32A-177 (9)File 9 MP -2016-0052
APPLICANT/CONTACT PERSON PIONEER CONTRACTORS
ADDRESS/PHONE PO Box 1145 (413) 586-5491
PROPERTY LOCATION 74 BRIDGE ST
MAP 32A PARCEL 177 001 ZONE URCO00V
THIS SECTION FOR OFFICIAL USE ONLY:
r 7
®pErl S 4� „P t
C' P Vit'
�r 1 -
ENCLOSED REQUIRED DAT7—
ZONING FORM FILLED OU'I
Fee Paid
Building Pernut Filled out
Fee Paid
Tvpeof Construction' ZPA -ADD 3 SEASON PORCH
New Construction
Non Structural interior renovations
Building Plans Included'
Owner/ Statement or License
3 sets of Plans / Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFORMATION PRESENTED:
__Approved _ _ Additional permits required (see below)
PLANNING BOARD PERMIT REQUIRED UNDER: §
Intermediate Project: Site Plan AND/OR Special Permit with Site Plan
Major Project: Site Plan AND/OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding__ _ Special Permit_ Variance'
Received & Recorded at Registry of Deeds Proof Enclosed
_Other Permits Required:
Curb Cmfrom DPW ----Water Availability _ Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
Sienanue of Bui I cimu Official
Date
Note: Issuance of a Zoning permit does not relieve a applicants burden to comply with all zoning
requirements and obtain all required permits from Board of Health, Conservation Commission, Department
of public works and other applicable permit granting authorities.
' Variances are granted only to those applicants who meet the strict standards of MCL 40A. Contact the Office of
Planning & Development Cor more information.
I
DEG \ 6 2015 File No.
PERMITAPPLICMQN (§io.2)
e or print all information and return this form to the Building
Inspector's Office with the $30ftling fee (check or money order) payable to the
City ofNorthampton
L Owner of
3. Status of Applicant: Owner
4. Job Location:—14—
�..,_
Telephone:l�j' G1 �J/'S�S,„,,�,_�,.
Contract Purchaser Lessee_ Other (explain) Cm lJ, :f `
As
Parcel id: Zoning Map# Parcel# District(s):
In Elm Street District In Central Business District
(YO BE FILLED IN BY THE BUILDING DEPARTMENT)
5. Existing Use of Structure/ Property: g J✓+ti+
6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets If necessary(:
Adcl1r uY 3 J Zv mti..O+ fn a} c•a� QED �S
7. Attached Plans: Sketch Plan V Site Plan V Engineered/Surveyed Plans
8. Has a Speciat Permit/Vanaoce/Finding ever been issued forlon the site?
NO DONT KNOW V YES _— IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO DONT KNOW YES _,_
IF YES: enter Book __ Page and/or Document #
9.Does the site contain a brook, body of water or wetlands? NO _. ✓ DONT KNOW YES _
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained , date issued:
(Form Continues On Order Side)
W\DocnmeneT0Rh1S\origina0W1ding-InspecmNoning-permit-Applicatiompassive.doc 9/4/2004
10. Do any signs exist on the property? YES NO
IF YES, describe size, type and location:
Are there any proposed changes to or additions of signs intended for the property? YES
IF YES, describe size, type
11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common
plan of development that wilt disturb over i acre? YES_ NO ✓
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION
This column reserved
for use by the Building
Department
13. Certification: i hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
r
Date: I "11 Applicant's Signature ._
NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning
requirements and obtain all required permits from the Board of Health, Conservation Commission,
Historic and Architectnral Boards, Department of Public Works and other applicable permit granting
authorities.
W:1Documen6�F01iM8bdginarBuilding-InapecwdZnning-Permit-Application-psssive.&u 8/4/2W4
EXISTING
PROPOSED
REQUIRED BY
ZONING
Lot Size
Frontage
Setbacks Front
Side
Rear
L: R:
L: R:
L: R:
Building Height
Building Square Footage
% Open Space: (lot area
minus building & paved
arkiu
H of Parking Spaces
q of Loading Docks
Fill:
(volume a location
13. Certification: i hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
r
Date: I "11 Applicant's Signature ._
NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning
requirements and obtain all required permits from the Board of Health, Conservation Commission,
Historic and Architectnral Boards, Department of Public Works and other applicable permit granting
authorities.
W:1Documen6�F01iM8bdginarBuilding-InapecwdZnning-Permit-Application-psssive.&u 8/4/2W4
-------------_-----------------________________
I
- ----MOPERTY LINE
--
_
OACIL_
+—i- +--BUIL .'BEYARD3T
.-.
cRAss TO BE
TNLL
swmlxc is sr TALL 1
PRorecreo n
CaY.M W
MAINTAINED DURING
CONSTRUCTION
W
EXISTING BUILDING,
..._
' i
m
-
r�
N
I
I
W W
E%ISTING BUILDING-
NO WORK HERE
I
I
I
I
I
I
I
m
I
I
I-
I
i
ExIsnNG
I
� �
SPIE VUN
I
I
TROPERT '.nc- L
(1 anEvu�
L-1.0
g.�
offallautpiroym
tPERENNIAL
FLOWER BED
12FT TALL
FLOWERING
DECIDUOUSTREE
6FT TALL
ORNAMENTAL GRASS
3FTTALL
EVERGREEN SHRUB
STONE WALK/WALL
OR PLANTER
SIDEWALK
� �m
ITS
_ -
- ... auYss
EIEV�IICN
E-1.0
ElEmOP
CEte��
A-1.0
�I .W. -U]7
(D�
NEW
EVpiCN
DECK PONLX
pip
SECTS g
FLGVC
A-2.0
Code Review Thomas Douglas Architects Inc
74 Bridge $"at, Northampton, MA 196 Pleasant St.
Northampton, MA
CODE REVIEW
413-585-0641
December 15, 2015
74 Bridge Street, Northampton, MA
The Historic College Inn of Northampton
Applicable Building Code: MA 78o CMR Eighth Addition
IBC, IEBC International EXISTING Building Code, zoog
ZONING DISTRICT: URC
PROPOSED RENOVATIONS
PROJECT DESCRIPTION:
• Addition of a 3 season porch
Addition of a new side deck
Addition of anew 4 story residential elevator
• Renovations of the building will include
t. New bridge framing and opmneings where elvstor accesses each
floor level.
z. Roof: small area of over roofing and new TPO roof sheathing
Use Groups, Section aro
Rz. Non Transient Boarding House -No Changes proposed
Construction Type
5B
Sprinkler System
• The building is, or will be will be fully sprinkled with a NFPA 13 R system.
• No changes are proposed other than new coverage in new areas
Fire and Smoke Alarm & Detection
• A manual fire alarm system and an automatic smoke detection system will
be installed throughout the building.
• An independent Fire Alarm Vendor will supply the final alarm plans and
device specifications.
Seismic Zone
• See structural code review
1 of
Code Review Thomas Douglas Architects Inc
74 Bridge Street, Northampton, MA 196 Pleasant St.
Northampton, MA
413-585-0641
According to the IEBC this renovation is being reviewed as:
Prescriptive Compliance Method, Chapter 3
303 Alterations: Alterations to any building or structure shall comply with the
requirements of the IBC code for new construction.
3033 Existing Structural elements: see attached structural review.
Maximum AHowable Height/Area (section 503-506)
Section 504.2, Automatic sprinkler increase, states that for Group R buildings
equipped throughout with an approved sprinkler system in accordance with
Section 9038.1.2 (an NFPA r3R system) the maximum building height is
increased by 20 feet and maximum number of stories is increased by i story but
shall not exceed 4 stories and 6o ft.
Section 506.3 does not allow an area increase for 13R systems. Type 5B
construction allows a building up to 7,000 square feet per floor. The largest
floor of this building is 2,057 square feet and complies with maximum areas.
The total allowable building area is calculated using the formula in section
506.4.1. For buildings 3 stories or more above grade, multiply the allowable
building area per story from 5o6a by 3. The calculation is: 7,000 sq ft per story x
3 = 2i,000 square feet maximum building area. We propose a maximum
building size of 7,688 square feet and complies with maximum areas.
Maximum Allowable Height/Area
Type 5B
With NFPA 13R
(section 503-506)
Use: Rz
sprinklers
Maximum Hei ht Allowed
z story, 0 feet
Maximum Area Allowed PER
7,000
FLOOR
Height Increase per 5o6 (new^
Sprinklers & frontage
3 stories, 6o feet
allowed)
Note: the
basement does not
count as a story
above
_
rade.(5oz.r}
Area Increase per floor from 5o6
Sprinklers & frontage
o
(new allowed)
Proposed Areas by Floor, gross
Basement:
r r
First Floor22r4
Second Floor
i
zo
Third Floor
1626
2 of
Code Review Thomas Douglas Architects Inc
74 Bridge Street, Northampton, MA 196 Pleasant St.
Northampton, MA
413-585-0641
Fire Resistive Required Types of
Building Element
7,6$8
,_.._..
Pro osed Height Rz space
sko '-4" tall
Fire Resistive Required Types of
Building Element
Type 5B
Construction, Table 6ot & Goa
Primary Structural
0
Frame
Bearing walls, Exterior
o
Bearing walls, Interior
o
Nonbearing walls and
o
partitions, exterior
Nonbearing walls and
o
interior
i _partitions,
Floor construction and
o
secondary members
Roof construction and
o
1 secondary members
I
508.4 7073.8 Separated Occupancies
There is only one proposed type of occupancy in this building. There are no
separated occupancies.
508.4.2•.Allowable building area:
5o6a Building area modifications: Building areas from Table 503 shall NOT be
permitted to be increased due to frontage and sprinklers.
FIRE SEPARATIONS:
Table 509.2.5 Incidental Accessory Occupancies
• Furnace room: Where any piece of equipment is over 400,000 BTU per
hour input, a t hour fire separation or sprinklers are required.
• laundry rooms over too square feet: a t -hour fire separation or
sprinklers are required.
Table 508.4. Required Separation of Occupancies
• With a NFPA 13R sprinkler system and type 5B construction:
• 4zo.z Separation Walls: Walls separating dwelling units in the
same building shall be constructed as fire partitions.
• 7o9a Fire partitions, 709.3, tm8a, Fire Resistance rating,
3of7
Code Review Thomas Douglas Architects Inc
74 Bridge Street, Northampton, MA 146 Pleasant St.
Northampton, MA
413-585-0641
• I. Corridors: Corridor walls shall have a 1 -hour rating because of
the NFPA 13R system. The exception allowed by table rot8a is not
in effect.
• Dwelling unit and sleeping unit separations in buildings of type
213, 3B and 5B construction shall have fire resistance ratings of
not less than r hour in buildings equipped with an NFPA 13R
automatic sprinkler system.
• 712.3 Horizontal Assemblies, Fire resistance rating:
• Fire separations required between R use and R use: None Required
• Interior Stairway enclosures. see Exit enclosures, rozz below.
707.8 Penetrations: permitted by section 1022.4
1022.4
Penetrations into and openings through an exit enclosure are prohibited except for
required exit doors, equipment and duct work necessary for independent
ventilation or pressurization, sprinkler piping, standpipes, and electrical raceways
serving the exit enclosure.
vao7 Sound Transmission
• 1207.z Air -borne sound: Walls, partitions, and floor/ceiling assemblies
separating dwelling units from each other or from public or service areas
will be constructed to have required STC value of 5o. See the construction
drawings for code compliant assemblies.
• rzo7.3 Structure -borne sound: Floor/ceiling assemblies separating dwelling
units from each other or from public or service areas will be constructed to
have required impact insulation class (IIC) rating of not less than 50. See
the construction drawings for code compliant assemblies.
• See drawings for STC wall details and ratings.
Means of Egress
Section roo9a prescribes that the width of an interior stairway cannot be less than
44 inches. No changes to existing.
nr8.2 Corridor Width
The required corridor width for this project (with an occupancy of less than 50) is
36". Widths of corridors in this project vary, but the most narrow corridor in this
project is 3'-8". No changes to existing.
1018.4 Dead ends
4of7
Code Review Thomas Douglas Architects Inc
74 Bridge Street, Northampton, MA 196 Pleasant St.
Northampton, MA
411-585-0641
With an NFPA 13R automatic sprinkler system, dead end corridors are limited to
20 feet. This project does not have dead end corridors exceeding zo feet. No
changes to existing.
1015 Exit and Exit Access Doorways, roil Number of exits and continuity
In group Rz and R3 occupancies, one means of egress is permitted within and from
individual dwelling units with a maximum occupant load of zo where the dwelling
unit is equipped throughtout with an automatic sprinker system of NFPA 13 and
13R systems.
1o16a Travel Distance
• Exit access travel distance (1016.1) 25o feet, but modified by 1021.2 below.
This distance is the same for NFPA 13 and 13R systems.
• No changes to existing.
Travel
With NO
With sprinkler
Proposed max travel
Distance
sprinkler
System
distance
(roi6a)
System
Attic space
z50'
74 feet from attic corner to
2n4 floor exit stair
m22 Exit Enclosures
Interior exit stairways and interior exit ramps shall be enclosed with Fire Barriers
constructed in accordance with 707. Exit enclosures shall have a fire resistance
rating of not less than 1 hour where connecting less than 4 stories. No changes to
existing.
This building has an existing interior and exterior exit stair less than 4 stories and
we estimate that the interior walls have a fire resistance of 1 hour. The rating of the
existing doors is unknown. No changes to existing.
Exception: Stairs in apartments: Stairways serving and contained within a single
residential dwelling unitor sleeping unit in Group Ri, R2, or R3 are not required to
be enclosed. No changes to existing.
uo8.z Minimum Ceiling Height requirements
5of7
Code Review Thomas Douglas Architects Inc
74 Bridge Street, Northampton, MA 196 Pleasant Sc
Northampton, MA
413-5855-0641
Minimum required ceiling height: 7'-6'
If any room in a building has a sloped ceiling, the prescribed ceiling height for the
room is required in t'A of the area. Any portion of the room measuring less than 5
feet from the finished floor to the ceiling shall not be included in any computation
of the minimum area thereof. No changes to existing.
1029 Emergency Escape and Rescue
Exception i in section to29 allows sprinkler systems (NFPA 13 and 13R systems) to
be used in lieu of emergency escape and rescue openings.
805.2 Means of Egress Lighting
Means of egress lighting will be installed throughout the entire building
805.3 Exit signs
Means of egress throughout the entire building will have exit signs installed,
705.4.2 Door swing.
All means of egress doors will swing in the direction of travel.
too8.r.ro, 705.4.4 Panic hardware:
Not required since this is not an A or E or If use.
Chapter 9 Fire Protection Systems:
go3.2.8 Group R: An NFPA r3R automatic sprinkler system shall be provided
throughout all buildings with a Group R fire area.
The fire alarm vendor will supply a fire alarm narrative.
7rt Energy Conservation
Required values according to the MA stretch code for this Existing building:
MA: climate zone 5A
All existing ceilings, walls or floor cavities of the building envelope exposed or
accessible during construction will be filled with insulation that meets or exceeds
an R -value of R-3.5 per inch.
The roof will be insulated and air sealed.
Any new replacement windows will have a maximum U value of 0.4
Any new entrance doors will have a maximum U value of o.8
Level 3 alterations are permitted without requiring the entire building to comply
with the International Energy Conservation Code. Alterations (new construction)
shall comply with the International Energy Conservation Code.
A building that undergoes Level 3 alterations is required to meet a certain level of
energy compliance.
6 of
Code Review Thomas Douglas Architects Inc
74 Bridge Street, Northampton, MA 196 Pleasant St.
Northampton, MA
413-585-0641
Any new element within the work area is required to meet the International
Energy Conservation Code.
Elements within the building that are not being affected do not heed to be
evaluated and do not nee to comply with the energy provisions. Essentially the
entire building is not required to meet the energy provisions; only a degree of
possible improvement in the energy performance of the building is intended to be
achieved by making the new elements meet the IECC. In certain cases where the
reconfiguration of the space might have resulted in the creation of new spaces the
newly created space should be evaluated as a whole for compliance with the
energy provisions even though some of the element within the space might
actually not have been altered. Likewise, in a case where an existing mechanical
system is being extended to other areas or new ductwork is being installed to
reconfigure and reroute the ducts to various spaces, it is only required to have the
new elements meet the energy provisions and not the entire system.
8o6 Accessibility
CMR 521
The work is within a private dwelling unit & thus does not need to be in
compliance with CMR 521
• End of Document