Loading...
30A-032 2011-08-08 American Benefits Group Site Visit Notes FinalAmerican Benefits Group 320 Riverside Drive, Northampton MA Architects Site Visit Notes for Construction Control – Final Site Visit Date: 08.08.2011 Loc: Job Site, Northampton On-Site: Bob Cummings (BC), ABG Mitch Damon (MD), MR Damon Construction Bill Austin (BA), Austin Design Inc Copy: Louis Hasbrouck (LH), Building Commissioner Chris Farley (CF), Austin Design Inc. no. item action who by date 1. This site visit was made to review the Competed work. 2. All work appears completed according Recommend CO To plans. To the best of my knowledge and belief, these site visit notes are considered to be a true and accurate record of conversations and/or observations made on site. Unless notified to the contrary, these notes are assumed accurate. Respectfully submitted on Chris Farley’s behalf, Bill Austin, Austin Design Inc.