Loading...
17-Division 15100 Plumbing467325AABBCCDDEEFFHHJIIG1MEN'S10WOMEN'S9SHOWROOM2LOUNGE8RETAIL PARTS16SERVICEWRITE-UP15SERVICE MGR17LOCKER18PARTS21SPRINKLER22TANK RM23ELECT.24SERVICE26SERVICEDRIVE25HALL B19BUSINESSOFFICE13INTERNET6OFFICE5HALL A14SALES MGR4F & I3OFFICE11OFFICE12F & I75*''6FOR VALID CERTIFICATION ORIGINAL SEAL & SIGNATURE REQUIRED 0DRAWN BY:ISSUED,1$PROPOSED HYUNDAI DEALERSHIP 347 KING STREET NORTHAMPTON, MA 0106012009 REV DATE DESCRIPTION 1 02-18-13 PLUMBING CONSTRUCTION SETConsulting Engineers, Inc.ROBT W. HALLROBT W. HALLMEADOW STREET EXT.(413) 789-0960AGAWAM, MA 01001JOB NO. 196-5160-13PLUMBING FLOOR PLANSCALE: 1/8"=1'-0"P1.1PLBG FLOOR PLAN, DETAILS, & SCHEDULES WMG 467325AABBCCDDEEFFHHJIIG1MEN'S10WOMEN'S9LOUNGE8RETAIL PARTS16SERVICEWRITE-UP15SERVICE MGR17LOCKER18PARTS21SPRINKLER22TANK RM23ELECT.24SERVICE26SERVICEDRIVE25HALL B19BUSINESSOFFICE13INTERNET6OFFICE5HALL A14SALES MGR4F & I3OFFICE11OFFICE12F & I75*''6FOR VALID CERTIFICATION ORIGINAL SEAL & SIGNATURE REQUIRED 0DRAWN BY:ISSUED,1$PROPOSED HYUNDAI DEALERSHIP 347 KING STREET NORTHAMPTON, MA 0106012009 REV DATE DESCRIPTION 1 02-18-13 PLUMBING CONSTRUCTION SETConsulting Engineers, Inc.ROBT W. HALLROBT W. HALLMEADOW STREET EXT.(413) 789-0960AGAWAM, MA 01001JOB NO. 196-5160-13PLUMBING FLOOR PLANSCALE: 1/8"=1'-0"P1.2PLBG FLOOR PLAN, DETAILS, & SCHEDULES WMGWATER RISER DIAGRAM #1NOT TO SCALEWATER RISER DIAGRAM #2NOT TO SCALEWATER SERVICE PIPING DETAILNOT TO SCALE 5*''6FOR VALID CERTIFICATION ORIGINAL SEAL & SIGNATURE REQUIRED 0DRAWN BY:ISSUED,1$PROPOSED HYUNDAI DEALERSHIP 347 KING STREET NORTHAMPTON, MA 0106012009 REV DATE DESCRIPTION 1 02-18-13 PLUMBING CONSTRUCTION SETConsulting Engineers, Inc.ROBT W. HALLROBT W. HALLMEADOW STREET EXT.(413) 789-0960AGAWAM, MA 01001JOB NO. 196-5160-13GAS OIL INTERCEPTOR (MDC TRAP) PIPING DETAILNOT TO SCALEP1.3PLBG SPECIFICATIONS & DETAILS WMGWATER HEATER PIPING DETAILNOT TO SCALE