Loading...
18D-004 108B Damon Est 2015-09-14Proposal ~fC!Al.llfNG iN IIEAflN6 & All( CCNDJnCNlNS CONTRfJI.$ 4 Berard Circle Springfield, MA 01128 Phone # 413-782-2290 Date Proposal # 9/1112015 1367 Name I Address MATIIIAS KAINDL 108B DAMON RD NORTHAMPTON, MA 01000 aty Description Total PRfCE FINISH TIlE JOB AT 1006 FLORENCE RD, NORTIJAMPTON. AT THIS TIME TIlE SECOND FLOOR 7,200.00 DUCTWORK WAS INSTALLED FROM TIlE CELLAR CElLlNG IN TIlE BASEMENT UP THREW A CHASE TO TIlE ATTIC AND SUPPLIED TIlE SECOND FLOOR CElLlNGS IN EACH ROOM. TIlE GlBSON FURNACE AND AlC COIL WAS LEFT IN TIlE BASEMENT. TIlE ELECTRICIAN ( TIlE WIRING) AND PLUMBER ( TIlE GAS PIPING) HOOKED UP TIlEIR PART ON TIlE FURNACE. TIlERE WAS SOME DUCTWORK FITTINGS LEFT IN TIlE BASEMENT. AT THIS TIME MY PRfCE IS TO INCLUDE INSTALLING ALL TIlE SUPPLY AND RETIJRN REGISTERS THREW OUT TIlE HOUSE ( 1 ST AND 2ND FLOOR). TO INSTALL ALL THE DUCTWORK IN TIlE BASEMENT TO THE GAS FURNACE, ALL DUCTWORK WILL BE INSULATED IN BASEMENT, TO INSTALL AND PROVIDE A 3 TON 13 SER GlBSON AlC UNIT OUTDOORS, INCLUDING TIlE REFRfGERANT PIPING, FLUE PIPING, LOW VOLTAGE WIRING, T-STAT ON THE FIRST FLOOR, INCLUDING TIlE SHEET METAL PERMIT TO DO TIlE WORK. TOTALPRfCE $7,200.00 TOTAL PRfCE DOWN TO START $4,200.00 -\­ TOTAL PRfCH DO ON COMPLETION OF THE JOB $3,000.00 Total $7,200.00 Customer Signature: 'J1t~IvJI an KOv1(nvt( Installer Sig.~;?"~