No preview available
 /
     
74 Bridge St IEBC 13 2017-07-0774 Bridge St Conversion per DB per DB ?? ?? x x x x x x x x x x x x x x x Height Area Compartment Unit separation Corridor walls Vertical Openings HVAC Fire Detection Fire Alarm Smoke Control Means of egress Dead ends Access travel Elevator Emergency lighting Mixed Occupancies Automatic Sprinklers Standpipes Incidental Accessory 1301…. 6-1 6-2 6-3 6-4 6-5 6-6 6-7 6-8 6-9 6-10 6-11 6-12 6-13 6-14 6-15 6-16 6-17 6-18 6-19 totals req'd Pass/Fail FS 0.11 4.4 16 0 0 2 5 6 0 **** **** **** 0 **** **** 0 -6 0 0 27.51 21 6.51000000000001 ME 0.11 4.4 16 0 0 2 5 6 0 0 0 2 13.9 -2 0 0 -6 **** 0 41.41 38 3.41 GS 0.11 4.4 16 0 0 2 5 6 0 0 0 2 13.9 -2 0 0 -6 0 0 41.41 38 3.41 bldg at least 16; maybe 22 default -0- **req'd per Mass table 903.2, note a (needs 13R system per BBRS interpretation) -0- if none