 12"x12" - DALTILE- DIAMONTE COLORBODY PORCELAIN- GRIGIO, P021 UNPOLISHED. (SHOWROOM FILED)
FT2 = FLOOR TILE- 6"x24" - DALTILE- PZAZZ- BLACK DRAMA, P266 (CUSTOMER PATHWAY, LOUNGE)
FT3 = FLOOR TILE -12"x12" - DALTILE-DIAMONTE COLORBODY- ARDESIA P027. (RESTROOMS, BREAKROOM, LOCKER ROOM)
FT4 = FLOOR TILE -24"X24" - DALTILE-DIAMONTE COLORBODY PORCELAIN- GRIGIO, P021 POLISHED (SHOWROOM PERIMETER)
CT1 = CARPET - MANUFACTURER: SHAW. STYLE: CULTURE 50912, #12485- HARBOURING DESIRE (OFFICE AREAS)
HTS = RESINOUS FLOORING (HTS) HIGH TRAFFIC SYSTEM FLOOR COATING, OVER CONCRETE SLAB.
VF1 = VINYL FLOOR TILE - MANNINGTON, 102 "STONE GRAY" 12"x12"x1/8" OR EQUAL.
WM = WALK OFF MAT- MATS, INC OR J&J ENTRANCE MAT TILES.
G1 = GROUT- LATICRETE "#22 MIDNIGHT BLACK" (OR EQUAL) @ FT1, FT2, FT4 & BASE FOR THESE TILES
G2 = GROUT- LATICRETE "#45 RAVEN" @ FT3 AND BASE FOR FT3
MARBLE SADDLE AT: MENS, WOMENS AND BREAK ROOM DOORS
TB1 = COVE BASE- DAL TILE, MATCH ADJACENT FIELD TILE IN AREA.
CT = COVE BASE- CARPET BASE TO MATCH CARPET
VB1 = COVE BASE- BURKE MERCER, 660 SLATE
PT1 = PAINT- SHERWIN WILLIAMS- REPROSE GRAY- SW7015- EGGSHELL
PT2 = PAINT- SHERWIN WILLIAMS- RESPITE SW6514- SEMI GLOSS
PT3 = PAINT- SHERWIN WILLIAMS- PEPPERCORN - SW7674- SEMI GLOSS
PT4 = PAINT- SHERWIN WILLIAMS- REPROSE GRAY- SW7015- SEMI GLOSS (WATER BASED EPOXY- PRIME + 2 COAT)
PT5 = PAINT- SHERWIN WILLIAMS- CEILING BRIGHT WHITE SW7007- SEMI GLOSS (EGGSHELL ON CEILINGS)
WT1 = WALL TILE- FIELD - CASALGRANDE PADANA- METALWOOD, PIOMBO,12”H x 24” W,
w/ G3 = GROUT - LATICRETE #89 SMOKE GRAY
WT2 = WALL TILE ACCENT BAND- ANATOLIA BLISS - ICELAND- RANDOM STRIP LINEAR MOSAIC, 6" THICK BAND
w/ G4 = GROUT- HYDROMENT REFLEX WHITE
WT3= WALL TILE ACCENT BAND- ANATOLIA BLISS GLASS & STONE - MIDNIGHT - RANDOM STRIP LINEAR MOSAIC, 6" THICK BAND
w/ G4 = GROUT- HYDROMENT REFLEX WHITE
WT4 = WALL TILE ACCENT BAND- ANATOLIA BLISS - WATERFALL- 5/8"x 5/8" MOSAIC, 6" THICK BAND.
w/ G4 = GROUT- HYDROMENT REFLEX WHITE
ANODIZED ALUMINUM CAP: CM2151 OR CM2152, ANODIZED ALUMINUM. (WT2, WT3 WT4)
FRP = FIBERGLASS REINFORCED PANEL- MARLITE - P100 WHITE
SIG = CECO SIGNATURE SERIES PAINT
CEILING MATERIAL/ FINISHES
ACT 1 = 2 x 2, ACOUSTICAL CEILING TILE- SEE SPEC
ACT 2 = 2 x 4, SECOND LOOK (2x2) W/ CLIMAPLUS- SEE SPEC
ACT 3 = 2 x 4, CEILING TILE W/ CLIMAPLUS- SEE SPEC
COUNTER & CABINET FINISHES
SOL1 = CORIAN SOLID SURFACE- ANTHRACITE
L1 = FORMICA LAMINATE - 756-58 NATURAL MAPLE- MATTE FINISH
L2 = FORMICA LAMINATE- 3505-58 STORM SOLIDZ - MATTE FINISH
SS = STAINLESS STEEL, 304 SERIES, BRUSHED 16 GA.
SOLID CORE WOOD FINISH DOORS
WHITE MAPLE - TOAST 28-95
WT 1
PT 5
WT-2 :MENS AND WOMENS RESTROOM
WT-3 :LOCKER ROOM
BASE: MATCH
FLOOR TILE
GROUT
JOINT- 1/8"
GROUT- #45 RAVEN
ANODIZED ALUMINUM CAP (PROFILE CM2151 OR CM2152)4"4' - 0"6"4' - 10"WT-4 GLASS MOSAIC (BREAKROOM)
4
4
6
6 7
3
3
2
2
5
5
J
K K
LL
II
1
1
VESTIBULE
1
SHOWROOM
2
WALK OFF MAT
WALK OFF
MAT
WALK OFF
MAT
WALK OFF
MATFT1
FT1
FT4 PERIMETER
FT4 PERIMETER
FT4 PERIMETERFT2
2' - 0"4
6
6
5
5
F
H
I
G
RETAIL
PARTS COUNTER
MEN'S
10
WOMEN'S
9
LOUNGE
8
RETAIL PARTS
16
SERVICE
WRITE-UP
15
COFFEE
COUNTER
CT1
FT2
SHOWROOM
2
MARBLE SADDLE
AT DOOR
MARBLE SADDLE
AT DOOR
FT3
FT3
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A7.1ROOM FINISH SCHEDULE & DETAILSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
ROOM FINISH SCHEDULE
NO.ROOM NAME FLOORING BASE
WALL MATERIAL WALL FINISH CEILINGS
CommentsNORTHSOUTHEASTWESTNORTH (VW)SOUTH (COLVEST)EAST (REAR)WEST (FRONT)MATERIAL FINISH HEIGHT
1 VESTIBULE WM WM GLASS GLASS GLASS GLASS NA NA NA NA GLASS CLEAR/ ANODIZED FRAME VIF
2 SHOWROOM FT1 / FT2/ FT4 / WM TB1 GWB GWB GWB GWB PT1 PT1 PT1 PT1 ACT 1 LIGHTLY TEXTURE 16'-0"
3 F & I CT1 CT GWB GWB GWB/ GLASS GWB/
GLASS
PT1 PT1 PT2 PT1 ACT1 LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
4 SALES MGR CT1 CT GWB GWB GWB GWB PT1 PT1 PT2 PT1 ACT1 LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
5 OFFICE CT1 CT GWB GWB GWB/ GLASS GWB/
GLASS
PT1 PT1 PT2 PT1 ACT1 LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
6 INTERNET CT1 CT GWB GWB GWB/ GLASS GWB/
GLASS
PT1 PT1 PT2 PT1 ACT1 LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
7 F & I CT1 CT GWB GWB GWB/ GLASS GWB/
GLASS
PT1 PT1 PT2 PT1 ACT1 LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
8 LOUNGE FT2/ CT1 TB1 GWB GWB GWB/ GLASS GWB PT1 PT1 PT2 PT1 ACT 1 LIGHTLY TEXTURE 10'-0"BATT INSULATION ABV. CLNG
9 WOMEN'S FT3 (G2)TB1 GWB (MR)GWB (MR)GWB (MR)GWB (MR)WT1 w/ WT2 ACCENT/ PT5 ABV WT1 w/ WT2 ACCENT/ PT5 ABV WT1 w/ WT2 ACCENT/ PT5 ABV WT1 w/ WT2 ACCENT/ PT5 ABV ACT 1 W/ INSUL. ABOVE LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
10 MEN'S FT3 (G2)TB1 GWB (MR)GWB (MR)GWB (MR)GWB (MR)WT1 w/ WT2 ACCENT/ PT5 ABV WT1 w/ WT2 ACCENT/ PT5 ABV WT1 w/ WT2 ACCENT/ PT5 ABV WT1 w/ WT2 ACCENT/ PT5 ABV ACT 1 W/ INSUL. ABOVE LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
11 OFFICE CT1 CT GWB GWB GWB GWB PT1 PT1 PT2 PT1 ACT 1 W/ INSUL. ABOVE LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
12 OFFICE CT1 CT GWB GWB GWB GWB PT1 PT1 PT2 PT1 ACT 1 W/ INSUL. ABOVE LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
13 BUSINESS OFFICE CT1 CT GWB GWB GWB GWB PT1 PT1 PT2 PT1 ACT 1 W/ INSUL. ABOVE LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
14 HALL A FT1 (G1)TB1 GWB GWB GWB GWB PT1 PT1 PT2 PT1 ACT 1 W/ INSUL. ABOVE LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
15 SERVICE WRITE-UP FT1 (G1)TB1 GWB GWB GWB GWB PT2 PT1 PT2 PT1 ACT 1 W/ INSUL. ABOVE LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
16 RETAIL PARTS FT2 (G1)TB1 GWB GWB GWB GWB PT1 PT1 PT2 PT1 ACT1 LIGHTLY TEXTURE 10'-0"
17 SERVICE MGR CT1 CT GWB GWB GWB GWB PT1 PT1 PT2 PT1 ACT 1 W/ INSUL. ABOVE LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
18 LOCKER FT3 (G2)TB1 GWB/ TILE GWB/ TILE GWB/ TILE GWB/ TILE WT1 w/ WT3 ACCENT/ PT5 ABV WT1 w/ WT3 ACCENT/ PT5 ABV WT1 w/ WT3 ACCENT/ PT5 ABV WT1 w/ WT3 ACCENT/ PT5 ABV ACT1 LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
19 HALL B HTS VB1 GWB GWB GWB GWB FRP FRP NA FRP GWB PT5 9'-0"
20 BREAK ROOM FT3 (G2)TB1 GWB GWB GWB GWB WT1 w/ WT4 ACCENT/ PT5 ABV WT1 w/ WT4 ACCENT/ PT5 ABV WT1 w/ WT4 ACCENT/ PT5 ABV WT1 w/ WT4 ACCENT/ PT5 ABV ACT 1 W/ INSUL. ABOVE LIGHTLY TEXTURE 9'-0"BATT INSULATION ABV. CLNG
21 PARTS SEALED CONC.J TRIM LINER LINER LINER LINER SIG SIG SIG SIG OPEN STRUCTURE NA VARIES GRAY CECO PRIMER & PAINTED
ROOF DECK
22 SPRINKLER SEALED CONC.VINYL CMU/ GWB (MR)GWB (MR)GWB (MR)GWB (MR)GRAY CMU/ FRP FRP FRP FRP GYPSUM BOARD PT5 8'-0"
23 TANK RM SEALED CONC.VB1 INSUL PANEL CMU CMU GWB SIG GRAY CMU GRAY CMU PT5 GYPSUM BOARD PT5 8'-0"
24 ELECT.SEALED CONC.VB1 INSUL. PANEL CMU CMU CMU SIG PT5 PT5 PT5 GYPSUM BOARD PT5 8'-0"
25 SERVICE DRIVE HTS/ WM VB1 GWB INSUL. PANEL LINER (SOFFIT)GWB PT1 SIG SIG FRP/ PT1 ACT 2 ILLUSION, LIGHT TEXTURE, CLIMASEAL 15'-10"PAINT EXPOSED COLUMNS
26 SERVICE HTS J TRIM CMU/ INSUL. PANEL INSUL. PANEL INSUL. PANEL LINER PT5, PT3 ACCENT/ SIG SIG SIG SIG ACT 3 LIGHT TEXTURE, CLIMASEAL 15'-0"PAINT EXPOSED COLUMNS
27 PARTS RACKING SEALED CONC.NA INSUL. PANEL LINER LINER LINER SIG FACTORY FACTORY FACTORY NONE NA OPEN GRAY CECO PRIMER & PAINTED
ROOF DECK
28 TEL/ DATA VF1 VB1 INSUL. PANEL GWB GWB GWB SIG PT4 PT4 PT4 NONE NA OPEN GRAY CECO PRIMER & PAINTED
ROOF DECK
29 COMPRESSOR PLYWOOD NONE INSUL. PANEL GWB LINER GWB SIG PT4 SIG PT4 NONE NA OPEN GRAY CECO PRIMER & PAINTED
ROOF DECK
1/2" = 1'-0"1 WALL TILE LAYOUT
1/8" = 1'-0"3 PARTIAL FINISHES PLAN
1/8" = 1'-0"2 PARTIAL FINISHES PLAN- LOUNGE DATEDESCRIPTION01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION08-01-13ISSUED FOR CONSTRUCTION REVISION08-20-13ISSUED FOR CONSTRUCTION REVISION10-08-13ISSUED FOR CONSTRUCTION REVISION10-22-13ISSUED FOR CONSTRUCTION REVISION
U3 5 0AW ILK INSZ URNM DLN O.SER.M W W T: 140° F MW W P: 175 PSI A CO M PANYPA SO RO B LES C A ., U.S.A .REDU C ED PRESSU RE B A C K FLOW PREVEN TERU3 5 0AW ILK INSZ URNM DLN O.SER.M W W T: 140° F MW W P: 175 PSI A CO M PANYPA SO RO B LES C A ., U.S.A .REDU C ED PRESSU RE B A C K FLOW PREVEN TER
6 7325
A A
B B
C C
DD
EE
FF
HH
J
K K
LL
II
G
1
A3.1
2
A3.1
3
A3.1
1
CURTAIN BY OTHERSCURTAIN BY OTHERS1
1 1
11
1 1
1
1
1 1
1
1
1 1
1
1
1
1
1
1
1
1
1
1111
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1 11 1 11
1
1
1 1
1
1
11
1
HYUNDAI CLOUD ELEMENT (FABRIC) , BY
OTHERS, HUNG AT 9' AFF. PROVIDE LIGHING
ABOVE AS REQUIRED. PROVIDE ELECTRICAL
HARDWIRED TO CLOUD, 110V. FOR LIGHTING
(6 LED ON TRACK) BY DCI, UNDER CLOUD.
STRUCTURAL CABLES (6) CARRYING 12 LBS
PER CABLE, WHERE HUNG THROUGH ACT
FROM STRUCTURE ABOVE.
RISER FOR TEL DATA
FROM UNDER SLAB
OPEN TO ABOVEOPEN TO ABOVEOPEN TO ABOVEGLASS CEILING OVER
VESTIBULE BELOW. SEE
BLOWN-UP PLAN.
PENDANT HUNG FROM STRUCTURE ABOVE,
WATERPROOF FLUORESCENT LIGHTING,
ANGLE TOWARD CENTER OF WASH BAY.
COORDINATE WITH LOCATION OF CURTAINS
AND WASH BAY EQUIPMENT
TEL/ DATA
28
COMPRESSOR
29
A.F.F.
ACT 3
15' - 0"
A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
9' - 0"A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 2
15' - 10"
A.F.F.
ACT 1
11' - 6"
A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
9' - 0"A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
16' - 0"
4
A3.1
1
A4.3
2
A4.3
3
A4.3
4
A4.3
4 4
4 4
1
333
3 3
3333
3 3
4
4 4
4 4
4
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2 2 2 2 2 2 2 2
2
2
2
2
2
2
2
2
2
2
2 2
2 2 2
2 2 2
2 2 2
2 2 2
2 2
2 2
2 22
2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
FIXTURES ABOVE PARTS
RACKING. PROVIDE WIRE
GUARDS. HUNG FROM
STRUCTURE ABOVE.
COORDINATE WITH
VERTICAL LIFT DOOR
4
4
3
3
3 3
3
3
6
6A
6
6 6
6
6
6
6
6
6
6
6
6
6
6
6
6
5 55
5 5555 5
5 5555 5
LINE OF PARTS
RACKING BELOW
3
A.F.F.
ACT 1
9' - 0"
SOFFIT @ 7'-2"
SOFFIT @ 8'-0"
SOFFIT @ 7'-2"
SOFFIT @ 12'-0" AFF
5
A4.3
2
A4.2 1
A4.2
3
A4.2
5
A4.2
AB PROVIDE ANGLE IRON FRAMING
FROM STRUCTURE ABV. TO CEILING
BELOW FOR (3) OVERHEAD WANDS.
GENERAL NOTE: AB TO PROVIDE ANGLE
IRON FRAMING FROM STRUCTURE ABOVE
TO CEILING BELOW FOR HANGING OF HOSE
REELS. D.S. TO PROVIDE ATTACHMENT TO
ANGLE.
AB PROVIDE ANGLE IRON
(STRUCTURE ABOVE TO CEILING
BELOW FOR MOUNTING OF
INSPECTION CAMERA PENDANT
LADDER TO ROOFWALL BELOW
WALL BELOW
A8.1
2
4
A4.2
HOSE REEL HOSE REELHOSE REEL
HOSE REEL HOSE REEL
HOSE REEL
4 4 4
444
4
4
3
4
4
4
4
4 4
4
4
4
44
4 4
4 4
2
2
2
2
2
2
A.F.F.
ACT 1
9' - 0"
A.F.F.
ACT 1
9' - 0"A.F.F.
ACT 1
9' - 0"
2 2
2
A.F.F.
ACT 4
15' - 0"
LINE OF CEILING TILE CHANGE
LINE OF CEILING TILE CHANGE
6
6
32
D
E
F
3
A3.1
1
4
A3.1
LIGHTING, TO
UNDERSIDE OF
RACKING
6
6
6A
6
6
6
6
6
6
6 6
A.F.F.
GWB on Mtl. Stud
7' - 11 1/2"
LINE OF PARTS
RACKING (BY
OWNER)6 6 6
A.F.F.
GWB on Mtl. Stud
7' - 11 1/2"
A.F.F.
GWB on Mtl. Stud
7' - 11 1/2"
LIGHTING FIXTURE SCHEDULE
TYPE DESCRIPTION LAMPS MOUNTING
1 2' X 4' 4 LAMP RECESSED FLUORESCENT HIGHBAY LAY-IN.
ELECTRONIC BALLAST WITH T5 LAMPS.
(4) 54W T5 RECESSED CEILING
2 8" LED HIGH LUMEN DOWNLIGHT WITH SEMI-DIFFUSED ALZAK REFLCTOR LED RECESSED CEILING
4 2' X 4' 4 LAMP RECESSED FLUORESCENT DIRECT/INDIRECT LAY-IN.
ELECTRONIC BALLAST WITH T5 LAMPS.
(3) 28W T5 RECESSED CEILING
6 8' INDUSTRIAL WITH T8 LAMPS W/ WIRE GUARDS (4) 28W T5 SURFACE/ SUSPENDED
5 8' VAPOR TIGHT INDUSTRIAL WITH T5 LAMPS (4) 54W T5 SURFACE
3 6" LED DOWNLIGHT WITH SEMI-DIFUSED ALZAK REFLECTOR LED RECESSED CEILING
2HBG454T5GUNVL4841
PART NUMBER
SGE8LED-70-41K-MD-V/AR8454SG
SGE6LED30W41KMDE1SG
DIG-S24-328T5S-WPR-EB3-UNV-LP41K
92-8-454T5H-A-WET/2-SSMB/VBY/60-EB4-UV
80-8-428T5S-EB2/2-UNV-LP41K
7 6" LOW PROFILE LED , RECESSED , MAX DEPTH 4 1/2"LED RECESSED--
NOTES:
ALL LIGHTING LISTED BY DESIGN LIGHTING. CONTACT BRAD WAMPLER @ 877.635.0923.
CONFIRM MINIMUM FOOTCANDLES AS REQUIRED PER CODE.
43
L
2
A4.2
4
A4.2
GLASS GLASS
GWB SOFFIT
SPRINKLER
HVAC DIFFUSER
IN SOFFIT
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A8.1REFLECTED CEILING PLANPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
1/8" = 1'-0"1 REFLECTED CEILING PLAN
1/8" = 1'-0"3 LOWER RACKING LIGHTING
CEILING TYPE SCHEDULE
TYPE TYPE COMMENTS DESCRIPTION
ACT 1 2x2 TILE & 9/16" GRID LIGHT TEXTURE, REVEAL EDGE
ACT 2 2x2 TILE & 9/16" GRID CLIMA-PLUS TILE, LIGHT TEXTURE, REVEAL EDGE
ACT 3 2x4 TILE & 15/16" GRID CLIMA-PLUS TILE, LIGHT TEXTURE, SQUARE EDGE
ACT 4 2x4 VINYL FACED GYP TILE & 15/16" GRID GYPSUM TILE, WHITE VINYL FACED
GWB on Mtl. Stud GWB OVER FRAMING 1 HR RATED ASSEMBLY
OPEN TO ABOVE PAINTED STRUCTURE PAINT EXPOSED STEEL(UNDERSIDE OF DECK PAINTED BY CECO)
Storefront Vestibule
Ceiling
GWB OVER FRAMING 1 HR RATED ASSEMBLY
1/4" = 1'-0"2 VESTIBULE REFLECTED CEILING PLAN
GENERAL NOTE: ALL LIGHTING FIXTURES ARE
SHOWN FOR DESIGN INTENT ONLY. FINAL
QUANTITIES & LAYOUT TO BE DETERMINED BY
DESIGN BUILD ELECTRICAL CONTRACTOR.DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION06-11-13ISSUED FOR CONSTRUCTION REVISON08-20-13ISSUED FOR CONSTRUCTION REVISION10-08-13ISSUED FOR CONSTRUCTION REVISION11-15-13CEILING CLARIFICATIONS
EF
1
EF
2
RTU
1
RTU
2
RTU
4
RTU
6
EF
3
RTU
3
RTU
5
DS
1 1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"A2.14
A2.1
A2.1
A2.1
2
3
1
4 6 7325
A
B
C
D
E
F
H
J
K
L
I
G
1
A3.1
1
A3.1
2
A3.1
3
A3.1
1
4
A3.1
1
A4.3
2
A4.3
3
A4.3
4
A4.3
GUTTER TO DOWNSPOUTS. SIZE
PER SMACNA REQUIREMENTS.
MATCH METAL PANEL. 4"X3" MIN.
COORDINATE WITH SITE ROOF
DRAIN LOCATIONS.
ROOF HATCH, PROVIDE ROOFING
MEMBRANE FLASHING AROUND CURB W/
CRICKET
MEMBRANE FLASHING AND ALUM.
THROUGH WALL FLASHING AT 'BOX
ELEMENT'
LADDER W/ LADDER UP POST.
GUARD RAIL AROUND PERIMETER OF
HATCH, ROOFER FLASH POSTS (4)
PARAPET CAP TO MATCH METAL
PANEL BELOW. FURNISH, FAB
INSTALL BY ROOFER
METAL PARAPET CAP TO
MATCH METAL COMPOSITE
PANEL BELOW, FURNISH BY
ACM CONTRACTOR. FAB
AND INSTALL BY ROOFER
METAL PARAPET CAP TO
MATCH METAL COMPOSITE
PANEL BELOW, FURNISH BY
ACM CONTRACTOR. FAB
AND INSTALL BY ROOFER
METAL PARAPET CAP TO
MATCH METAL COMPOSITE
PANEL BELOW, FURNISH BY
ACM CONTRACTOR. FAB
AND INSTALL BY ROOFER
PARAPET CAP TO MATCH METAL
PANEL BELOW, FURNISH FAB
INSTALL BY ROOFER
FASCIA BY ROOFER,
MATCH PANEL BELOW. 7"
MIN. FACE W/ CONT.
CLEAT.
END CAP TO
MATCH PANELS
ROOFER PROVIDE FLASHING FOR ALL
MECHANICAL ROOFTOP UNITS AND
VENTS, LOCATIONS TO BE DETERMINED 1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"5
A4.3
2
A4.2
1
A4.23
A4.2
5
A4.2
HYUNDAI BOX
ELEMENT
3/4" JOG IN FINISH FACE OF
PANELS. PROVIDE END CAP AS
REQUIRED.
ROOFER PROVIDE FLASHING FOR ALL
MECHANICAL ROOFTOP UNITS AND
VENTS, LOCATIONS TO BE DETERMINED
END CAP TO
MATCH PANELS
CRICKET (TYP. ALL UNITS)
SK-2
1
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
A9.1ROOF PLANPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
3/32" = 1'-0"1 ROOF PLAN
GENERAL NOTE:
1) HVAC UNITS FOR REFERENCE ONLY. SEE HVAC PLANS.
2) FINAL PLACEMENT OF HVAC UNITS TO BE VERIFIED UPON SUBMISSION
OF METAL BUILDING DRAWINGS
3) ALL HVAC UNITS TO HAVE CRICKETS AT HIGH ROOF SIDE OF UNIT AS
REQUIRED TO MAINTAIN 1/2" PER 1'-0".DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT05-01-13ISSUED FOR CONSTRUCTION REVISION08-29-13SKETCH ISSUED
4
4
6
6
7
7
3
3
2
2
5
5
A A
B B
C C
DD
EE
FF
HH
J
K K
LL
I
G
1
S2.2
2
S2.2
3
S2.2
3
S2.2
6
S2.2
5
S2.2
6
S2.2
5
S2.2
6
S2.2
5
S2.2
1
S2.2
1
S2.2
1
S2.2
5
S2.2
1
S2.2
1
S2.2
4
S2.2
1
1
F5 F5
F6
F5 F5
F5
F4F4F4
F1
F1
F1
F1
F2 F3 F3 F1
F2
F3
F4
F1
F2
F1
F1
F1
F1
F2F3F3F3F3F3F2
F1
F1
F1
F1
F1
7
S2.2
1
S2.2
1
S2.2
6
S2.2
8
S2.2
8
S2.2
8
S2.2
8"X16" FTG 8" BELOW
FIN FLR @ CMU
KICKWALL (TYP.)
TRENCH DRAIN
DNDNDNDNDNDN
DN
DN DNDN
DN
DN
DN+0"+0"
+0"+0"DNDNDN
+0"+0"
+0"
+0"+0"
+0"
+0"
DRAIN GRATE. -1.25"
DRAIN INV. -13.25"
- 1.813"
DRAIN GRATE. -3.63"
DRAIN INVERT. -15.63"
- 2.036"
DRAIN GRATE. -0.69"
DRAIN INVERT. -12.69"
5" THICK CONC. SLAB IN THIS
AREA @ 150'-0"
(SHOWN HATCHED)
6" THICK CONCRETE SLAB
HIGH POINT @ 150'-0"
1' - 4"16' - 8"19' - 0"15' - 4"19' - 0"16' - 8"1' - 4"18' - 4"1' - 4"
OUT TO OUT OF FOUNDATION
109' - 0"18' - 3"12' - 9"6' - 10"10' - 10"8' - 2"17' - 8"19' - 5"22' - 1"23' - 0"15' - 3"14' - 9"OUT TO OUT OF FOUNDATION31' - 0"OUT TO OUT OF FOUNDATION138' - 0"14' - 9"15' - 3"23' - 0"22' - 1"19' - 5"25' - 10"10' - 10"19' - 7"18' - 3"OUT TO OUT OF FOUNDATION169' - 0"OUT TO OUT OF FOUNDATION
89' - 4"19' - 8"
1' - 4"16' - 8"19' - 0"15' - 4"19' - 0"16' - 8"19' - 8"1' - 4"
OUT TO OUT OF FOUNDATION
109' - 0"
F7F7
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
S1.1FOUNDATION PLANPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
STRUCTURAL FOOTING SCHEDULE
Type Mark LENGHT WIDTH THICKNESS
BOTTOM OF FOOTING
ELEVATION REINFORCING
F1 4' - 0"4' - 0"1' - 0"145' - 2"#6 BARS 8" O.C. BOTH WAYS
F2 5' - 0"5' - 0"1' - 0"145' - 2"#6 BARS 8" O.C. BOTH WAYS
F3 6' - 0"6' - 0"1' - 0"145' - 2"(5) #6 BARS 16" O.C. BOTH WAYS
F4 6' - 6"6' - 6"2' - 0"147' - 5"(8) #6 BARS BOTH WAY
F5 7' - 9"7' - 9"2' - 0"147' - 5"(10) #6 BARS, BOTH WAYS
F6 7' - 9"7' - 9"2' - 0"144' - 2"(10) #6 BARS, BOTH WAYS
F7 6' - 0"8' - 6"1' - 0"145' - 2"(8) #6 BARS IN SHORT DIRECTION,
SAME SPACING LONG DIRECTION
NOTE: FLOOR SLAB ELEVATION @ 150'-0"
NOTE: SEE ENLARGED STRUCTURAL PLANS FOR FOOTING DEPTHS AND ANCHOR BOLT LOCATIONS DATEDESCRIPTION01-11-13ISSUED FOR BID01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT04-16-13REVISION 105-01-13ISSUED FOR CONSTRUCTION REVISION
4
4
6
6
7
7
3
3
2
2
5
5
EE
FF
HH
J
K K
L
II
G
1
1
1
S2.2 2
S2.2
6
S2.2
5
S2.2
1
S2.2
1
S2.2
1
S2.2
5
S2.2
1
S2.2
1
S2.2
4
S2.2
F5
F5 F6 F5 F5
F5F4F4F4
F1
F1
F1
F1
F2 F3
F3
F1
F2
F3
F4
F1
F2
F1
F1
F1
1
S2.2
1
S2.2
6
S2.2
DN DNDN
DN
DN
DN+0"+0"+0"+0"
+0"
+0"+0"
+0"
+0"
DRAIN GRATE. -1.25"
DRAIN INV. -13.25"
5" THICK CONC. SLAB IN THIS
AREA
6" THICK CONC. SLAB IN
THIS AREA (HATCHED)
CHAMFER FND WALL AT
CURTAINWALLS, SEE
SECTION
CHAMFER FND WALL AT
CURTAINWALL , SEE SECTION
CHAMFER FND WALL AT
CURTAINWALL, SEE SECTION
EL. @ DOOR NOTCH = 148'-4", SLOPE
TO EXT. SEE O.H. DOOR DETAIL
EL. @ DOOR NOTCH W/ SLOPE =
148'-4", SEE O.H. DOOR DETAIL
5" THICK CONC. SLAB IN THIS
AREA
11 1/2"
11 3/8"
7 1/2"
3' - 4"1' - 7 3/4"0"SAWCUT AT COLUMN LINES
AND MID POINTS BETWEEN
COLUMN LINES, SEE DETAILS,
CONTINUOUS TO EDGE OF
SLAB, TYP. BOTH DIRECTIONS
T.O.FOOTING= 149' - 5"
B.O. FOOTING 147' - 5"
T.O.FOOTING= 149' - 5"
B.O. FOOTING 147' - 5"
T.O.FOOTING= 149' - 5"
B.O. FOOTING 147' - 5"
T.O.FOOTING= 149' - 5"
B.O. FOOTING 147' - 5"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 149' - 5"
B.O. FOOTING 147' - 5"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 149' - 5"
B.O. FOOTING 147' - 5"
T.O.FOOTING= 149' - 5"
B.O. FOOTING 147' - 5"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 144' - 2"T.O.FOOTING= 149' - 5"
B.O. FOOTING 147' - 5"
T.O.FOOTING= 149' - 5"
B.O. FOOTING 147' - 5"
STRIP FOOTING
SAWCUT AT
COLUMNS, TYPICAL
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"3' - 6"5 1/8"1' - 11"8' - 6"3"11' - 0"3"
1' - 1"1' - 4"10 3/4"2' - 0"3' - 0"10' - 0"2' - 4 1/4"1' - 9 1/4"1' - 9 1/4"2' - 4 5/8"
1' - 4"
16' - 8"19' - 0"15' - 4"19' - 0"16' - 8"1' - 4"18' - 4"
1' - 4"19' - 5"25' - 10"10' - 10"19' - 7"18' - 3"OUT TO OUT OF FOUNDATION
89' - 4"
OUT TO OUT OF FOUNDATION
19' - 8"
OUT TO OUT OF FOUNDATION
109' - 0"31' - 0"6' - 10"10' - 10"8' - 2"17' - 8"19' - 5"CHAMFER FND WALL
AT CURTAINWALL, SEE
SECTION
1' - 7 1/2"8 1/2"
2' - 4 1/2"
1' - 7 3/8"
8 5/8"
CHAMFER FND WALL
AT CURTAINWALL,
SEE SECTION
CHAMFER FND WALL AT
CURTAINWALL, SEE SECTION
CHAMFER FND WALL AT
CURTAINWALLS, SEE
SECTION
CHAMFER FND WALL AT
CURTAINWALLS, SEE
SECTION
F7 F7
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
10"
10"
10"
10"
10"
2' - 6"2' - 6"
FACE OF
FOUNDATION
WALL 1' - 4"1' - 6"1' - 6"1' - 6"1' - 6"4' - 3"4' - 3"4' - 3"4' - 3"1' - 0"1' - 2"
1' - 4"
1' - 2"
10"
10"
10"56' - 10"37' - 1"FACE FND. TO FRAMED OPENING68' - 7"1/2" DIA. ANCHOR BOLTS (4)EACH DOOR,
TYP. SEE DETAIL ON S3.1
1/2" DIA. ANCHOR BOLTS (4) EACH
DOOR, TYP. SEE DETAIL S3.13' - 6"1' - 2"2"2 1/2"CECO FRAMING. PROVIDE (2) 1/2" DIA. ANCHOR
BOLTS, 1-1/2" PROJECTION. SEE DETAIL ON
S3.13"ANCHOR BOLTS
8' - 6"8' - 10"9' - 6"9' - 6"7' - 8"7' - 8"9' - 6"9' - 6"9' - 9 3/4"9' - 9 3/4"2' - 9 3/4"1/2" DIA. ANCHOR BOLTS, (4) EACH
DOOR, TYP. SEE DETAIL ON S3.1
NO CHAMFER AT DOOR
NO CHAMFER AT DOOR10 3/4"6' - 9 1/2"8' - 0"2 1/2"2' - 4 1/4"SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
S1.2ENLARGED PARTIAL FOUNDATION PLANPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009 3/16" = 1'-0"1 ENLARGED FOUNDATION PLAN DATEDESCRIPTION01-11-13ISSUED FOR BID01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT04-16-13REVISION 105-01-13ISSUED FOR CONSTRUCTION REVISION
4
4
6
6
7
7
3
3
2
2
5
5
A A
B B
C C
DD
EE
1
1
3
S2.2
3
S2.2
6
S2.2
5
S2.2
6
S2.2
5
S2.2
F1
F1
F1
F2
F3F3F3F3F3
F2
F1
F1
F1
F1
F1
8
S2.2
8
S2.2
8
S2.2
8"X16" FTG 8" BELOW
FIN FLR @ CMU
KICKWALL (TYP.)
TRENCH DRAIN
DNDNDNDNDNDN
DN
DN+0"+0"
+0"+0"DNDNDN
+0"+0"
+0"
- 1.813"
DRAIN GRATE. -3.63"
DRAIN INVERT. -15.63"
- 2.036"
DRAIN GRATE. -0.69"
DRAIN INVERT. -12.69"
6" THICK CONCRETE
SLAB (TYP. UNO.)
COORDINATE FLOOR
EXHAUST PORTS WITH
UNDERGROUND TRENCH
DRAIN PLUMBING
LIFT COLLARS BY LIFT INSTALLER. TYP
AT EACH SERVICE BAY. COORDINATE
LOCATION WITH EQUIPMENT
INSTALLER. PROVIDE HAUNCHED SLAB
AT PERIMETER
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"
COORDINATE FLOOR
EXHAUST PORTS WITH
UNDERGROUND TRENCH
DRAIN PLUMBING
4' - 6 1/2"5 1/8"4' - 9"6' - 6"9' - 0 1/8"12' - 0"3' - 10"1' - 1"1' - 9"3"12' - 0"3"14' - 9"15' - 3"23' - 0"22' - 1"1' - 4"16' - 8"19' - 0"15' - 4"19' - 0"16' - 8"19' - 8"1' - 4"
OUT TO OUT OF FOUNDATION
109' - 0"
2' - 6"
10"
10"
10"10"
10"
10"
2' - 6"
1' - 4"
1' - 2"1' - 2"1' - 8"1' - 8"1' - 8"1' - 8"1' - 8"2' - 6"
10"
1/2" ANCHOR BOLTS (4) TYP.,
1-1/2" PROJECTION.2"
2 1/2"
1/2" ANCHOR BOLTS (4)
TYP., 1-1/2" PROJECTION
2"
2 1/2"2' - 2 1/2"3' - 6"2 1/2"
2"
1/2" ANCHOR BOLTS (4) EACH
DOOR TYP. SEE DTL ON S3.12 1/2"
2"
T.O.FOOTING= 146' - 2"
B.O. FOOTING 145' - 2"3"2 1/2"
2"3"2"2 1/2"3"2"2 1/2"
1/2" ANCHOR BOLTS (4) TYP.
1/2" ANCHOR BOLTS (4) TYP.1' - 2"1/2" ANCHOR BOLTS (4) EACH
DOOR TYP. SEE DTL ON S3.1
NOTCH FND. PROVIDE SLOPE
AT DOOR. SEE SECTION.
DOWNSPOUT/ROOF LEADER (TYP OF 7)
COORDINATE WITH FOOTING
LOCATIONS. SEE SITE DRAWINGS
NOTCH FND. PROVIDE SLOPE
AT DOOR. SEE SECTION.
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
S1.3ENLARGED PARTIAL FOUNDATION PLANPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
3/16" = 1'-0"1 ENLARGED FOUNDATION PLAN (REAR)DATEDESCRIPTION01-11-13ISSUED FOR BID01-23-13ISSUED FOR BID ADDENDUM 102-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT04-16-13REVISION 105-01-13ISSUED FOR CONSTRUCTION REVISION
ASTM A36 MIN.
AB1 3/4" DIA X 24" OAL
3" THREAD
NUT & WASHER
HEADED BOLT
TACK WELD HEAVY
HEX NUT
N.T.S
FDN CONTROL JOINT DETAIL
(TYP. AT EVERY COLUMN LINE)
1 1/2" X 1 1/2" WOOD CANT STRIP
1 1/2" X 1 1/2" WOOD CANT STRIP
A MINIMUMBC
T.O. FTG
BAR SIZE
#4 23" 8"
#5 28" 10"
#6 33" 12"
#7 38" 14"
#8 46" 16"
8"
10"
12"
14"
16"
A B C
L-BAR LENGTH CHART
CONCRETE GENERAL NOTES:
1. ALL WORK TO BE PERFORMED IN ACCORDANCE WITH
THE MASSACHUSETTS STATE BUILDING CODE 8TH
EDITION AND ALL LOCAL REQUIREMENTS.
2. DIMENSIONS AND CONDITIONS SHALL BE VERIFIED
IN FIELD PRIOR TO THE COMMENCEMENT OF WORK.
CONCRETE FOUNDATIONS:
1. ALL CONCRETE SHALL HAVE A DESIGN STRENGTH
OF 3000 PSI AT 28 DAYS, UNLESS OTHERWISE NOTED.
2. REINFORCING RODS SHALL BE ASTM A615, GRADE 60
EXCEPT WHERE FIELD BENDING IS REQUIRED, GRADE 40.
3. ALL CONCRETE SHALL BE MIXED AND PLACED IN
ACCORDANCE WITH THE ACI "BUILDING CODE
REQUIREMENTS FOR REINFORCED CONCRETE",
ACI-318-89 (R92).
4. THE TOP OF FOUNDATION WALLS SHALL BE
TROWELED SQUARE, LEVEL AND SMOOTH.
5. EXPOSED FOUNDATIONS SHALL BE RUBBED SMOOTH
IMMEDIATELY AFTER STRIPPING.
6. CONCRETE CONTRACTOR SHALL INSTALL
CHASES THROUGH THE FOUNDATION WALLS AS
DIRECTED BY THE GENERAL CONTRACTOR.
7. ALL BARS TO HAVE MINIMUM 2" COVERAGE.
8. ALL CONCRETE TO BE POURED WITH A MAXIMUM 4" SLUMP.
9. FOUNDATION WALLS TO HAVE CONTROL JOINTS
AT EVERY COLUMN LINE.
CONCRETE FLOORS:
1. WELDED WIRE MESH, WHERE SPECIFIED,
SHALL BE ASTM A185 AND SHALL BE IN SHEET
FORM.
2. FLOOR SLABS SHALL BE STEEL TROWELED TO A
DENSE, HARD FINISH. CONCRETE FLOORS TO RECEIVE (1)
COAT OF CLEAR SEALER/HARDENER EXCEPT AS NOTED.
3. PROVIDE CONTROL/EXPANSION JOINTS WITH THE SOFF-CUT
METHOD. SOFF-CUT CONTROL JOINTS MUST BE CUT WITHIN
THE FIRST HOUR OR TWO AFTER COMPLETION OF THE FINAL
FINISH. THE DEPTH OF THE JOINT IS TO BE 1/4 OF THE SLAB
THICKNESS.
4. EXTERIOR CONCRETE TO HAVE WOOD FLOAT FINISH.
5. FLOOR SLAB REINFORCING, WHERE SPECIFIED, MUST BE
LOCATED AT OR ABOVE MID DEPTH OF THE FLOOR SLAB.
SHEETS ARE TO BE USED IN ALL APPLICATIONS. WELDED
WIRE MESH TO BE PLACED WITH CHAIRS OR BOLSTERS
ONLY.
6. ALL EXTERIOR WALLS AND ALL INTERIOR COLUMNS
TO BE SEPARATED WITH ISOLATION JOINTS; PRE
FORMED STRIPS OR DIAMONDS POURED SEPARATELY.
7. POURING CONCRETE FLOORS IN A CHECKERBOARD
PATTERN IS NOT APPROVED OR RECOMMENDED BY ACI.
8. SEPARATE POURS MUST HAVE SMOOTH DOWELS
(WRAPPED OR GREASED). DOWEL SIZES SHALL BE AS
FOLLOWS:
4" THICK SLAB 1/2"X12" LONG 12" O.C.
5" THICK SLAB 1/2"X12" LONG 12" O.C.
6" THICK SLAB 3/4"X16" LONG 12" O.C.
BOND BREAKER COMPOUND TO BE PAINTED ON PRIOR TO
POURING ADJACENT SLAB. INDUSTRIAL FLOORS SUBJECT TO
SMALL HARD WHEEL TRAFFIC SHOULD HAVE JOINTS FILLED.
9. CONCRETE SUBCONTRACTOR TO APPROVE SUB
GRADES PRIOR TO SLAB INSTALLATION.
10. CONTROL JOINTS AROUND ALL INTERIOR COLUMNS
SHOULD BE SAWCUT THE FULL DEPTH OF THE SLAB OR
BE DONE AS A CONSTRUCTION JOINT (POURED
SEPERATELY). CIRCLES SHOULD BE PREFERRED OVER
DIAMONDS.
11. NO FLYASH PRODUCTS ARE ALLOWED IN CONCRETE
MIXES TO BE UTILIZED IN FLOOR SLABS.
12. DIAMOND DOWEL PLATES MAY BE UTILIZED IN PLACE
OF CONVENTIONAL DOWELS. REFER TO CONVERSION
CHART BELOW:
DIAMOND DOWEL
PLATE SIZE
(THICKNESS X SQ.
LENGTH)
3/4" ROUND
DOWELS
7/8" ROUND
DOWELS
1" ROUND
DOWELS
1 1/4" ROUND
DOWELS
NOTE: THE RECOMMENDED MAX. SPACING FOR DIAMOND DOWEL PLATES IN
AREAS SUBJECT TO HEAVY FORKLIFT TRAFFIC IS 24"
CENTER-TO-CENTER SPACING FOR DIAMOND DOWEL PLATES
12"18"24"12"18"24"12"18"24"12"18"24"
1/4" X 4.5"
3/8" X 4.5"
18"24"30"
22"24"24"18"24"24"12"18"24"
ROUND DOWEL SPACING
SAWCUT CONTROL JOINTS (SEE
FLOOR NOTES)
5" THICK 4000 PSI CONCRETE SLAB W/FIBERMESH, 3/4" AGGREGATE &
VAPOR BARRIER
SEE SITE PLANS FOR BASE
VAPOR BARRIER, SEE SPEC.
SAWCUT CONTROL JOINTS (SEE
FLOOR NOTES)
6" THICK 4000 PSI CONCRETE SLAB W/FIBERMESH & 1 1/2" AGGREGATE
SEE SITE PLANS FOR BASE
VAPOR BARRIER. SEE SPEC.
BAR SIZE
#4 23"
#5 28"
#6 34"
#7 49"
#8 56"
L
NOTES:
1. TABLE APPLIES TO WALLS, FOOTING AND SLABS FOR UNCOATED BARS
2. PROVIDE 2" MIN CONCRETE COVER
3. DATA BASED ON ACI 12.2.3, CLASS B SPLICE
4. MINIMUM STEEL YIELD STRENGTH 60,000 PSIL MINIMUMf'c=3000 psi f'c=4000 psi
REBAR SPLICE LENGTH
20"
24"
29"
42"
48"
6" ID STEEL PIPE X 7'-0" LONG
CONCRETE FILLED
3' - 6"3' - 6"6"14" DIAMETER SONOTUBE PIER
FIN FLOOR3/8" CROWNBOLLARD COVER OVER
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
S2.1FOUNDATION DETAILS (1)PROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
3/4" = 1'-0"6 ANCHOR BOLT DETAIL
1" = 1'-0"5 PIER CONTROL JOINT
1 1/2" = 1'-0"1 SLAB ON GRADE A
1 1/2" = 1'-0"2 SLAB ON GRADE B
1 1/2" = 1'-0"3 CONCRETE DECK DETAIL
1" = 1'-0"4 BOLLARD DETAIL
NOT
U
S
E
D DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT04-16-13REVISION 1
CONC. SLAB
SEE FTG SCHED FOR REINF.
CIRCULAR CONTROL
JOINT AROUND COLUMN
INTERIOR COLUMN
ELEV-SEE FTG SCHEDULE
NOTE: APPLY ASPHALT PAINT TO THE PORTIONS OF
ALL STEEL COLUMNS THAT ARE EMBEDDED IN
CONCRETE.
GRAVEL BASE
1" SAND BOND BREAK
SEE FTG. SCHEDULE3 1/2"24" ANCHOR BOLT,
TACK WELD ON
HEAVY DUTY HEX
NUT
VAPOR BARRIER
7"CONCRETE ENTRANCE
SLAB - SEE SITE PLANS
FOR DETAILS
EXPANSION JOINT, W/
SILICONE SEALANT
#4 CONT. BARS
SEE TYP. FND WALL
DETAILS FOR
REINFORCING
FIN FLR EL=150'-0"
RIGID INSULATION, SEE
SPECIFICATION
3' - 10"1' - 0"(2) #5 CONTINUOUS BARS
#5 VERT. BARS 48" O.C.
THRESHOLD TO COVER JOINT
VAPOR BARRIER
4"
8"
4"3' - 10"1' - 0"4"8"4"
1' - 4"
SEE SITE PLANS FOR
BASE REQUIREMENTS
(4) #4 CONTINUOUS HORIZ.
BARS
SEE TYP. SLAB ON
GRADE DETAIL
RIGID INSULATION PER
SPECIFICATION
FIN GRADE
(2) #5 CONTINUOUS BARS
#5 VERT. BARS 48" O.C.
ROUGHEN
JOINT
4' - 0" COVER MIN.COVER2" MIN1 1/2"1 1/2"
CHAMFER OUTER EDGE
OF FOUNDATION WALL
AT CURTAINWALL
VAPOR BARRIER
NO NOTCH AT DOOR
LOCATIONS, SEE DETAIL 5
T.O.F ELV. = 146'-2"
T.O.F ELV. = 145'-2"
T.O. SLAB ELV. = 150'-0"3' - 10"1' - 0"4"8"4"
1' - 4"
SEE SITE PLANS FOR
BASE REQUIREMENTS
(4) #4 CONTINUOUS HORIZ.
BARS
SEE TYP. SLAB ON
GRADE DETAIL
RIGID INSULATION, SEE
SPECIFICATION. TO TOP OF
SLAB
FIN GRADE
(2) #5 CONTINUOUS BARS
#5 VERT. BARS 48" O.C.ROUGHEN
JOINT
COVER2" MIN4'-0" TYP.6'-0" LG. #6 BARS EMBED 3' IN FND WALL AT 32" O.C & AT BOTH SIDES OF
CMU CONTROL JOINTS & AT 16" O.C. FOR A DISTANCE OF 6'-0" AT BOTH
SIDES OF OUTSIDE CORNERS (ONLY AT WALLS W/ CMU)
VAPOR BARRIER
T.O.F ELV. = 146'-2"
T.O.F ELV. = 145'-2"
T.O. SLAB ELV. = 150'-0"
HOOPS & TIES - SEE REINF DETAILS
DOWELS - SEE REINF. DETAILS
L-SHAPED BARS - PLACE HOOK
UNDER FOOTING REINFORCING
SEE FTG. SCHEDULE FOR
REINF.8"8"8"8"2"2"2"7"INSIDE FACE OF FND WALL (BEYOND)
WALL FTG (BEYOND)3' - 10"SCHEDULESEE FTG.SEE FTG SCHEDULE
CL
FOR DIMENSIONS
SEE PIER DETAILS
CONTINUOUS WALL
REBAR SEE FND WALL
SECTIONS
CONTINUOUS FTG
REBAR - SEE FND
WALL SECTIONS
RIGID INSULATION, SEE SPECIFICATION, TAPER TO
1/2" AT TOP OF SLAB. PROVIDE CAULK JOINT AT
PERIMETER OF FLOOR WHERE EXPOSED.
7 1/4" @ COLUMNS (SEE PIER DETAILS)3 1/2"24" ANCHOR BOLT W/ HEAVY HEX NUT, TACK WELD ON
VAPOR BARRIER
GRAVEL BASE-SEE
TYP. SLAB DETAIL
#4 REINF. CONTINUOUS
SEE TYP. SLAB ON
GRADE DETAIL
8"BOND BREAKER
RIGID INSULATION PER SPECIFICATION3/4"9 3/4"
VAPOR BARRIER
x
SCHEDULESEESEE FTG. SCHEDULE
L-SHAPED BARS - PLACE
HOOK UNDER FTG REINF.
DOWELS - SEE REINF. DETAILS
(3) HOOPS (TOP 6") - SEE REINF. DETAILS
CIRCULAR ISOLATION JOINT
INFILL
COLUMN
3' - 10"8"8"8"8"2"2"2"7"24" ANCHOR BOLT W/ HEAVY
DUTY HEX NUT TACK WELD ON
2"2"
VAPOR BARRIER, TYP.3 1/2"8"1' - 4"8"8" CMU WALL
EXPANSION JOINTSAND BOND BREAK
GRAVEL BASE
SLAB ON GRADE -
SEE TYP. DETAIL
#4 BAR 4'-0" O.C.
GROUT SOLID
#4 L-BARS IN FTG. 4'-0" O.C.
(3) #4 BARS CONT.
8" CMU WALL
GRAVEL BASE
SLAB ON GRADE -
SEE TYP. DETAIL
#4 BAR 4'-0" O.C.
GROUT SOLID
#4 L-BARS IN
FTG. 4'-0" O.C.
(3) #4 BARS CONT.
1' - 4"8"VAPOR BARRIERVAPOR BARRIER
LIFT & CONTAINMENT TUBES BY LIFT INSTALLER.
CONCRETE FLOOR SLAB
6"1' - 6"6"
FRAME ANCHOR
SIDE & FRONT DIMENSIONS (VIF)
23.375" OR 73.625"
7,200 LBS. MAX. REACTION
LONGITUDINAL & TRANSVERSE
DIRECTION DUE TO ECENTRIC
LOADS. 15,000 LBS. MAX VERTICAL
LOADS105" (VIF)SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
S2.2FOUNDATION DETAILS (2)PROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
1" = 1'-0"4 INTERIOR PIER @ SALES & PARTS
1" = 1'-0"5 DOOR FOUNATION DETAIL
1" = 1'-0"1 FOUNDATION AT CURTAIN WALLS
1" = 1'-0"3 TYP. 4' FOUNDATION WALL
1" = 1'-0"2 TYP. 4' PIER DETAIL
1" = 1'-0"6 FND - OHD recess
3/4" = 1'-0"7 INTERIOR LOW PIER @ PARTS
1" = 1'-0"8 INTERIOR CMU WALL FOOTING
3/4" = 1'-0"9 SECTION AT CAR LIFT SUPPORTS DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT04-16-13REVISION 105-01-13ISSUED FOR CONSTRUCTION REVISION
4 6325
LL
1
T.O.PIER= 149' - 5"#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA)
ANC. BOLTS
3" PROJECTION
1' - 0"4"8 1/8"#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA)
ANC. BOLTS
3" PROJECTION
1' - 0"4"2"2"
T.O.PIER= 149' - 5"
(4) AB1 (3/4" DIA)
ANC. BOLTS
3" PROJECTION1' - 1 1/8"4"1' - 0"4"(4) AB1 (3/4" DIA)
ANC. BOLTS
3" PROJECTION
5 3/8"
4"1' - 1 1/8"4"1' - 0"4"4"
5 3/8"
2"2"
2' - 4"8"2' - 0"#3 HOOPS
(8) #6 VERTICALS
(4) AB1 (3/4" DIA)
ANC. BOLTS
3" PROJECTION
(4) AB1 (3/4" DIA)
ANC. BOLTS
3" PROJECTION
T.O.PIER= 149' - 5"#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA)
ANC. BOLTS
3" PROJECTION8"2' - 0"6"2"2"6"
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA)
ANC. BOLTS
3" PROJECTION
1' - 0"4"2' - 0"8"8"2' - 0"1' - 4"1' - 4"1' - 4"8"1' - 10"1' - 4"8"4"1' - 0"1' - 4"
1' - 4"
2"2"
2' - 4"
#3 HOOPS
(8) #6 VERTICALS
T.O.PIER= 149' - 5"
T.O.PIER= 149' - 5"3/4"1' - 8"8"8"1' - 8"
16' - 8"19' - 0"15' - 4"19' - 0"16' - 8"3/4"T.O.PIER= 149' - 5"3/4"3/4"2"2"
8"8"8"
B
C
D
E
F
H
K
I
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION 2"2"#3 HOOPS
(4) #6 VERTICALS
1' - 0"4"8"2"2"#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
3/4"
1' - 4"
11 1/2"4"2"2"8"1' - 4"1' - 4"1' - 4"1' - 4"8"1' - 4"
1' - 4"1' - 4"8"1' - 4"
11 1/2"
FRAMED OPENING BETWEEN
COLUMN LINE C & D
8"1' - 6"
1' - 0"4"
8"1' - 6"
1' - 0"4"2"2"2"2"11 1/2"4"
8"
11 1/2"4"
4"
11 1/2"4"
FRAMED OPENING BETWEEN
COLUMN F & H.
FRAMED OPENING
BETWEEN COLUMN F & E(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
T.O.PIER= 149' - 5"
FRAMED OPENING BETWEEN
COLUMN LINE B & C
8"8"1' - 4"8"8"3/4"8"8"8"1' - 4"8"8"1' - 4"3/4"
3/4" NOTCH, TYP.
3/4" NOTCH, TYP.2"2"8"8"1' - 4"3/4" NOTCH, TYP.8"8"8"8"1' - 4"2"2"2"2"T.O.PIER= 149' - 5"
T.O.PIER= 149' - 5"
T.O.PIER= 149' - 4"
T.O.PIER= 149' - 5"
T.O.PIER= 149' - 5"
T.O.PIER= 149' - 5"
6
J
K6"2"2"6"#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
1' - 4"3/4"1' - 4"4"1' - 0"2"2"1' - 6"8"8"1' - 4"4"1' - 0"
#3 HOOPS
(4) #6 VERTICALS
3/4"
4 6 7325
A A
1
11 1/2"4"8 1/2"2"2"
8"1' - 4"
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
2"2"8"2' - 0"11 1/2"4"1' - 4"
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4"
DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
2"2"
2' - 0"1' - 4"2' - 0"8"2"2"
1' - 4"1' - 4"
1' - 4"11 1/2"4"11 1/2"4"8"2' - 0"11 1/2"4"1' - 4"16' - 8"19' - 0"15' - 4"19' - 0"16' - 8"19' - 8"8"2' - 0"11 1/2"4"2"2"
1' - 4"11 1/2"4"2' - 0"T.O.PIER= 149' - 5"T.O.PIER= 149' - 5"T.O.PIER= 149' - 5"
T.O.PIER= 149' - 5"1' - 4"3/4"7 1/4"8"8"8"8"
2"2"8"2' - 0"8"8"8"8"
2"2"
8"8"
1' - 4"
T.O.PIER= 149' - 5"
T.O.PIER= 149' - 5"3/4"3/4"3/4"3/4"3/4"8"3/4"8"
3/4"
3/4"8"8"
7
B
C
D
E
F
H
J
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION 4"11 1/2"
4"11 1/2"1' - 4"#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
6"2"2"6"8"
1' - 4"8"1' - 0"4"10"#3 HOOPS
(8) #6 VERTICALS
2' - 0"1' - 4"1' - 4"8"1' - 4"1' - 4"8"1' - 4"1' - 4"8"1' - 4"1' - 4"8"1' - 4"1' - 4"8"1' - 6"8"(4) AB1 (3/4" DIA.)
ANC. BOLTS
3" PROJECTION
4"11 1/2"
4"11 1/2"2"2"2"2"4"11 1/2"
4"11 1/2"
PASS DOOR
FRAMED
OPENING
RYTEC
FRAMED
OPENING
RYTEC
FRAMED
OPENING
3/4"1' - 4"
3/4"
3/4"
8"
3/4"
3/4"
3/4"
3/4"
3/4"2"2"2"2"2"2"2"2"4 6325
E
(4) AB1 (3/4" DIA)
ANC BOLTS
3" PROJECTION
#3 HOOPS
(4) #6 VERTICALS
2"2"2"2"1' - 4"1' - 6"2"2"2"2"2"2"2"2"
(4) AB1 (3/4" DIA)
ANC BOLTS
3" PROJECTION
(4) AB1 (3/4" DIA)
ANC BOLTS
3" PROJECTION
(4) AB1 (3/4" DIA)
ANC BOLTS
3" PROJECTION
(4) AB1 (3/4" DIA)
ANC BOLTS
3" PROJECTION
2"2"2"2"2"2"2"2"T.O.FOOTING= 149' - 5"T.O.FOOTING= 149' - 5"T.O.FOOTING= 149' - 5"T.O.FOOTING= 149' - 5"
T.O.PIER= 149' - 5"
5
(4) AB1 (3/4" DIA)
ANC BOLTS
3" PROJECTION
2"2"2"2"
T.O.FOOTING= 149' - 5"
432
H
(4) AB1 (3/4" DIA)
ANC BOLTS
3" PROJECTION
INTO FOOTING AS
SCHEDULED 2"2"2"2"
(4) AB1 (3/4" DIA)
ANC BOLTS
3" PROJECTION
INTO FOOTING AS
SCHEDULED
(4) AB1 (3/4" DIA)
ANC BOLTS
3" PROJECTION
INTO FOOTING AS
SCHEDULED
T.O.FOOTING= 149' - 5"T.O.FOOTING= 149' - 5"T.O.FOOTING= 149' - 5"2"2"2"2"2"2"2"2"
G
(4) AB1 (3/4" DIA) ANC BOLTS
3" PROJECTION, INTO FOOTING.
SEE FOOTING SCHEDULE
2"2"2"2"T.O.FOOTING= 149' - 5"
2"2 1/2"
EXT. FND WALL FACEANCHOR BOLTS1/2" TO CL (VARIES BY LOCATION)2 1/2" FRAMEVARIES
1/2" ANCHOR BOLTS,
1 1/2" PROJECTION
3"EDGE OF FRAMED OPENING,
FRAMING VARIES WITH
LOCATION, SEE CECO DWGS.
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
S3.1PIER DETAILSPROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009
FRAMED OPENING DETAIL
T.O.W. ELV.= 150'-0" TYP.DATEDESCRIPTION01-11-13ISSUED FOR BID02-08-13CONSTRUCTION PROPOSAL02-15-13ISSUED FOR PERMIT03-27-13ISSUED FOR CONTRACT04-16-13REVISION 105-01-13ISSUED FOR CONSTRUCTION REVISION
43
L
2
S3.2
3
S3.2
1' - 7"6 1/4"10"10"6 1/4"9' - 5 1/2"1' - 7"
1' - 0 3/4"2' - 11 1/4"2' - 11 1/4"1' - 0 3/4"
4' - 0"4' - 0"1' - 0"6"1' - 6"3' - 0"FOOTING BELOW
ELEMENT PIER, NOTCH, POUR
SIDEWALK TO TOP OF PIER
NOTCH
1' - 2 1/4"
EXISTING PIER
EXISTING FOUNDATION WALL
8"4"9"9"9"6"6"6"6"CL
ANCHOR BOLTS (4)
PROVIDED BY AGI
VERTICAL REBAR: (4) #5 REBAR
HORIZONTAL: (7) #4 REBAR @
6" O.C. TOP 24"; 9" O.C. BELOW
EXISTING FOOTING BEYOND
NOTCH TOP OF
PIER, INFILL WITH
SIDEWALK, BACK
TO DOOR
OPENING6"1' - 2 1/4"
2' - 0"2' - 0"
4' - 0"
5"5"4' - 10"1' - 0"1' - 0"
(6) #5 X 18" LONG BARS, DRILL &
EPOXY INTO EXISTING
FOUNDATION WALL, (EACH SIDE)
ANCHOR BOLTS (4)
PROVIDED BY AGI
VERTICAL REBAR: (4) #5 REBAR
HORIZONTAL: (7) #4 REBAR @
6" O.C. TOP 24"; 9" O.C. BELOW
PIER L/ 3&4
2' - 8"
3' - 0"
EXISTYING FOOTING
L
FACE OF FOUNDATION
CL
1' - 0"3"3"1' - 6"10 1/2"7 1/2"1' - 4 1/2"1' - 0"6"
(6) #5 X 18" LONG BARS,
DRILL & EPOXY INTO
EXISTING FOUNDATION
WALL, (EACH SIDE)
SHEET #:FOR VALID CERTIFICATIONORIGINAL SEAL & SIGNATURE REQUIREDPHONE (413) 536-0021 FAX (413) 536-09084 INDUSTRIAL DRIVE, SOUTH HADLEY, MA 01075ASSOCIATED BUILDERS, INC.EMAIL: abuilders@abuilders.comDRAWN BY:
JOB #:
S3.2PIER DETAILS (2)PROPOSED HYUNDAI DEALERSHIP347 KING STREETNORTHAMPTON, MA 01060RJC
12009DATEDESCRIPTION06-11-13ISSUED FOR CONSTRUCTION REVISON 1/2" = 1'-0"1 ELEMENT PIER ENLARGED PLAN
3/4" = 1'-0"2 PIER DETAIL (1)
3/4" = 1'-0"3 PIER DETAIL (2)
467325AABBCCDDEEFFHHJIIG1MEN'S10WOMEN'S9SHOWROOM2LOUNGE8RETAIL PARTS16SERVICEWRITE-UP15SERVICE MGR17LOCKER18PARTS21SPRINKLER22TANK RM23ELECT.24SERVICE26SERVICEDRIVE25HALL B19BUSINESSOFFICE13INTERNET6OFFICE5HALL A14SALES MGR4F & I3OFFICE11OFFICE12F & I75*''6FOR VALID CERTIFICATION
ORIGINAL SEAL & SIGNATURE REQUIRED
0DRAWN BY:ISSUED,1$PROPOSED HYUNDAI DEALERSHIP
347 KING STREET
NORTHAMPTON, MA 0106012009 REV DATE DESCRIPTION
1 02-18-13 PLUMBING CONSTRUCTION SETConsulting Engineers, Inc.ROBT W. HALLROBT W. HALLMEADOW STREET EXT.(413) 789-0960AGAWAM, MA 01001JOB NO. 196-5160-13PLUMBING FLOOR PLANSCALE: 1/8"=1'-0"P1.1PLBG FLOOR PLAN, DETAILS, & SCHEDULES
WMG
467325AABBCCDDEEFFHHJIIG1MEN'S10WOMEN'S9LOUNGE8RETAIL PARTS16SERVICEWRITE-UP15SERVICE MGR17LOCKER18PARTS21SPRINKLER22TANK RM23ELECT.24SERVICE26SERVICEDRIVE25HALL B19BUSINESSOFFICE13INTERNET6OFFICE5HALL A14SALES MGR4F & I3OFFICE11OFFICE12F & I75*''6FOR VALID CERTIFICATION
ORIGINAL SEAL & SIGNATURE REQUIRED
0DRAWN BY:ISSUED,1$PROPOSED HYUNDAI DEALERSHIP
347 KING STREET
NORTHAMPTON, MA 0106012009 REV DATE DESCRIPTION
1 02-18-13 PLUMBING CONSTRUCTION SETConsulting Engineers, Inc.ROBT W. HALLROBT W. HALLMEADOW STREET EXT.(413) 789-0960AGAWAM, MA 01001JOB NO. 196-5160-13PLUMBING FLOOR PLANSCALE: 1/8"=1'-0"P1.2PLBG FLOOR PLAN, DETAILS, & SCHEDULES
WMGWATER RISER DIAGRAM #1NOT TO SCALEWATER RISER DIAGRAM #2NOT TO SCALEWATER SERVICE PIPING DETAILNOT TO SCALE
5*''6FOR VALID CERTIFICATION
ORIGINAL SEAL & SIGNATURE REQUIRED
0DRAWN BY:ISSUED,1$PROPOSED HYUNDAI DEALERSHIP
347 KING STREET
NORTHAMPTON, MA 0106012009 REV DATE DESCRIPTION
1 02-18-13 PLUMBING CONSTRUCTION SETConsulting Engineers, Inc.ROBT W. HALLROBT W. HALLMEADOW STREET EXT.(413) 789-0960AGAWAM, MA 01001JOB NO. 196-5160-13GAS OIL INTERCEPTOR (MDC TRAP) PIPING DETAILNOT TO SCALEP1.3PLBG SPECIFICATIONS & DETAILS
WMGWATER HEATER PIPING DETAILNOT TO SCALE