Loading...
17105-Field Report 02 (Dunkin)AHARONIAN & ASSOCIATES INC. - ARCHITECTS 310 George Washington Highway - Suite 100 - Smithfield, Rhode Island 02917 T 401-232-5010 F 401-232-5080 FIELD REPORT #2 REPORT DATE: 11/14/18 DUNKIN' DONUTS BUILDING Northampton, MA Aharonian Job No. 17105.01 DATE TIME WEATHER TEMPERATURE 11/09/18 09:30 AM Cloudy +/- 40 degrees F PRESENT AT SITE: Jackie Brousseau – Aharonian Associates, Inc Manny Sardinha – Owner Various Subcontractors & Employees of Homeland Builders, Inc To the best of our knowledge, the Work being performed is in accordance with the Contract Documents, unless noted otherwise, and is progressing as described below. WORK IN PROGRESS: 1)Rough framing 90% complete. 2)Insulation 100% complete. 3)Interior substrate installation just started. 4)Rough plumbing 95% complete. 5)Rough electrical 100% complete. 6)Ductwork installation 75% complete. 7)Exterior Finish work 75% complete. 8)Site work on-going. OBSERVATIONS / ACTION REQUIRED: 9)Door #105 from the Alcove to the Back Room was corrected since previous visit and is in compliance with the Construction Documents. 10)The missing diagonal bracing was corrected at the back line soffit and is in compliance with the Construction Documents. Diagonal bracing is still missing from smaller soffits, per details 2/A1.3 & 5/A1.3. 11)The Drive-Thru canopy framing was corrected at the LvL's, but the posts & caps were incorrect. The LVL's shall be secured to the roof as detailed and shown on 2/A4.2 & S1.2. 12)The shear walls were corrected at all areas except for the Vestibule. The framing was not completed per Drawing SKA-2. The GC shall modify/add the shear wall posts & fasteners per details and locations on Drawing SKA-2. Due to the shortened length of the shear walls, 1/2” plywood shall be added on the interior side of the shear walls, and adjacent walls for continuity, per SKA-3 (attached). 13)A King stud shall be added on either side of the 12'-0” long window (F5) on the North side, per Drawing S1.2. 14)The water lines for the toilets have not been corrected, and shall be increased to 1-1/4” to accommodate tankless toilets. Page 1 of 2 Aharonian & Associates Inc. 310 George Washington Highway, Suite 100, Smithfield, RI 02917 15)EF-2 shall be moved to comply with code. As noted on A1.4, General note #5, all rooftop equipment (including exhaust fans) Fans shall be be located 10'-0” away from roof edge. This applies to any parapet walls that are less than 42” tall. 16)There were (3) posts installed at the kneewall. Per detail 12/A6.2, the posts shall be installed at 48” oc max. 17)The pre-fab canopies at the entrances were installed with built-in gutters. The gutters shall be connected to downspouts, brought back to the building at the top and run down the wall. The downspouts shall connect to an underground pipe, discharged into a nearby green area. REPORT BY: Jackie Brousseau Project Manager CC: Emanuel Sardinha – Owner Cliff Medeiros – Construction Manager Louis Hasbrouck – Building Commissioner Dunkin' Donuts, Northampton MA Field Report #2 Page 2 of 2