26 January 2016 – Peter Quintana, Sean Haskins
Bob's office on the second floor has been enlarged by 12” to 10'-2” deep with the stair and structure corrected to accommodate
all joists have been installed at 12”oc (increased strength from proposal)
all the Hilti bolts have been installed to avoid the joist hangers at 12”oc in pairs, meeting the number designated for support
Jeff's office will have a higher suspended ceiling (9' above floor)
1 February – Peter, Sean, Miguel Beriche
Jeff made aware that building permit is not issued; must solve Lavatories (propose a Code Compliance Alternative to allow continued use of the lavatories as is). Jeff and Peter reviewed
options for making the existing Office Area lavatory compliant in the future – can diminish the closet under the stairs in order to install a 3' door to the lavatory and maintain 18”
clearance to wall on the knob side. The stair angle will be low. Can also add compliant grab bars in the lavatory.
The middle bay purlin for the former garage overhead door will be relocated up in order to install windows in Bob's office. There was a steel strap bolted to the ridge area and welded
to the purlin which will be cut and reattached to the purlin in the higher location; this strap was probably for the overhead door motor, but will increase rigidity.