2018_0221 Monthly Report - JANUARY CONTROLLED CONSTRUCTION SUMMARY: JANUARY 2018 PROJECT NAME/LOCATION: LIVE 155/155 Pleasant St ARCHITECT’S PROJECT #: 201420 DATE ISSUED: 02/21/2018 ESTIMATED % COMPLETION: 87% SCHEDULE CONFORMANCE: YES PRESENT ON SITE: Peter Makrauer - LDa, Douglas Dick – LDa, Peter Frothingham – PFRA I) WORK IN PROGRESS: · Storefront installation at retail area is almost complete · Rain screen fiber cement panel installation is ongoing · Vanity tops have been installed in west wing units and kitchen countertops are beginning to be installed in the 3rd and 4th floor west wing units · Cabinets are being installed in east wing units · Unit doors, trim, forbo flooring and tile installation is ongoing · Unit painting is ongoing · Finish site grading underway II) OBSERVATIONS: · Elevator installation is near completion · Rain screen panels are continuing to being installed smoothly · Site appears to be managed well, safety protocols are emphasized & enforced by GC · Site trailer continues to be the location for all regular job meetings · Work appears to be completed in accordance with plans and specifications III) ANTICIPATED WORK IN THE NEXT 4 WEEKS · Finish installation of metal parapet cap at roof and walk matt · Continue installation of all finishes and casework · Continue priming and painting walls and ceilings · Continue installation of FCP panels · Complete elevator installation · Complete 10 units on 4th Floor west wing IV) INFORMATION/ACTION REQUIRED: · None at this time. NOTE: WEEKLY CONSTRUCTION ACTIVITY SUMMARIES & PROJECT SCHEDULE UPDATES ARE INCLUDED WITH THIS DOCUMENT. PREPARED BY: Peter Makrauer - Project Manager - LDa WEEKLY CONSTRUCTION ACTIVITY SUMMARY PROJECT: LIVE 155 ARCHITECT’S PROJECT #: 201420 DATE ISSUED: 1.4.18 ACCOMPLISHMENTS 1. Rain Screen: Installed colorful panels on North Elevation. Ordered 1st batch of FCP below 12’ 2. Metal Panning at storefronts complete 3. Storefront: Installation of frames is underway 4. West End Unit Finishes: a. 29 kitchens installed: 4, 3 & 2 except 201 b. Doors, base, case installation underway all 3 floors c. Tile complete on 4 & 3, underway on 2 & 1 d. Finish lighting installed on 4, 3, 2 & part of 1 5. East End Unit Finishes: Drywall complete, paint, DHW, ERVs, mini-splits, finish lighting underway 6. Elevator: Installation underway GOALS 1. Windows: A/D on site week of 01.08 to start repairs & handle installation. Documentation of repairs & lab water testing underway 2. West End Finishes: complete ongoing work on 2, 3 & 4. Install flooring on 4 3. 1st Floor: West end completion of drywall & 1st coat of paint, start tile 4. East End: Complete prime/1st coat of paint 5. Cabinet Deliveries: 01.15, 02.05 & 02.12 6. Countertops: vanities 1st batch next week 7. Elevator: Complete installation & have mason infill openings at the doors 8. Rain Screen Deliveries: Remainder of material above 12’ 01.08. 1st batch of FCP below 12’ 01.22 9. Restart Exterior Work on Hold Due to the Cold a. Exterior Caulking: Windows b. Roof: Complete penetrations & parapet/coping metal. c. Sitework: Complete planting strip along bike path, start area at South entry. d. Generator: Pour pad & start electrical tie-in 10. Design Team priorities: a. Final resolution of Pantry/DHW cover/Cab over fridge b. 1 BR Kitchen end cabinet base detail c. ADA unit kitchen details – transitions 34” to 36” d. Canopy metal colors e. finalizing all finishes WEEKLY CONSTRUCTION ACTIVITY SUMMARY PROJECT: LIVE 155 ARCHITECT’S PROJECT #: 201420 DATE ISSUED: 1.30.18 ACCOMPLISHMENTS 1. Generator: Pad poured & generator placed on pad 2. Site work restarted along South side of the building 3. Rain Screen: Installation above the 12’ band almost complete. 4. A/D on site last week. Repairs are complete. 5. Storefront: Installation at retail area almost complete. 6. Forbo is on site installing flooring. 7. Countertops: Vanity tops installed on 4W, 3W & 2W, Kitchens started on 4W & 3W 8. Plumbing fixture installations on 4W, 3W & 2W 9. Kitchen cabinet installations starting on 4E 10. Elevator: On car work complete (block infill, damper, disconnect, pit ) Installation nearing completion 11. Met with Louis Hasbrouck to discuss requirements for the CO GOALS 1. Windows: Issue window memo to A/D. Rework weeps & field test 2. Site work planning meeting 02.06 3. Cabinet Deliveries: 01.31 & 02.07 (complete) 4. Elevator: Complete installation 5. Finish all work requiring lifts a. Exterior Caulking: Windows & brick/FCP joint b. Roof: Complete parapet/coping metal & walk matt c. FCP installation above 12’ d. Material deliveries 6. Complete 10 units on 4W, ready for punch list 7. Won-Door and Smoke Curtain coordination 8. Design Team priorities: a. Meetings twice a week have been working well b. Stair 2 – finalizing details c. Issues which could keep us from getting the CO