Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
36 -292 Lyons A-2
PROPOSED SECOND FLOOR PLAN 1/4" = 1'-0"1DNLINENSBEDROOMMASTERBEDROOMMASTERBATHROOMBATHROOM205CLOSETROOF BELOWROOF BELOWROOF BELOWNEW HARDWOODFLOORING ONNEW FLOOR SYSTEMCH.SLOPED CEILINGABOVESLOPED CEILINGSLOPED CEILINGSLOPED CEILINGSLOPED CEILINGNEW SHED DORMERNEWROOF BELOWNEWROOF BELOW201203CLOSETCLOSETHALLBIDETNEW CUSTOMSHOWERSKY-LIGHTABOVE1A-3NEW SOAKING TUBWALL KEYEXISTING WALL TO REMAINNEW INTERIOR WALL: 2 X 4 WOOD STUDS, XX16" CENTERS, 1/2" GWB AT EACH SIDE.NEW EXTERIOR WALL: 2 X 6 WOOD STUDS, 16" CENTERS, 1/2" GWB AT INSIDE, VAPOR BARRIER, R-21 THERMAL INSULATION, 1/2" PLYWOOD SHEATHING AT OUTSIDE, SIDING TO MATCH EXISTING.EXISTING WALL TO BE REMOVEDDW2021A-42A-4BEAM ABOVEW-201W-201W-201W-204W-205W-206W-207W-208W-209W-210W-211W-212W-213W-215W-2147'-0"4 1/2"4 1/2"5'-6"7'-0"12'-11"4 1/2"ALIGNALIGN7'-2"2'-6"2043'-3 3/4"11'-10"2'-10 1/2"EQ.EQ.SLOPED CEILINGSLOPED CEILINGSLOPED CEILINGEXISTING HARDWOODFLOORING TO REMAINNEW TILEFLOORINGNEW TILEFLOORINGEXISTING HARDWOODFLOORING TO REMAINPATCH IN FLOORINGTO MATCHEXISTING HARDWOODPATCH IN FLRTO MATCHEX'G HDWDNEW HARDWOODFLOORING4 1/2"TO BE REMOVEDWALNUT HANDRAIL4'-7 1/4"4 1/2"3'-0"3'-0"5'-10"W-212W-212W-213W-210W-210W-201USE EXISTINGJAMB AT THISSIDENEW OPENING,SYMETRICAL INROOM TOWINDOW 215BEDROOMTRANSOMS:W-202W-2026-19-15FOR REVIEWmlCONSTRUCTASSOCIATES, INC.36 SERVICE CENTERNORTHAMPTON, MA 01060tel: 584-1224 fax: 584-7504SECOND FLOOR PLAN A-21/4" = 1'-0"RENOVATIONS FOR:DAN & MARLENELYONSRESIDENCE 74 SOVEREIGN WAYFLORENCE, MA 01062BABA123CCDrawn ByDate Issue 1236-30-15FOR REVIEW7-10-15FOR REVIEW7-14-15FOR REVIEW8-3-15FOR REVIEW8-6-15FOR REVIEW8-17-15FOR REVIEW9-2-15FOR REVIEW10-6-15FOR REVIEW