Loading...
32C-058 155 Pleasant St A110-QR-22 2016-12-07-1DN UP UP UP 15 F G E 9 I 8 10 2 14 14 M T H L B A A C 7 U 4 J K 11 13 13 12 D 36 15 15 N S R Q P 18 18 17 17 16 16 19 19 20 O 21 22 PROJECT NORTH TRUE NORTH A400 1 Sim PROJECT NORTH TRUE NORTH5'-1"A360 1 Sim FACE OF FRAMINGFACE OF FRAMINGSTRUCTURECLFACE OF FRAMINGPARTITIONCLFACE OF FRAMING FACE OF FRAMING FACE OF FRAMING FACE OF FRAMING FACE OF FRAMING FACE OF FRAMING PARTITION PARTITION PARTITION FACE OF FRAMING FACE OF FRAMING CL CL CLFACE OF FRAMINGFACE OF FRAMINGFACE OF FRAMINGFRAMINGFACE OF FRAMINGFACE OF FRAMINGCLSTRUCTURECLFACE OF FRAMING STRUCTURECLFACE OF FRAMINGFACE OFFRAMING FACE OFFRAMING FACE OFFRAMING FACE OFFRAMING FACE OFFRAMING FACE OFFRAMING FACE OF FRAMINGFACE OFFRAMINGFACE OF FRAMINGA410 1 Sim 2 5 1 7 10 3 8 5 5 7 6 6 9 3B 1 8 3B 1 8 8A 8A 8 5A 8 8A 3 3C 8A 8 1 2 5 55 2 6 8 8A 8 3B 1C 3B 3B 3C 3C 3C 8 5 7 8D 5D 10 9'-0" 11'-6"2'-2"2'-6 1/4"4'-7"11'-0 1/2"19'-2 1/4"80'-1 1/4"2'-7 3/4" 7'-4 3/4"10'-4 3/4"5'-3 1/4"7 4.5 °152.5°19'-2"11'-1 1/2" 4'-0"2'-0 3/4"4 3/4"4'-9 1/4"4'-4 3/4" 6'-8 3/4" 1'-10 1/2" 2'-7 1/4" 1'-6 1/2"2'-7 1/2" 11'-2 1/4"7'-0"2'-6 1/2"15'-8 1/4"2'-1 1/4"3'-3 1/2"2'-5"22'-9 1/4"13'-3"30'-0 1/4" 18'-8 1/2"11'-3 1/4" 1'-8 1/4" 13'-7 3/4" 12'-11 1/2" 8A 4'-9 3/4"6'-9 3/4"1'-0"1'-0"5'-0 1/2" 5'-0 1/4" 7'-7 3/4" 5'-0 1/2" 5'-1 3/4"1'-0"9'-9 1/2" 7'-6 1/4" 2'-0" 2'-7 3/4" 11'-10 1/4"1'-0"16'-9 1/2"9'-7"6'-3 1/2"4 '-1 1 /2"5'-3 1/4"2'-3 1/2"16'-7"39'-9"4'-7"11 1/4"1'-7 1/4"8'-0 3/4"1'-4 1/2"6'-11"8'-8 1/2"20'-0 1/2"8 20'-3"5'-5 1/4"11 1/2" 70.0°110.0°160.0°40.0° 6'-0"12'-10"8'-8"5'-0"6'-8 3/4"19'-0 1/2"1'-9" 60'-0"4'-3 1/2"22'-4"18'-2 3/4"18'-3 1/4"22'-4"85'-5 1/2"8'-6 1/2"26'-10 1/4"35'-4 3/4"22'-3" 18'-0 1/4" 22'-0 1/4" 22'-0" 18'-0 3/4" 8'-6 3/4" 110'-11" 106'-7 1/2" 22'-3" 18'-0 1/4" 22'-0 1/4" 22'-0" 22'-4" 73'-11 3/4" 18'-2 3/4" 10'-4 1/4" 22'-1 1/4" 11'-11 3/4"32'-6"5'-0"1'-11 1/2"12'-7 3/4"7'-11"5'-0"60'-0"8'-0"5'-0"21'-2"6'-4"19'-6"3'-3"9'-1 3/4" 5'-6 3/4" 5'-5 3/4" 5'-5 3/4" 5'-7 3/4" 5'-5 3/4" 9'-0 1/2" 5'-10 3/4" 3'-8 1/4"21'-0 3/4"7'-11 1/4"3'-7"1'-6 1/4"4'-7 1/4"5'-8 3/4" 5'-7"5'-7 1/2" 5'-5 3/4" 5'-5 3/4" 4'-1 1/4" 9'-0 1/4" 5'-5 3/4" 5'-9 1/2" 5'-8 1/4" 6'-3" 6'-2 1/4" 4'-8 3/4"4'-11"10'-4 1/2"5'-2 1/4"2'-6"2'-6 3/4"2'-7"8 6 21.1 1 8'-3 1/2"30'-10 1/2"22'-0"2'-1"2'-1 1/2"CL CL CL 5'-2"CL CL STEELCLFRAMINGCLFRAMINGCLFRAMINGCLFRAMINGCLFRAMINGCLFRAMINGCLFRAMINGCLFRAMINGCL5 1'-6"RESILIENT CHANNEL @ EXTERIOR WALL TO MATCH WALL TYPE 1B 1B 1B 25'-6 3/8"7'-5"26'-1"3B 3B 3B 3B 3B 3B RESILIENT CHANNEL @ EXTERIOR WALL TO MATCH WALL TYPE 3B 3B 3B26'-1"7'-5"25'-5 3/4"4 5 8 5 2 4'-7" 5 7'-0"7'-2"10'-6"2'-0"PROVIDE CAVITY INSULATION AND INTERIOR VAPOR BARRIER PER EXTERIOR WALL TYPE E-2 . SEE A001 E-2 7 PROVIDE CAVITY INSULATION AND INTERIOR VAPOR BARRIER PER EXTERIOR WALL TYPE E-2 . SEE A001 5 ADDITIONAL LAYER OF GWB TO MATCH WALL TYPE 2 2 9.1 C.1 1111D 4 8 11D 11D 11 5 11D 2 11E 5 11D 5D 5D 11D 5 5D 5 5 5 5D 5D 5 5D 5D 1.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW EXISTING AND PROPOSED DIMENSIONS AND ALIGNMENTS AND CONFIRM LOCATIONS AND ALIGNMENTS SHOWN CAN BE ACHIEVED. DISCREPANCIES BETWEEN PROPOSED ALIGNMENTS AND LOCATIONS AND EXISTING CONDITIONS MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO INSTALLATION OF THE WORK. 2.AS-BUILT DIMENSIONS AND EXISTING CONDITIONS MUST BE FIELD VERIFIED PRIOR TO FABRICATION OF CASEWORK, FIXTURES, FURNISHINGS AND EQUIPMENT TO CONFIRM FIT AND LOCATIONS AS SHOWN ON THE DRAWINGS OR AS DIRECTED BY THE ARCHITECT. DISCREPANCIES MUST BE BROUGHT TO THE ARCHITECTS ATTENTION PRIOR TO ORDERING OR FABRICATING. 3.GRID AND GRID DIMENSIONS ARE TO FACE OF FOUNDATION, EXTERIOR FACE OF FRAMING OR AS NOTED. 4.EXTERIOR DIMENSIONS ARE TO FACE OF FRAMING AND CENTERLINE OF OPENINGS OR AS NOTED. 5.INTERIOR DIMENSIONS ARE TO FINISH FACE OF WALL BOARD FINISH, FINISH EDGE, FINISH OPENING, CENTERLINE OF OPENING AND CENTERLINE OF FIXTURES OR AS NOTED. 6.PROVIDE ROUGH OPENINGS PER WINDOW AND DOOR MANUFACTURER RECOMMENDATIONS UNLESS NOTED OR DETAILED OTHERWISE. 7.SEE ROOF PLAN FOR ROOF INFORMATION. 8.SEE SPECIFICATIONS FOR DOOR SCHEDULE & DOOR INFORMATION. 9.SEE SPECIFICATIONS FOR FINISH SCHEDULE & FINISH INFORMATION. 10.SEE SHEET SPECIFICATION FOR WINDOW SCHEDULE. 11.PER MA 521 CMR, 5% OF UNITS (FOUR TOTAL - TWO STUDIO & TWO ONE BEDROOM) ARE GROUP 2B COMPLIANT. ALL OTHER UNITS CAN BE MODIFIED TO MEET GROUP 2B REQUIREMENTS. GENERAL FLOOR PLAN NOTES REVISION: SHEET INFO: ISSUANCE: DATE: SCALE: DRAWN: CHECKED: Office of Peter Frothingham Registered Architect 181 Main Street, Suite One Northampton, MA 01060 413 585-5910 www.pfra.us LDa Architecture & Interiors 222 Third Street, Suite 3212 Cambridge, MA 02142 617 621-1455 fax 617 621-1477 www.LDa-Architects.com As indicated 6/3/2016 12:11:58 PM6 - 03 - 16 TA/MR/KB/PM DD/PM PARTITION PLAN - LEVEL 1 155 PLEASANT ST.NORTHAMPTON, MA 01060LIVE 155100% CONTRACT DOCUMENTS - CONSTRUCTION DRAWINGS A110201420