30A-032 2011-08-08 American Benefits Group Site Visit Notes FinalAmerican Benefits Group
320 Riverside Drive, Northampton MA
Architects Site Visit Notes for Construction Control – Final Site Visit
Date: 08.08.2011
Loc: Job Site, Northampton
On-Site:
Bob Cummings (BC), ABG
Mitch Damon (MD), MR Damon Construction
Bill Austin (BA), Austin Design Inc
Copy:
Louis Hasbrouck (LH), Building Commissioner
Chris Farley (CF), Austin Design Inc.
no. item action who by date
1. This site visit was made to review the
Competed work.
2. All work appears completed according Recommend CO
To plans.
To the best of my knowledge and belief, these site visit notes are
considered to be a true and accurate record of conversations and/or
observations made on site. Unless notified to the contrary, these notes
are assumed accurate.
Respectfully submitted on Chris Farley’s behalf,
Bill Austin, Austin Design Inc.