Loading...
31D-166 GARDNER CONSTRUCTION ELECTRONIC DRAWINGS-S2- EAST FIRE ESCAPE PLANJACOB SMITH ENGINEERING AND DESIGN 5EAST ELEVATION UPPER LEVELS AND STAIR ASSEMBLYSCALE: 38" = 1'-0"1. See General Notes on sheet S4.THE ACADEMY OF MUSIC NEW FIRE ESCAPES 274 MAIN STREET NORTHAMPTON, MA 01060 EAST ELEVATION INTERMEDIATE LEVEL AND STAIR ASSEMBLYSCALE: 38" = 1'-0"1. See General Notes on sheet S4.EAST ELEVATION LOWER LEVEL AND STAIR ASSEMBLYSCALE: 38" = 1'-0"1. See General Notes on sheet S4.EAST ELEVATION PAD FOOTING FOUNDATION PLANSCALE: 38" = 1'-0"1. See General Notes on sheet S4.