Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
24D-294 2016-10-31_140_crescent_st-A-7 DETAILS
116 Pleasant Street Suite 331 Easthampton, MA 01027 Phone: 1-413-529-9434 Fax: 1-413-529-9434 SIEGFRIED PORTH ARCHITECT A-7SIDE ENTRY DETAILS PARK RESIDENCE 140 CRESCENT STREET, NORTHAMPTON, MAHANDRAILSABOVECONCRETE PAD6X6 PRESSURETREATED POST,BEARING ON PRECASTFOOTING BELOW &SUPPORTING CANOPYABOVE6X6 PRESSURETREATED RAIL POST2X6 PRESSURETREATED LEDGERBOARDS, FASTEN INTOEXISTING MASONRYWALL2X6 PRESSURETREATED JOISTS W/GALANIZED JOISTHANGERS, SIMPSONLUC66 OR SIMANGLE BRACKET,GALVANIZED, SIMPSONML24 OR SIMTRIM PER OWNER8" RISERS MAX &9" TREADS, TYP,VERIFY OVERALLRISE(4) 2X12 PRESSURETREATEDSTRINGERSAPPROXIMATE EDGEOF EXISTINGASPHALT DRIVEWAYFraming Plan Detail -Entry LandingScale - 34" = 1'-0"POST TO RIDGECONNECTOR,GALVANIZED, SIMPSONHCP2 OR SIMRIDGE TO RAFTER &RIDGE TO LEDGERCONNECTIONS,GALVANIZED, SIMPSONLSU26(3) 2X6 PRESSURETREATED BUILT-UPCOLUMN2X6 PRESSURETREATED SUBFACIABEAM TO BEAR ON 2X6PRESSURE TREATEDVERTICAL LEDGERBEAM TO BEAR ON 2X6PRESSURE TREATEDVERTICAL LEDGER8"8"2X6 RAFTER LEDGER,FASTEN THROUGHEXISTING WALL STUDSScale - 34" = 1'-0"HURRICANE TIES ATRAFTERS, GALVANIZED,SIMPSON H8 OR SIM6" K STYLE GUTTERFraming Section BBScale - 34" = 1'-0"Framing Plan Detail -Entry CanopyPRECAST FOOTING,EZCRETE OR SIM6" CONCRETE PAD,6X6 W/1.4X1.4 W.W.M,POSITION TO MEETFINAL STAIR BOTTOMGALVANIZED POST BASE,SIMPSON ABA66Z OR SIM4'-0"WOOD OR COMPOSITE RAILSYSTEM2X6 PRESURE TREATEDJOISTS, 16" O/C2X6 PRESURE TREATEDLEDGER, MOUNTED TO BRICKW/ MASONRY ANCHORS3/4" PLYWOOD DECK6X6 PRESSURE TREATEDPOST(3) 2X6 BUILTUP BEAM W/ TRIM8" RISERS MAX & 9" TREADS,TYP, VERIFY OVERALL RISE2X6 PRESSURE TREATEDVERTICAL LEDGER6" K-STYLE GUTTER12" PLYWOOD SHEATHING30 YR ASPHALT SHINGLE,MATCH EXISTINGHURRICANE TIES AT BEAM TORAFTER CONNECTION,SIMPSON H8 OR SIM2X6 PRESSURE TREATEDSUB-FACIARIDGE TO RAFTERCONNECTIONS, SIMPSON LSU262X6 PRESSURE TREATEDRAFTERS & RIDGEBOARDFLASH AS NEEDED2X4 PRESSURE TREATEDCEILING JOIST1/2" PLYWOOD CEILINGA-7BBA-7BBScale - 112" = 1'-0"Framing Detail - Canopy @ Post6" K-STYLE GUTTER12" PLYWOOD SHEATHING30 YR ASPHALT SHINGLE,MATCH EXISTINGHURRICANE TIES AT BEAM TORAFTER CONNECTION,GALVANIZED, SIMPSON H8 OR SIM2X6 PRESSURE TREATEDSUB-FACIARIDGE TO RAFTERCONNECTIONS, GALVANIZED,SIMPSON LSU26POST TO BEAMCONNECTIONS, GALVANIZED,SIMPSON LCE3WOOD OR COMPOSITE TRIMOVER CONNECTIONHARDWARERIDGE TO BEAM CORNERCONNECTOR, GALVANIZED,SIMPSON HCP2ANGLE BRACKET,GALVANIZED, SIMPSONML24 OR SIM