150 Main ramp 2018-03-29Rev Date Description
Project Title
Additions & Renovations to:
THORNES
MARKETPLACE
ACME RAMP
150 MAIN
STREET
NORTHAMPTON, MA
Issue Date: 01/05/2018
Drawn By:
Checked By:
Project ID:
Drawing No.
Sheet Title:
Scale:
EEB
AS NOTED
15-02
01/05/18 PERMIT SET
WWW.ESTESARCHITECT.COM
EMILY ESTES
ARCHITECTURE + DESIGN
Project North
1
FREIGHT
PASSENGER9'-9"5'-4 3/4"1'-1"4'-10 1/2"1'-4 3/4"7'-2 1/4"LOCATION OF FRAMING
BELOW
6'-9 3/4"
DEMO MIRRORED WINDOW
DEMO DOOR
REMOVE EXISTING RAMP,
ALL FLOORING AND FRAMING
REMOVE HALF WALL AND
METAL RAILINGS
REMOVE CANTILEVERED
STORE FRONT.
REMOVE HALF WALL
UP
FREIGHT
PASSENGERDN 1'-0"1'-0"19'-0"DN
4'-0"MIN
±11'-6"2'-0"5'-0"5'-0"
EXISTING STEAM
PIPES TO REMAIN.
CANVAS SECURITY FABRIC
LOCATION WHEN OPEN 1'-0"LVT FLOORING ON
RAMP TO MATCH
EXISTING RAMP
TO HERRELL’S
INFILL DOOR AND
WINDOW
OPENING TO
MATCH
SURROUNDING
MATERIALS
METAL
HANDRAILS TO
MEET ADA CODE
PATCH FLOOR TO
MATCH EXISTING.
TOOTH INTO
EXISTING
PATTERN.
WOOD TREADS
AND RISERS.
2X4 FRAMED HALF
WALL WITH 5/8”
GWB ON BOTH
SIDES.
START OF
EXISTING RAMP
FRAMING
±2'-0"
7'-9"
0"
+19"
***NOTE: EXISTINGS DIMENSIONS MAY DIFFER FROM
THOSE NOTED DUE TO NATURAL SETTLING OF THE
BUILDING. THE "±" SYMBOL INDICATES THESE
ALLOWANCES.
4 1/2"
1'-0"3'-0"5'-0"5'-0"5'-0"5'-0"2
A-101
1
A-400
A
D B
C
CLEAR EXISTING
COLUMN BY 1 1/2”
WALL BRACKET
LOCATIONS TO
BE DETERMINED
BY INSTALLER
3"
4'-6"
EXISTING RED
FLOORING TO
REMAIN.
LVT FLOORING.
TRANSITION TO
EXISTING RED
RUBBER
FLOORING.
WOOD TREADS
AND RISERS.
WOOD NOSING.
TRANSITION TO
LVT.60” LANDING MIN.
ALIGN
+19"
+6.333
+12.666"
3
A-101
4
A-101
4
A-101
NEW RAMP.
SLOPE 1:12.
SEE
STRUCTURAL
DRAWINGS.
4'-1 1/2"
EXISTING AND DEMO FLOOR PLAN
1/2" = 1'-0"1 FLOOR PLAN
1/2" = 1'-0"2
A-100
FLOOR PLANS
Rev Date Description
Project Title
Additions & Renovations to:
THORNES
MARKETPLACE
ACME RAMP
150 MAIN
STREET
NORTHAMPTON, MA
Issue Date: 01/05/2018
Drawn By:
Checked By:
Project ID:
Drawing No.
Sheet Title:
Scale:
EEB
AS NOTED
15-02
01/05/18 PERMIT SET
WWW.ESTESARCHITECT.COM
EMILY ESTES
ARCHITECTURE + DESIGN
Project North
1
EQEQEQ1'-7"3'-0"3'-0"
1X6 PTD WOOD BASE1'-2"1X6 WHITE OAK,
QUARTER SAWN CAP.
CLEAR WATER BASED
POLYURATHANE FINISH.
GWB, PAINTED.
WOOD TREADS AND
RISERS TO MATCH
EXISTING WOOD FLOOR
IN COLOR.1'-7"4
A-101
1X6 PTD
WOOD BASE
GWB, PAINT
1 1/2” DIA
METAL
HANDRAIL,
PAINTED.
INFILL DOOR AND
WINDOW TO MATCH
SURROUNDING
MATERIALS.
INTERIOR ELEVATION
Scale: 1/2" = 1'-0"6
4'-0"MIN
3'-0"1'-8"7'-6"MINSINAGE TBD BY TENANT
CROWN MOULDING,
PAINTED.
4
A-101
1'-7"±1'-5"WOOD BLOCKING,
PAINTED, TYP
1X6 PTD
WOOD BASE
GWB, PAINT
1 1/2” DIA
METAL
HANDRAIL,
PAINTED.
OPEN
INTERIOR ELEVATION
Scale: 1/2" = 1'-0"5
1 1/2” DIA METAL
HANDRAIL, PAINTED.
INSTALLED TO
PROVIDE SHOP
DRAWINGS.
EXISTING GWB TO REMAIN
SECURITY CANVAS NICHE
Scale: 1 1/2" = 1'-0"3
1'-2"10 1/4"11 3/8"1'-5"±2'-6"1"STOREFRONT SOFFIT
Scale: 1 1/2" = 1'-0"45"5/8” GWB, PTD.
2X4 FRAMING
1X WOOD TRIM,
PAINTED
1X6 WOOD TRIM,
PAINTED
EXISTING PIPES TO REMAIN
LINE OF EXISTING
STOREFRONT TO REMAIN
1/2” MDF (OR
SIMILAR
MATERIAL), PTD.
CURTAIN NICHE BEYOND.
1/2” MDF (OR
SIMILAR
MATERIAL), PTD.
1/2” BOTTOM
REVEAL.
2X4 FRAMING
EXISTING TIN CEILING TO
REMAIN
TRIM, PAINTED
1"NOTE:
RELOCATE EXISTING SPRINKLER HEAD.
RELOCATE TENANT’S SECURITY CAMERA.1 1/2"1 1/2"5"SECURITY CANVAS NICHE
Scale: 1 1/2" = 1'-0"2
±1'-6"
NEW 5/8” GWB,
PAINTED ON
EXISTING WALL
NEW 5/8” GWB,
PAINTED ON
EXISTING WALL
2X4 FRAMING
5/8” GWB, PAINTED
1X4 WOOD TRIM,
PAINTED
1X4 WOOD TRIM,
PAINTED
CAVITY FOR
SECURITY CANVAS
CROWN MOLDING, PAINTED.
RELOCATE EXISTING
SPRINKLER HEAD.
SPRINKLER LOCATION TO BE
DETERMINED BY SPRINKLER
SUB-CONTRACTOR.
RELOCATE TENANT’S
SECURITY CAMERA.
LOCATION TBD BY TENANT.
RELOCATE
EXISTING
LIGHTING SWITCH
TO INSIDE OF
SECURED TENANT
SPACE.s4
A-101
PATCH AND PAINT CEILING
AS NEEDED AT LOCATION OF
REMOVED STOREFRONT
RELOCATE
EXISTING
LIGHTING SWITCH
TO INSIDE OF
SECURED TENANT
SPACE.
REFLECTED CEILING PLAN
1/2" = 1'-0"1
A-101
RCP, DETAILS,
INTERIOR
ELEVATIONS