Loading...
17A-259 Godin bathroom plansScale Project number Date Drawn by Checked by 104 Elm Street Northampton, MA 01060 (413) 587-3050 97 Oak Street Florence, MA Godin/ Petruccelli A100 97 Oak Street Project Number Issue Date Author Checker Project Scope: A second floor office space will be converted into a full bathroom with a walk in shower. The existing brick chimney will be removed down to the basement floor. There will be no alterations to the exterior walls or structure. Street View - Existing Rear View - Existing chimney to be removed down to basement floor DN 12' - 9"16' - 7"DN Scale Project number Date Drawn by Checked by 104 Elm Street Northampton, MA 01060 (413) 587-3050 97 Oak Street Florence, MA Godin/ Petruccelli 3/16" = 1'-0" A102 2nd Floor Existing Project Number Issue Date Author Checker 3/16" = 1'-0"1 2nd floor Existing Office Attic / Storage DN 12' - 9"16' - 7"9' - 9"Existing door and adjacent wall to be removed Existing brick chimney to be removed down to basement floor Scale Project number Date Drawn by Checked by 104 Elm Street Northampton, MA 01060 (413) 587-3050 97 Oak Street Florence, MA Godin/ Petruccelli 3/16" = 1'-0" A102a 2nd Floor Demo Project Number Issue Date Author Checker 3/16" = 1'-0"1 2nd floor Demo radiator to be moved DN 12' - 9"16' - 7"9' - 9"15 4' x 3' walk in shower with custom bench 1' - 6"5' - 4 1/8"Scale Project number Date Drawn by Checked by 104 Elm Street Northampton, MA 01060 (413) 587-3050 97 Oak Street Florence, MA Godin/ Petruccelli 3/16" = 1'-0" A102c 2nd Floor Proposed Project Number Issue Date Author Checker 3/16" = 1'-0"1 2nd floor Proposed Bath Attic/ Storage